Investments in RES in PHU Katarzyna Zięba (Q131842)

From EU Knowledge Graph
Revision as of 16:16, 21 October 2020 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in 1 language: translated_label)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Investments in RES in PHU Katarzyna Zięba
Project in Poland financed by DG Regio

    Statements

    0 references
    166,413.42 zloty
    0 references
    39,939.22 Euro
    13 January 2020
    0 references
    195,780.49 zloty
    0 references
    46,987.32 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    6 April 2017
    0 references
    30 September 2020
    0 references
    KATARZYNA ZIĘBA FIRMA PRODUKCYJNO-­HANDLOWO-­USŁUGOWA
    0 references
    0 references

    53°52'7.7"N, 20°57'18.7"E
    0 references
    PRZEDMIOT PROJEKTU: Budowa 2 instalacji fotowoltaicznych na działkach Wnioskodawcy, w lokalizacjach prowadzenia działalności gospodarczej (11-300 Biskupiec, pow. olsztyński, woj. warmińsko-mazurskie), tj.: 1. Biskupiec, Adamowo 5, dz. 133/3 (nr ewidencyjny działki: 281402_5.0027.133/3) 2. Biskupiec, ul. 1-go Maja 19b, dz.: 65/8 (nr ewidencyjny działki: 281402_4.0004.65/8) Charakterystyka obu instalacji: - instalacja fotowoltaiczna o mocy 19,8 kW posadowiona na dachu budynku - panele PV monokrystaliczne 300W w liczbie 66 szt. - instalacja osadzona na konstrukcji stalowej połączonej ze stelażem pod panele PV Zadaniem projektowanych instalacji fotowoltaicznych jest wytworzenie energii elektrycznej o parametrach sieci elektroenergetycznej, a następnie zagospodarowanie jej w wewnętrznej instalacji elektrycznej przez odbiorcę. ETAPY REALIZACJI PROJEKTU: - złożenie wniosku o do?nansowanie - podpisanie umowy o do?nansowanie - wybór wykonawcy zgodnie z zasadą konkurencyjności - zawarcie umowy z wykonawcą i rozpoczęcie prac - realizacja prac zgodnie z założonym harmonogramem - zakończenie projektu i podpisanie protokołu końcowego - końcowe rozliczenie projektu SPOSÓB WDRAŻANIA PROJEKTU: - wybór wykonawcy zgodnie z zasadą konkurencyjności - podpisanie umowy z wykonawcą - montaż instalacji - zakończenie projektu, podpisanie protokołu końcowego, płatność końcowa Projekt wpisuje się w założenia wpisane w SzOOP RPO WiM realizując założony cel: Zwiększony udział OZE w ogólnym bilansie energetycznym regionu. Realizacja poddziałania pozwoli na zwiększenie udziału energii odnawialnej w bilansie energ. wnioskodawcy, co wpłynie na zwiększenie udziału energii odnawialnej w bilansie energ. Regionu. Wpłynie to na ograniczenie emisji szkodliwych gazów i pyłów do atmosfery oraz dzięki wykorzystaniu lokalnych źródeł energii odnawialnej zwiększy konkurencyjność regionu. W wyniku realizacji inwestycji spadną koszty związane z zużyciem energii (Polish)
    0 references
    SUBJECT MATTER OF THE PROJECT: Construction of 2 photovoltaic installations on the Applicant’s plots, in locations of conducting business activity (11-300 Biskupiec, Olsztyn, Warmia-Mazurskie voivodship), i.e.: 1. Bishop, Adamowo 5, dz. 133/3 (Evidence No of the plot: 281402_5.0027.133/3) 2. Bishop, ul. May 1st 19b, Dz.: 65/8 (Evidence No of the plot: 281402_4.0004.65/8) Characteristics of both installations: — 19.8 kW photovoltaic installation located on the roof of a building – PV monocrystalline panels 300 W in the number of 66 pieces. — installation embedded on a steel structure connected to a frame for PV panels The task of the designed photovoltaic installations is to generate electricity with the parameters of the electricity grid, and then to develop it in the internal electrical installation by the customer. STAGES OF PROJECT IMPLEMENTATION: — submission of an application for funding – signing of a financing agreement – selection of the contractor in accordance with the principle of competitiveness – conclusion of the contract with the contractor and commencement of works – implementation of the work according to the planned timetable – completion of the project and signing of the final protocol – final settlement of the project REPORT OF PROJECT: — selection of the contractor in accordance with the principle of competitiveness – signing of the contract with the contractor – installation installation – completion of the project, signing of the final protocol, final payment The project fits into the assumptions entered in the SzOOP RPO WiM fulfilling the objective of: Increased share of RES in the overall energy balance of the region. The implementation of the sub-measure will increase the share of renewable energy in the applicant’s energy balance, which will increase the share of renewable energy in the energy balance. It’s a region. This will reduce emissions of harmful gases and dust into the atmosphere and by using local renewable energy sources will increase regional competitiveness. As a result of the investment, energy consumption costs will fall (English)
    21 October 2020
    0 references

    Identifiers

    RPWM.04.01.00-28-0226/17
    0 references