Revision as of 12:18, 20 October 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The area of the SAG III project is part of zone Mon. Economic Activity Zone (description in C.1.1). The subject of the project is the development of the northern part of the SAG, being the next stage to arm the existing SAG (in the perspective of 2007-13 stages I and II were completed – description in C.1.3). SAG is one of several areas of gosp. in GS – already functioning: Skawiński Economic Area and Economic Area HUTA. In addition, in S. there...)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Development of the EAZ — Stage III
Project in Poland financed by DG Regio

    Statements

    0 references
    1,883,173.24 zloty
    0 references
    451,961.58 Euro
    13 January 2020
    0 references
    2,215,497.99 zloty
    0 references
    531,719.52 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    28 October 2014
    0 references
    30 September 2019
    0 references
    GMINA SKAWINA
    0 references
    0 references
    Obszar projektu SAG III wchodzi w skład strefy pn. Strefa Aktywności Gospodarczej (opis w C.1.1). Przedmiotem projektu jest rozwój płn.-zach. części SAG, będąc kolejnym etapem dozbrajającym istniejącą SAG (w perspektywie 2007-13 zrealizowano etapy I i II – opis w C.1.3). SAG jest jednym z kilku obszarów gosp. w GS – funkcjonują już: Skawiński Obszar Gospodarczy i obszar gospodarczy HUTA. Ponadto, w S. funkcjonują podobszary Krakowskiej Specjalnej Strefy Ekonomicznej. Obszary stref gosp. są zlokal. w różnych miejscach i nie wpływają na swoje funkcjonowanie. Podobszary SSE ograniczają się do działek konkretnych przedsiębiorstw korzystających z tego typu wsparcia. Strefy i SSE działają niezależnie, mimo iż w kilku obszarach pokrywają się lokalizacyjnie. Zakłada się działania inwestycyjne (wodociąg, kanalizacja sanitarna) wraz z działaniami pomocniczymi koniecznymi do ich zrealizowania, które umożliwią przyciągnięcie nowych przedsiębiorców z sektora MŚP oraz stworzenie możliwości rozwojowych firmom obecnie rezydującym w SAG. Projekt obejmuje następujące zadania: - Budowa sieci wodociągowej w rejonie ul. Łąkowej – etap II. Zakres inwestycji obejmuje budowę sieci wod. PEO160 o dł. ok. 782 mb. Projektowana sieć połączy istniejące odcinki sieci wodociągowej zlokalizowane przy ul. Podgórki i ul. Hałacińskiego. - Budowa sieci kanalizacyjnej oraz pompowni sieciowej w rejonie ul. Łąkowej. Planowana sieć kan. ma zostać wykonana wzdłuż płn.-zach. granicy SAG i obsługiwać płn.-zach. część SAG w tego typu infrastrukturę. Projekt sieci obejmuje kanalizację sanitarną PCV O250 (długość ok. 1031 m) oraz rurociąg tłoczny PE O110 (długość ok. 509 m) wraz z pompownią sieciową P1 i zbiornikiem retencyjnym. Wymienione rozwiązania jednoznacznie odpowiadają na potrzeby i problemy zdiagnozowane w części C.1. W celu zrealizowania pełnego zakresu inwestycji niezbędne jest: - sprawowanie nadzorów inwestorskich i autorskich nad zadaniami, - promocja projektu. Więcej informacji w części C.1.2 i Q. (Polish)
    0 references
    The area of the SAG III project is part of zone Mon. Economic Activity Zone (description in C.1.1). The subject of the project is the development of the northern part of the SAG, being the next stage to arm the existing SAG (in the perspective of 2007-13 stages I and II were completed – description in C.1.3). SAG is one of several areas of gosp. in GS – already functioning: Skawiński Economic Area and Economic Area HUTA. In addition, in S. there are sub-areas of the Kraków Special Economic Zone. The areas of the gosp. zones are localised in different places and do not affect their functioning. The SEZ sub-areas are limited to the parcels of specific enterprises benefiting from this type of support. Zones and SEZs operate independently, although in several areas they overlap locally. Investment activities (water supply, sanitary sewerage) are planned, together with support measures necessary to implement them, which will enable new entrepreneurs from the SME sector to attract and develop opportunities for companies currently residing in SAG. The project shall include the following tasks: — Construction of a water supply network in the area of ul. Meadow – Stage II. The scope of the investment includes the construction of a water network. PEO160 approx. It’s 782 mb. The planned network will connect existing sections of the water supply network located at ul. Podgórki and St. It’s Hałaciński. — Construction of sewage network and pumping plant in the area of ul. It’s a meadow. The planned network of can. is to be made along the north-west of the SAG border and to operate the north-west part of the SAG in this type of infrastructure. The network design includes sanitary sewage system O250 PCV (lenght approx. 1031 m) and PE O110 pressing pipeline (length approx. 509 m) together with the P1 pumping station and the retention tank. These solutions clearly respond to the needs and problems diagnosed in section C.1. In order to realise the full range of investments, it is necessary to: — carrying out investor and copyright supervision over tasks, – promotion of the project. For more information, see sections C.1.2 and Q. (English)
    20 October 2020
    0 references

    Identifiers

    RPMP.03.01.01-12-0599/16