“Securing the defensive walls” (Q132770)

From EU Knowledge Graph
Revision as of 15:48, 21 October 2020 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in 1 language: translated_label)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
“Securing the defensive walls”
Project in Poland financed by DG Regio

    Statements

    0 references
    904,481.98 zloty
    0 references
    217,075.68 Euro
    13 January 2020
    0 references
    1,182,329.39 zloty
    0 references
    283,759.05 Euro
    13 January 2020
    0 references
    76.5 percent
    0 references
    7 April 2017
    0 references
    30 April 2019
    0 references
    GMINA MIEJSKA LIDZBARK WARMIŃSKI
    0 references
    0 references

    54°7'50.2"N, 20°33'53.6"E
    0 references
    Przedsięwzięcie realizowane będzie w Lidzbarku Warmińskim, ul. Dębowa i pl. Kościelnym (działki nr: 113, 114/1, 114/2, 115/1, 115/2, 128/1, 150, 156, 157 obr.7.). Zakres projektu: 1) remont muru na ul. Dębowej, w tym przemurowanie i odbudowa fragmentów muru, uzupełnienie ubytków i spoin, naprawa spękań lica muru, wymiana betonowych czap zwieńczenia muru na ceglane, usunięcie zieleni, wykonanie opaski z kostki kamiennej wzdłuż podstawy muru. 2) remont muru na ul. Plac Kościelny, w tym przemurowanie i odbudowa fragmentów muru, uzupełnienie ubytków i spoin, naprawa spękań lica muru, naprawa i uzupełnienie ceglanych zwieńczeń muru, rozebranie i ponowne wymurowanie zawalonego i zniszczonego odcinka muru ze wzmocnieniem konstrukcji fundamentu oraz odbudowa zawalonej drogi kościelnej i wykonanie odwodnienia liniowego. Etapy realizacji projektu: -złożenie wniosku o dof. -podpisanie umowy o dof. -wybór wykonawcy zgodnie z konk. -zawarcie umowy z wykonawcą i rozpoczęcie prac -realizacja prac zgodnie z założonym harmonogramem -zakończenie projektu i podpisanie protokołu końcowego -końcowe rozliczenie projektu sposób wdrażania zakr. rzeczowego: -podpisanie umowy -realizacja prac -odbiór końcowy i podpisanie prot Projekt wpisuje się w SZOOP RPO WWM realizując cel: „Lepsza jakość życia społeczności zamieszkujących obszary problemowe”. Z projektu będą mogli korzystać wszyscy Interesariusze w tym mieszkańcy zamieszkujący teren zdegradowany. Projekt uporządkuje przestrzeń społeczną przez co wzmocni również potencjał turystyczny, mury zlokalizowane są w ciągu spacerowym pomiędzy Kościołem pw. św. Piotra i Pawła a Wysoką Bramą oraz w bezpośrednim sąsiedztwie Bulwaru nad Łyną. (Polish)
    0 references
    The project will be implemented in Lidzbark Warminski, ul. Oak and pl. Ecclesiastical (parts no.: 113, 114/1, 114/2, 115/1, 115/2, 128/1, 150, 156, 157, 7). Scope of the project: 1) renovation of the wall on ul. Oak, including bricking and rebuilding of wall fragments, replenishment of cavities and joints, repair of wall cracks, replacement of concrete caps of the culmination of the brick wall, removal of greenery, making a band from a stone cube along the base of the wall. 2) renovation of the wall on ul. Church Square, including bricking and reconstruction of wall fragments, replenishment of defects and joints, repair of the wall’s cracks, repair and replenishment of the brick crowns of the wall, dismantling and re-painting of the collapsed and damaged section of the wall with reinforcement of the foundation structure and reconstruction of the collapsed church road and carrying out linear drainage. Stages of project implementation: —submission of an application for DOF. —signing of the DOF agreement. —the selection of the contractor according to the end. —conclusion of the contract with the contractor and commencement of work -implementation of works according to the established timetable -completion of the project and signing of the final protocol – final settlement of the project method of implementation in kind: —conclusion of the contract -implementation of works -final reception and signing of the protocol The project fits into SZOOP RPO WWM with the aim of: Better quality of life for communities living in problem areas. The project will be open to all Stakeholders including residents living in a degraded area. The project will organise the social space, which will also strengthen the tourist potential, and the walls are located in a walk between the Church of St. Peter and Paul and the High Gate and in the immediate vicinity of the Boulevard above Łyna. (English)
    21 October 2020
    0 references

    Identifiers

    RPWM.08.01.00-28-0028/17
    0 references