Construction of a photovoltaic power plant up to 0,7 MW in Rogóż (Q131870)

From EU Knowledge Graph
Revision as of 16:16, 21 October 2020 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in 1 language: translated_label)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of a photovoltaic power plant up to 0,7 MW in Rogóż
Project in Poland financed by DG Regio

    Statements

    0 references
    2,209,555.21 zloty
    0 references
    530,293.25 Euro
    13 January 2020
    0 references
    2,761,944.01 zloty
    0 references
    662,866.56 Euro
    13 January 2020
    0 references
    80.0 percent
    0 references
    2 March 2020
    0 references
    31 August 2020
    0 references
    PV R-Z SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
    0 references
    0 references

    54°7'16.7"N, 20°33'31.0"E
    0 references
    Planowana inwestycja polegać będzie budowie elektrowni fotowoltaicznej o mocy do 0,7 MW. Naziemna elektrownia fotowoltaiczna złożona z polikrystalicznych paneli wraz z przyłączem energetycznym i infrastrukturą towarzyszącą o mocy do 700 kW.firmy PV R-Z sp. z o.o. zlokalizowana będzie na działkach nr 108/1, 110/1 i 362 w miejscowości Rogóż. Będzie wykorzystywała 2592 szt. paneli fotowoltaicznych o mocy 27W każdy. Wnioskodawca posiada pozwolenie na budowę oraz decyzję o środowiskowych uwarunkowaniach z 23.06.2016 r.. Uzyskana energia będzie sprzedawana do ogólnopolskiego operatora energii elektrycznej. Realizacja projektu jest uzasadniona zarówno ekonomicznie, środowiskowo, społecznie i gospodarczo oraz przyczyni się do osiągania założonych przez Unię Europejską wytycznych. Celem głównym projektu jest zwiększenie udziału odnawialnych źródeł energii w ogólnym bilansie energetycznym w woj. warmińsko-mazurskim poprzez zakup i montaż instalacji fotowoltaicznej o mocy do 700 kW przez firmę PV R-Z Sp. z o.o. w miejscowości Rogóż do sierpnia 2020 r. Zakres projektu: - instalacja fotowoltaiczna-montaż paneli fotowoltaicznych o mocy do 700 kW na gotowej systemowej konstrukcji - koszt kwalifikowalny - linia napowietrzno-kablowa- częściowo k.kwal. - stacja kontenerowa-k.kwal. - ogrodzenie-k.niekwalifikowalny - monitoring-k.niekwal. - pozostałe roboty budowlane-k.niekwal. Projekt jest zgodny ze Strategią rozwoju społeczno-gospodarczego województwa warmińsko- mazurskiego do roku 2025 oraz wpisuje się w SZOOP RPO WiM 2014-2020 gdyż przyczynia się do realizacji zaplanowanych ww. dokumentach celów, wskaźników i rezultatów, jest zgodny z możliwymi do dofinansowania formami wsparcia oraz typem beneficjentów . Projekt realizuje cel Działania 4.1 zwiększony udział odnawialnych źródeł energii w ogólnym bilansie energetycznym regionu poprzez zakup i montaż instalacji fotowoltaicznej o mocy 700 kW. Projekt zakończy się w ciągu 1 roku od daty podpisania umowy o dofinansowanie. (Polish)
    0 references
    The planned investment will consist of the construction of a photovoltaic power plant with a capacity of up to 0,7 MW. A terrestrial photovoltaic power plant consisting of polycrystalline panels with power connection and infrastructure up to 700 kW.PV R-Z sp. z o.o. will be located on plots no. 108/1, 110/1 and 362 in Rogóż. It will use 2592 units of photovoltaic panels with a power of 27 W each. The applicant has a building permit and decision on environmental conditions of 23.06.2016. The resulting energy will be sold to a nationwide electricity operator. The implementation of the project is justified both economically, environmentally, socially and economically and will contribute to achieving the guidelines established by the European Union. The main objective of the project is to increase the share of renewable energy sources in the overall energy balance in the Warmia-Mazury Voivodeship by purchasing and assembling a photovoltaic installation of up to 700 kW by PV R-Z Sp. z o.o. in Rogóż until August 2020. Scope of the project: — photovoltaic installation-assembly of photovoltaic panels with power up to 700 kW on the finished system construction – the eligible cost – the overhead and cable line – part of the quarry. — container station-k. quaval. — fence-k. ineligible – monitoring-k.not. — other construction works-k.ink. The project is consistent with the strategy of socio-economic development of Warmia-Mazury voivodship until 2025 and is in line with SZOOP RPO WiM 2014-2020 as it contributes to the realisation of the objectives, indicators and results planned above, is consistent with the co-financed forms of support and the type of beneficiaries. The project fulfils the objective of Measure 4.1 increased share of renewable energy sources in the overall energy balance of the region through the purchase and assembly of a photovoltaic plant with a capacity of 700 kW. The project will be completed within 1 from the date of signing the grant agreement. (English)
    21 October 2020
    0 references

    Identifiers

    RPWM.04.01.00-28-0255/17
    0 references