“Construction of a photovoltaic farm up to 1 MW in Wet” (Q127508)

From EU Knowledge Graph
Revision as of 11:48, 21 October 2020 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in 1 language: translated_label)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
“Construction of a photovoltaic farm up to 1 MW in Wet”
Project in Poland financed by DG Regio

    Statements

    0 references
    2,479,415.42 zloty
    0 references
    595,059.70 Euro
    13 January 2020
    0 references
    3,542,022.02 zloty
    0 references
    850,085.28 Euro
    13 January 2020
    0 references
    70.0 percent
    0 references
    1 July 2018
    0 references
    30 September 2019
    0 references
    FOTOZE SPÓŁKA AKCYJNA
    0 references
    0 references
    Celem proj. jest ZWIĘKSZENIE UDZIAŁU ENERGII ELEKTRYCZNEJ PRODUKOWANEJ Z OZE W OGÓLNEJ PRODUKCJI ENERGII W WOJ. ŚWIĘTOKRZYSKIM. Długofalowymi korzyściami proj. będą spadeki emisji gazów cieplarnianych poprzez budowę FARMY FOTOWOLTAICZNEJ o mocy do 1MWe w m.Mokra,1,3km od obszarów NATURA2000. ZAKRES PROJ. OBEJMUJE: roboty budowlano-montażowe: budowę linii Sn, stacji trafo, rozdzielni w stacji trafo; montaż: paneli PV, konstrukcji pod moduł PV, inwerterów, uruchomienie farmy; montaż: gł. rozdzielni, instalacji uziemiającej i DC, oprzewodowania AC, system monitorująco-kontrolujący, oświetlenia, ogrodzenia, drogi, przyłącza kablowego SN; nadzór inwestorski, dz. prom. i inform. WSZYSTKIE ELEMENTY PROJ. BĘDĄ NOWE, PODPORZĄDKOWANE FUNKCJI JAKIEJ MAJĄ SŁUŻYĆ, TJ. PRODUKCJI ENERGII ELEKTRYCZNEJ Z OZE. W PROJ. BUDOWLANYM ZAPROJEKTOWANO ROZWIĄZANIA TECHNICZNE SPEŁNIAJĄCE WYMOGI BAT I NAJLEPSZYCH DOSTĘPNYCH TECHNIK. Okres realiz. :01.07.- 30.09.2019. Działania są zgodne z PGN dla G. Stąporków, Progr. ochrony powietrza WŚ, z Dyr.2012/27/UE, z zapisami Umowy Partn., RPOWŚ 2014-2020, SZOP. Instalacja spełnia standardy określone w Wytycznych kwalifikowania wydatków RPO. Projekt zgodny z celami szcz. osi prior. 3 – Efektywna i zielona energia i działaniem 3.1 Wytwarzanie i dystrybucja energii pochodzącej z OZE. Proj. jest zgodny z zas. horyzontalnymi UE, nie powoduje ingerencji w środowisko naturalne, zmianę klimatu, nie ma wpływu na ryzyko powodziowe. Wsk. produktu: L.przedsięb. otrzymujących wsparcie:1; L.wybudowanych jednostek wytwarzania energii elektrycznej z OZE:1. Wsk. rezultatu: Produkcja energii elektrycznej z nowo wybudowanych/nowych mocy wytwórczych instalacji wykorzystujących OZE: 991,914 MWhe/r; Szacowany roczny spadek emisji gazów cieplarnianych: 803,45 tony równoważnika CO2/r; Dodatkowa zdolność wytwarzania energii elektrycznej ze źródeł odnawialnych: 0,998MWe; Wzrost zatrudnienia we wspieranych przedsiębiorstwach:1EPC; Wzrost zatrudnienia[…]-mężczyźni:1EPC (Polish)
    0 references
    The aim of the project is to increase the ELECTRIC ENERGY ENERGY produced from the overall energy production in the region. IT’S A SAINTLY ONE. The long-term benefits of the project will be reductions in greenhouse gas emissions by building a PVF with power up to 1MWe in Wet, 1.3 km from NATURA2000. THE SCOPE OF THE PROJECT. INCLUDES: construction and assembly works: construction of the Sn line, trafo station, trafo station; assembly: PV panels, constructions for PV modules, inverters, start-up of the farm; assembly: depth of switchgear, grounding and DC, AC wiring, monitoring and control system, lighting, fences, roads, cable connection SN; investor supervision, ferry and information. ALL ELEMENTS OF THE PROJECT. THEY WILL BE NEW, SUBORDINATE TO THE FUNCTIONS THEY ARE TO SERVE, I.E. PRODUCTION OF ELECTRICITY FROM RES. IT’S A PROJECT. TECHNICAL SOLUTIONS WERE DESIGNED TO MEET THE BAT REQUIREMENTS AND THE BEST AVAILABLE TECHNIQUES. Period of realisation. 01.07.- 30.09.2019. The activities are compatible with PGN for G. Stąporków, WŚ Air Protection Progr., with Division 2012/27/EU, with the provisions of Partn. Agreement, RPOWŚ 2014-2020, SZOP. The installation complies with the standards set out in the ROP expenditure eligibility guidelines. The project is compatible with the objectives of the prior axis. 3 – Efficient and green energy and action 3.1 Manufacturing and distribution of RES energy. The project is consistent with the EU’s horizontal resources, does not cause environmental interference, climate change, has no impact on flood risk. Product Specification: L. the recipients of support:1; L. built-up units of electricity generation from RES:1. For the result: Production of electricity from newly built/new RES installations: 991,914 MWhe/r; Estimated annual reduction in greenhouse gas emissions: 803,45 tonnes of CO2/r equivalent; Additional capacity to generate electricity from renewable sources: 0,998MWe; Employment growth in supported enterprises:1EPC; Employment growth[...]—men:1EPC (English)
    21 October 2020
    0 references

    Identifiers

    RPSW.03.01.00-26-0060/17
    0 references