No label defined (Q119275)

From EU Knowledge Graph
Revision as of 16:40, 20 October 2020 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in 1 language: remove_english_label)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
No label defined
Project in Poland financed by DG Regio

    Statements

    0 references
    977,921.54 zloty
    0 references
    234,701.17 Euro
    13 January 2020
    0 references
    1,150,495.99 zloty
    0 references
    276,119.04 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    2 December 2015
    0 references
    22 June 2018
    0 references
    GMINA BRZOZÓW
    0 references
    Celem bezpośrednim projektu jest poprawa jakości i efektywności kształcenia prowadzonego w placówkach edukacji szkolnej na ternie Gminy Brzozów. Cel ogólny projektu to łagodzenie wykluczenia społecznego spowodowane dysproporcjami w dostępie do wysokiej jakości usług edukacji szkolnej, w tym także dla osób z niepełnosprawnością oraz poprawa szans rozwojowych dzieci z obszaru Gminy Brzozów poprzez zwiększoną dostępność atrakcyjnej oferty edukacji szkolnej. Przedmiotem niniejszego projektu jest poprawa stanu szkolnictwa w Gminie Brzozów, poprzez przebudowę infrastruktury dydaktycznej w tym także obiektów służących wzmacnianiu sprawności fizycznej uczniów. Projekt swoim zakresem, obejmuje także zakup nowoczesnego sprzętu ICT oraz mat. dydaktycznych dla wszystkich placówek edukacji szkolnej w Gminie. Przebudową objęte zostaną budynki: Gimnazjum nr 1 oraz Szkoły Podstawowej Nr 1 w Brzozowie. Prace w budynku gimnazjum obejmują roboty budowlane i montażowe, dostosowując obiekt dla osób niepełnosprawnych oraz poprawiając warunki p.poż. W ramach prac wykonany zostanie min. montaż windy, dociepleniem stropu i ścian budynku w części strychu, wykonanie sanitariatów ( z dostosowaniem dla osób niepełnosprawnych), wykonanie daszków nad wejściem, przebudowa stolarki drzwiowej oraz roboty instalacyjne. W ramach prac na budynku SP nr 1 w Brzozowie - sala gimnastyczna, wykona się: wymianę nieszczelnego pokrycia dachowego; inst. elektryczną i oświetlenia na energooszczędne; prace termomodernizacyjne (wym. stolarki okiennej, docieplenie stropu ostatniej kondygnacji); prace poprawiające infrastrukturę do lekcji WF (min. podział areny sportowej, montaż piłkochwytów, przebudowa magazynu sprzętu WF). Zaplanowane prace na obiekcie zwiększają dostępność dla niepełnosprawnych. Przedmiotowy projekt obejmuje konieczne roboty budowlane, oraz doposażenie wszystkich placówek szkolnych na terenie Gminy Brzozów. (Polish)
    0 references
    The direct objective of the project is to improve the quality and effectiveness of education provided in school education institutions on the territory of the Brzozów commune. The general objective of the project is to alleviate social exclusion caused by imbalances in access to high-quality school education services, including for people with disabilities and improving the development opportunities of children from the Brzozów commune by increasing the availability of an attractive offer of school education. The subject of this project is to improve the state of education in the Brzozów Municipality, by rebuilding the teaching infrastructure, including facilities for strengthening pupils’ physical fitness. The project also includes the purchase of modern ICT and didactic mats for all school education institutions in the commune. The reconstruction will include the following buildings: Middle school No. 1 and Primary School No. 1 in Brzozów. Work in the middle school building includes construction and assembly works, adjusting the facility for disabled people and improving the conditions of fire. The works will include installation of the elevator, warming of the ceiling and walls of the building in the part of the attic, construction of sanitary facilities (with adaptation for disabled people), construction of roofs above the entrance, reconstruction of the door carpentry and installation works. As part of the work on the building SP No 1 in Brzozów – gym, the following will be performed: replacement of leaky roof covering; electrical and energy efficient lighting; thermal modernisation works (e.g. window joinery, warming of the ceiling of the last floor); works to improve the infrastructure for WF lessons (min. division of the sports arena, assembly of balls, reconstruction of WF equipment storage). The planned work on the facility increases accessibility for the disabled. This project includes the necessary construction work and the retrofitting of all school facilities in the Brzozów commune. (English)
    20 October 2020
    0 references

    Identifiers

    RPPK.06.04.03-18-0011/16
    0 references