Construction of a water mains and a sanitary sewage system in Zielinski ul. Post and solar (Q124214)

From EU Knowledge Graph
Revision as of 12:29, 21 October 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The project consists of the reconstruction of the water supply network and the construction of a sewerage network in the area of ul. Polna and Słoneczna w Ziemięcice in the commune of Zbrosławice and their inclusion in existing sections of the water-can network in Ziemięcice on ul. Mikulczycka, Sunny and Walking. The length of the water supply system is 760.33 m and 205.29 m of connections, while the length of the sewage network is 716.59 m with...)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of a water mains and a sanitary sewage system in Zielinski ul. Post and solar
Project in Poland financed by DG Regio

    Statements

    0 references
    552,425.0 zloty
    0 references
    132,582.0 Euro
    13 January 2020
    0 references
    1,377,962.13 zloty
    0 references
    330,710.91 Euro
    13 January 2020
    0 references
    40.09 percent
    0 references
    14 December 2017
    0 references
    31 December 2018
    0 references
    GMINA ZBROSŁAWICE
    0 references

    50°24'56.2"N, 18°45'7.9"E
    0 references
    Projekt polega na przebudowie sieci wodociagowej i budowie sieci kanalizacyjnej na terenie ul. Polnej i Słonecznej w Ziemięcicach w gminie Zbrosławice i włączeniu ich do istniejących już odcinków sieci wod-kan w Ziemięcicach przy ul. Mikulczyckiej, Słonecznej i Spacerowej. Długość sieci wodociągowej to 760,33m i 205,29m przyłączy, zaś długość sieci kanalizacyjnej to 716,59m z 29 studzienkami kanalizacyjnymi. (Polish)
    0 references
    The project consists of the reconstruction of the water supply network and the construction of a sewerage network in the area of ul. Polna and Słoneczna w Ziemięcice in the commune of Zbrosławice and their inclusion in existing sections of the water-can network in Ziemięcice on ul. Mikulczycka, Sunny and Walking. The length of the water supply system is 760.33 m and 205.29 m of connections, while the length of the sewage network is 716.59 m with 29 sewage wells. (English)
    21 October 2020
    0 references

    Identifiers

    RPSL.05.01.01-24-07A7/16
    0 references