A laboratory for a smart energy efficient construction based on waste materials (Q127188)

From EU Knowledge Graph
Revision as of 11:10, 21 October 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Modern intelligent construction is GIELONE BUDOWNICTWO. Many energy-efficient construction technologies are currently being developed, but none of them is based on the use of raw materials and waste-based materials or UPS – by-products of incineration. Another issue is the fact that the above-mentioned green technology is dedicated to new construction. The technology planned to develop will be dedicated in particular to old buildings, the produc...)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
A laboratory for a smart energy efficient construction based on waste materials
Project in Poland financed by DG Regio

    Statements

    0 references
    2,513,476.39 zloty
    0 references
    603,234.33 Euro
    13 January 2020
    0 references
    4,262,465.19 zloty
    0 references
    1,022,991.65 Euro
    13 January 2020
    0 references
    58.97 percent
    0 references
    1 December 2018
    0 references
    30 December 2020
    0 references
    “ELPOLOGISTYKA” SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
    0 references
    0 references
    Nowoczesne inteligentne budownictwo to ZIELONE BUDOWNICTWO. Aktualnie powstaje wiele technologii energooszczędnego budownictwa, jednak żadna z nich nie opiera się na wykorzystaniu surowców i materiałów na bazie odpadów bądź UPS – ubocznych produktów spalania. Kolejną kwestią jest fakt, że ww. zielone technologię są dedykowane nowemu budownictwu. Planowana do opracowania technologia dedykowana będzie w szczególności starym budynkom, opracowane w ramach projektu produkty stanowić będą nowe rozwiązania wykorzystane przy modernizacji energetycznej istniejących budynków. Cele jakie przyświecają Projektowi to: 1) minimalizacja zanieczyszczenia środowiska dzięki efektywnemu zagospodarowaniu odpadów, 2) opracowanie tanich i efektywnych rozwiązań dla budownictwa energooszczędnego na bazie tanich materiałów, 3) optymalizacja zużycia energii do poziomu energooszczędnego w modernizowanych budynkach poprzez zastosowanie opracowanych materiałów. Projekt jest innowacyjny w założeniach i celach na poziomie kraju. Prace B+R zostały ujęte w 4 zadaniach: 1) analiza dostępnych materiałów i surowców stosowanych w budownictwie 2) opracowanie parametrów docelowego rozwiązania 3) budowa stanowiska badawczego 4) przeprowadzenie testów na stanowisku bad. Projekt znajduje się obecnie na IV TRL. Dzięki przeprowadzeniu projektu osiągnie maksymalny poziom - IX poziom. W wyniku realizacji projektu zostaną osiągnięte wskaźniki kluczowe produktu, m.in. zrealizowany zostanie projekt B+R (1), zostanie wsparte laboratorium badawcze (1). Zostaną osiągnięte wskaźniki rezultatu, m.in. zostaną wprowadzone innowacje: produktowa (1), procesowa (1) i nietetechnologiczna (1). Przeprowadzona analiza konkurencji oraz popytu potwierdza zapotrzebowanie rynkowe na rezultat projektu. Zakres projektu jest zgodny z Inteligentną Specjalizacją – ZASOBOOSZCZĘDNE BUDOWNICTWO, a cel projektu (realizacja prac B+R) jest zgodny z celem Działania 1.2 RPO WŚ. (Polish)
    0 references
    Modern intelligent construction is GIELONE BUDOWNICTWO. Many energy-efficient construction technologies are currently being developed, but none of them is based on the use of raw materials and waste-based materials or UPS – by-products of incineration. Another issue is the fact that the above-mentioned green technology is dedicated to new construction. The technology planned to develop will be dedicated in particular to old buildings, the products developed within the project will be new solutions used for the energy modernisation of existing buildings. The objectives of the Project are: 1) minimising environmental pollution through efficient waste management, 2) developing cheap and efficient solutions for energy-saving construction based on low-cost materials, 3) optimising energy consumption to an energy-efficient level in modernised buildings through the use of developed materials. The project is innovative in assumptions and objectives at national level. R & D work has been included in 4 tasks: 1) Analysis of available materials and raw materials used in construction 2) elaboration of target parameters of solution 3) construction of a research bench 4) conducting tests at the bad bench. The project is currently on the IV TRL. By carrying out the project, it will reach the maximum level – IX level. As a result of the project, key indicators of the product will be achieved, including the R & D project (1), the research laboratory will be supported (1). Results indicators will be achieved, including innovations: product (1), process (1) and non-tetechnological (1). The analysis of competition and demand confirms the market demand for the outcome of the project. The scope of the project is compatible with Intelligent Specialisation – resource-efficient BUDOWNICTWO, and the objective of the project (realisation of R & D works) is consistent with the objective of Measure 1.2 of the WWW ROP. (English)
    21 October 2020
    0 references

    Identifiers

    RPSW.01.02.00-26-0040/17
    0 references