Management of the Klimek reservoir (Q112961)

From EU Knowledge Graph
Revision as of 14:34, 20 October 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): As part of the project, 2 main investment activities will be carried out, i.e.:The management of the coast of Klimkówka Lake, which assumes: about regulation and profiling of the shore by length. 350mb with a 3-degree wharf with a safety and recreational asphalt pavement function long. 350mb 4 connectors between the wharf and the path in the form of a pavement with concrete cube 15 beaches of compact reinforced concrete stairs, finished with a c...)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Management of the Klimek reservoir
Project in Poland financed by DG Regio

    Statements

    0 references
    3,231,755.02 zloty
    0 references
    775,621.20 Euro
    13 January 2020
    0 references
    4,787,785.21 zloty
    0 references
    1,149,068.45 Euro
    13 January 2020
    0 references
    67.5 percent
    0 references
    8 January 2018
    0 references
    30 September 2020
    0 references
    GMINA ROPA
    0 references
    0 references
    W ramach projektu zostaną przeprowadzone 2 główne działania inwestycyjne, tj.:Zagospodarowanie wybrzeża Jeziora Klimkówka, zakładające:o regulację i profilowanie brzegu o dł. 350mb wraz wykonaniem 3 stopniowego nabrzeża o funkcji zabezpieczającej i wypoczynkowej ścieżki rowerowej o nawierzchni asfaltowej dł. 350mb 4 łączników między nabrzeżem a ścieżką w formie chodnika z kostki betonowej 15 plaż kompaktowych żelbetowych schodów zejściowych, wykończonych deską kompozytową 4 pływających pomostów pomostu cumowniczego budowę miejsca do wodowania łodzi wraz z drogą dojazdową i z chodnikiem aranżację terenu, obejmującą plaże piaszczyste i zieleń urządzoną natryski zewnętrzne szt. 4 x 2 wraz z instalacją wodociągową oraz instalacją kanalizacji sanitarnej elementy oświetlenia, słupki kablowe wraz z instalacją elektroenergetyczną O budowę obiektu rekreacyjnego drewnianej wiaty z grillem, wraz z zapleczem sanitarnym toalety, przebieralnie o pow. zabudowy 91,23m2, umożliwiającym komfortowe korzystanie z terenu na zasadzie ogólnodostępności, również dla osób niepełnosprawnych, przy czym mowa tu głównie o okresie wiosennoletnim, kiedy ruch turystyczny jest największy. Ze względów oszczędnościowych zrezygnowano natomiast z lokalizowania innych obiektów budowlanych. Pow. uży. wiaty 48,18m2, pow. uży. zaplecza sanitarnego 20,42m2Stworzenie sieci tras wielofunkcyjnych, mogących pełnić funkcję tras rowerowych w sezonie od wiosny do jesieni oraz tras biegowych w zimie. Projekt zakłada wykonanie całorocznych tras w miejscowościach Brunary1353m, Czarna915m, Hańczowa110m, Kwiatoń855m, Smerekowiec1012m o szerokości 2m. Trasy powstaną wzdłuż dróg powiatowych, co z jednej strony obniży koszty działania, a z drugiej zapewni do nich lepszy dostęp, od jezdni oddzielone zostaną słupkami blokującymi U 12c. Ciąg dalszy w punkcie Q (Polish)
    0 references
    As part of the project, 2 main investment activities will be carried out, i.e.:The management of the coast of Klimkówka Lake, which assumes: about regulation and profiling of the shore by length. 350mb with a 3-degree wharf with a safety and recreational asphalt pavement function long. 350mb 4 connectors between the wharf and the path in the form of a pavement with concrete cube 15 beaches of compact reinforced concrete stairs, finished with a composite board of 4 floating bridges of the mooring bridge construction of a launching site with access road and pavement arrangement, including sandy beaches and greenery decorated outdoor showers. 4 x 2 with water supply system and sanitary sewage system lighting elements, cable poles with power installation About the construction of a recreational facility of a wooden shelter with a grill, together with sanitary facilities, toilets, changing rooms with an area of 91.23 m², allowing comfortable use of the area on the principle of public access, also for people with disabilities, but mainly the spring season, when tourist traffic is the largest. For savings reasons, however, other construction works were abandoned. 48.18 m², area of sanitary facilities 20.42m2Creation of multifunctional routes, which can serve as cycling routes during the season from spring to autumn and cross-country trails in winter. The project involves making year-round trails in Brunary1353m, Czarna915m, Hańczowa110m, Kwiatoń855m, Smerekowiec1012 m wide, 2 m wide. The routes will be built along district roads, which on the one hand will reduce operating costs and on the other will provide better access, from the roadways will be separated by blocking posts U 12c. Continue under point Q (English)
    20 October 2020
    0 references

    Identifiers

    RPMP.06.03.03-12-0329/17
    0 references