Construction of 1.98 MW, together with technical infrastructure, of a capacity of MW for the construction of photovoltaic PV (Q118605)

From EU Knowledge Graph
Revision as of 16:33, 20 October 2020 by DG Regio (talk | contribs) (‎Removed claim: summary (P836): The main objective of the project is to increase the production of energy from renewable sources and improve the air quality and the protection of fossil fuel resources as well as the reduction of CO2 emissions to the atmosphere. the project will result in two 0.99 MW solar PV installations with a total output of 1.98 MW. the project will produce 1 782.00 MWh of electricity and a CO2 emission reduction of 1470,15 tonnes CO2/rok will be produce...)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of 1.98 MW, together with technical infrastructure, of a capacity of MW for the construction of photovoltaic PV
Project in Poland financed by DG Regio

    Statements

    0 references
    4,742,994.46 zloty
    0 references
    1,138,318.67 Euro
    13 January 2020
    0 references
    5,928,743.09 zloty
    0 references
    1,422,898.34 Euro
    13 January 2020
    0 references
    80.0 percent
    0 references
    31 May 2017
    0 references
    27 February 2020
    0 references
    MARKO DZIKI WŁADYSŁAW
    0 references
    0 references
    Głównym celem projektu jest wzrost produkcji energii pochodzącej ze źródeł odnawialnych oraz poprawa jakości powietrza i ochrona zasobów paliw kopalnych a także redukcja emisji CO2 do atmosfery.W wyniku realizacji projektu zostaną wybudowane dwie instalacje ogniw fotowoltaicznych o mocy 0,99 MW każda.powstanie farma fotowoltaiczna o łącznej mocy 1,98 MW W wyniku realizacji projektu wyprodukowane zostanie 1782,00 MWh energii elektrycznej oraz zostanie osiagnięta redukcje emisji CO2 na poziomie 1470,15 ton CO2/rok (Polish)
    0 references

    Identifiers

    RPPK.03.01.00-18-0522/17
    0 references