No label defined (Q118618)

From EU Knowledge Graph
Revision as of 16:33, 20 October 2020 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in 1 language: remove_english_label)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
No label defined
Project in Poland financed by DG Regio

    Statements

    0 references
    470,676.12 zloty
    0 references
    112,962.27 Euro
    13 January 2020
    0 references
    553,736.62 zloty
    0 references
    132,896.79 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    26 March 2018
    0 references
    31 December 2019
    0 references
    SAMODZIELNY PUBLICZNY GMINNY ZAKŁAD OPIEKI ZDROWOTNEJ W RYMANOWIE
    0 references
    0 references
    Bezpośrednim celem realizacji projektu jest wzrost efektywności energetycznej budynku SPG ZOZ w Rymanowie.Projekt zakłada modernizację energetyczną budynku o powierzchni użytkowej 1841,77m2, w którym znajduje się Samodzielny Publiczny Gminny Zakład Opieki Zdrowotnej w Rymanowie. Jest to budynek wykonany w technologii tradycyjnej, murowanej. Chociaż został wybudowany stosunkowo niedawno (w roku 1989) ma szereg mankamentów wynikających ze stosowanych technologii budowlanych, sposobu eksploatacji i postępującego zużycia. Efektem tego jest niska efektywność energetyczna stąd konieczność realizacji projektu związanego z modernizacją energetyczną. Projekt stanowi element i jest spójny z celami PGN dla Gminy Rymanów na lata 2016-2020 roku w zakresie rozwoju efektywności energetycznej.Zakres projektu obejmuje:- docieplenie stropu zewnętrznego styropianem gr. 18cm;- wymianę części stolarki okiennej (10szt.), na PCV;- docieplenie ścian zewnętrznych styropianem gr. 15cm (podłużnych, szczytowych, piwnicy);- wymianę stolarki drzwiowej (2szt.) na drzwi stalowe ocieplane,- docieplenie ściany na gruncie;- modernizację systemu grzewczego (demontaż starych grzejników żeliwnych i rurowych stalowych, montaż nowych grzejników aluminiowych członowych wyposażonych w zawory termostatyczne i głowice termostatyczne, wymiana starych zaworów na nowe zawory termostatyczne wyposażone w głowice termostatyczne przy istniejących grzejnikach aluminiowych);- wykonanie robót towarzyszących: wykonanie obróbek blacharskich, demontaż i ponowny montaż instalacji odgromowej oraz rur spustowych, montaż parapetów zewnętrznych, wykonanie płytki odbojowej wokół budynku, montaż parapetów wewnętrznych.Zakres rzeczowy został określony na poziomie optymalnym, zapewniającym: - optymalne ograniczenie zużycia energii finalnej,- osiągnięcie optymalnego ograniczenia emisji CO2,- zgodność pod względem uwarunkowań technicznych i technologicznych, zgodności z normami i zasadami uniwersalnego projektowania. (Polish)
    0 references
    The direct objective of the project is to increase the energy efficiency of the SPG ZOZ building in Rymanów.The project assumes the energy modernisation of the building with a usable area of 1841.77 m², which houses the Independent Public Health Care Department in Rymanów. It is a building made in traditional brick technology. Although it was built relatively recently (in 1989), it has a number of flaws due to the construction technology used, the way in which it operates, and its consumption continues. This results in low energy efficiency, hence the need for a project related to energy modernisation. The project is an element and is consistent with the objectives of PGN for the commune of Rymanów for the years 2016-2020 in the field of energy efficiency development. The scope of the project includes:- warming of external ceilings with styrofoam gr. 18 cm;- replacement of parts of the window carpentry (10pcs), on PVC;- insulation of the external walls of the outer walls with polystyrofoam of 15 cm (longitudinal, peaks, cellars);- replacement of the door carpentry (2pcs.) on the walls of the interiors, the interiors of the interiors are equipped with a thermostyresing of the fir. 15 cm (longitudinal, peaks, cellars);- replacement of the door carpenter (2pc.) for the moderny of the construction of the steel-plants, and the construction of the interiors are equipped with a thermo-firing system (longitudinal, peaks, cellars);- replacement of the door carpentry (2pc.) on the interior of the walls, the interior of the outer walls and the construction of the foams are equipped with 15 cm (longitudinal, pines, and cellars);- replacement of the door carpentry (2pieces.) on the walls of the interiors of the interiors of the outer walls are equipped with foyrofosses of 15 cm (longitudinal, peaks, and cellars); the replacement of the door carpenter (2pc.s.) for the retrofitting of the external walls of the foyrofoaming system is equipped with 15 cm (longitudinal, peaks, cellars); the replacement of the door carpentry (2pcs.) for the interior of the interiors of the outer walls of the polystyres are equipped with 15 cm (longitudinal, peaks and cellars); the replacement of the door carpenter (2pc. of the walls) for the interior of the interiors of the outer walls and the interiors of the curtains are equipped with the thermo-firing of the new valves, and the replacement of the doors (2pcs.) for the steel-plant doors, and the interior of the interiors are equipped with the fission-firings of the new valves and the replacement of the doors (2pcs. of the walls) for the steel doors, and the interiors of the interior are equipped with the foam-firings. manufacturing of metalworking, dismantling and re-assembling of lightning protection systems and drain pipes, installation of exterior windowsills, construction of firing plates around the building, installation of internal window sills. — optimal reduction of final energy consumption,- achieving the optimal reduction of CO2 emissions- compliance in terms of technical and technological conditions, compliance with standards and principles of universal design. (English)
    20 October 2020
    0 references

    Identifiers

    RPPK.03.02.00-18-0002/18
    0 references