Revitalisation of the Baptist Church in Elk and its surroundings (Q132804)

From EU Knowledge Graph
Revision as of 16:02, 21 October 2020 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in 1 language: translated_label)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Revitalisation of the Baptist Church in Elk and its surroundings
Project in Poland financed by DG Regio

    Statements

    0 references
    0 references
    1,971,544.14 zloty
    0 references
    473,170.59 Euro
    13 January 2020
    0 references
    2,577,181.88 zloty
    0 references
    618,523.65 Euro
    13 January 2020
    0 references
    76.5 percent
    0 references
    18 May 2017
    0 references
    31 December 2019
    0 references
    ZBÓR KOŚCIOŁA CHRZEŚCIJAN BAPTYSTÓW W EŁKU
    0 references

    53°49'26.4"N, 22°21'42.8"E
    0 references
    Projekt realizowany w mieście Ełk, na obszarze „Śródmieście-centrum” – wyznaczonym do rewitalizacji w ramach ZIT. Projekt został uwzględniony w Programie Rewitalizacji Ełku na lata 2016-2023 , jako projekt podstawowy nr 46 Renowacja zabytkowego budynku kościoła oraz otoczenia. Miejsce realizacji inwestycji objęte jest Miejskim Planem Zagospodarowania Przestrzennego, zwanego ‘EŁK-ŚRÓDMIEŚCIE”. Przedmiotowa inwestycja będzie zlokalizowana na działkach nr: 388, 380, 373/3, 373/49, których właścicielem jest Zbór Kościoła Chrześcijan Baptystów w Ełku oraz Gmina Miasto Ełk (dla działki nr 388, na której użytkowanie Wnioskodawca posiada zgodę). Projekt zakłada zrealizowanie następujących zadań inwestycyjnych: 1. Adaptacja i modernizacja budynku zborowego na Chrześcijańskie Centrum Wsparcia Rodziny wraz z montażem windy oraz zakupem niezbędnego wyposażenia, wpływającego na unowocześnienie obiektu, 2. Renowacja elewacji zabytkowego budynku kościoła (prace konserwatorsko-remontowe elewacji ceglanej kościoła wpisanego do rejestru zabytków), 3. Wymiana ogrodzenia posesji, 4. Utworzenie placu zabaw, 5. Wykonanie iluminacji kościoła. Projekt posiada pozwolenie na budowę, opr. dok. tech., wymagane dok. środowiskowe. Realizacja projektu V.2017-V.2019 r. Projekt wpisuje się w założenia SzOOP RPO WiM, Działanie 8.3 Rewitalizacja miejskiego obszaru funkcjonalnego Ełku – ZIT bis. Działania ujęte w projekcie odpowiadają dwóm typom projektów przewidzianych do wsparcia. Projekt realizuje cel szczegółowy z SzOOP dla działania 8.3: Lepsza jakość życia społeczności zamieszkujących obszary problemowe. Projekt komplementarny do proj. społ. Razem przeciw wykluczeniu społecznemu (schemat A) (projekt pdst. nr 15, złożony do dofinans. w ramach EFS). Projekt uwzględnia limity i ograniczenia w realizacji projektów. (Polish)
    0 references
    The project is implemented in the city of Ełk, in the area “Śródmieście-centrum” – designated for revitalisation as part of the ZIT. The project was included in the Elk Regeneration Programme for the years 2016-2023, as basic project No. 46 Renovation of the historic church building and surroundings. The location of the investment is covered by the Urban Spatial Development Plan, called ‘Ełk-Śródmieście’. This investment will be located on plots no.: 388, 380, 373/3, 373/49, owned by the Church of Baptist Christians in Elk and the Municipality of the City of Elk (for plot no.388, on which the Applicant has the consent). The project assumes the following investment tasks: 1. Adaptation and modernisation of the Congregation Building for the Christian Family Support Centre with the installation of the elevator and the purchase of the necessary equipment, affecting the modernisation of the facility, 2. Renovation of the facade of the historic church building (conservation and renovation works of the brick facade of the church inscribed in the register of monuments), 3. Replacement of the property fence, 4. Creating a playground, 5. The illumination of the church. The project has a construction permit, c. tech., required to doc. environmental. Implementation of the V.2017-V.2019 project. The project fits into the assumptions of SzOOP RPO WiM, Measure 8.3 Revitalisation of the urban functional area of Ełku – ZIT bis. The actions included in the project correspond to two types of projects to be supported. The project pursues the specific objective of the Shoop for Action 8.3: Better quality of life for communities living in problem areas. A project complementary to the project. Together against social exclusion (Schemate A) (project pdst. No 15, submitted to funding under the ESF). The project shall include limits and limitations in the implementation of projects. (English)
    21 October 2020
    0 references

    Identifiers

    RPWM.08.03.00-28-0002/17
    0 references