Comprehensive preparation of investment areas of the Economic Activity Zone – Nowa Huta of the Future_2 (Q111678)

From EU Knowledge Graph
Revision as of 12:18, 20 October 2020 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in 1 language: translated_label)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Comprehensive preparation of investment areas of the Economic Activity Zone – Nowa Huta of the Future_2
Project in Poland financed by DG Regio

    Statements

    0 references
    58,892,560.64 zloty
    0 references
    14,134,214.55 Euro
    13 January 2020
    0 references
    69,285,365.55 zloty
    0 references
    16,628,487.73 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 October 2017
    0 references
    31 December 2021
    0 references
    KRAKÓW NOWA HUTA PRZYSZŁOŚCI SPÓŁKA AKCYJNA
    0 references
    0 references
    Przedmiotem projektu jest budowa infrastruktury drogowej oraz sieciowej na potrzeby funkcjonowania Strefy Aktywności Gospodarczej.Powierzchnia całkowita SAG 39,298 ha.Teren, podzielony jest na trzy niezależne podobszary:Podobszar Igołomska Północ, Podobszar Igołomska Południe, Podobszar Igołomska Zachód.W ramach projektu zostanie zrealizowany następujący zakres rzeczowy:1. Uporządkowanie istniejącej zieleni niezbędna wycinka drzew, karczowanie, trzebież2. Likwidacja kolidujących obiektów i infrastruktury:3. Doprowadzenie infrastruktury technicznej do granic wyznaczonego SAG 4. Budowa infrastruktury drogowej i komunikacji wewnętrznej SAG drogi, chodniki wraz z oświetleniem, w tym: drogi wewnętrzne SAG o pow. 27 912,4 m2 jezdni, kanalizacja deszczowa odwodnienie dróg o dł. 5,8 km; sieci wodociągowe o dł. 6,89 km, sieci kanalizacyjne o dł. 4,7 km, 4 przepompownie ścieków, oświetlenie drogowe o dł. 5,59 km, kanał technologiczny dla linii telekomunikacyjnych5. Zagospodarowanie terenu mała architektura, trawniki, nasadzeniaTym samym strefa będzie kompletnie wyposażonym SAG.Dla znacznej części obszaru planowanego do objęcia SAG obowiązuje aktualny Miejscowy Plan Zagospodarowania Przestrzennego. Ponadto sporządzany jest nowy MPZP. W zakresie nieobjętym aktualnym MPZP projekt jest zgodny z zapisami dokumentu równoważnego tj. Studium uwarunkowań i kierunków zagospodarowania przestrzennego Miasta Kraków. Projekt spełnia więc kryterium: zgodność z planem zagospodarowanie przestrzennego lub innym dokumentem równoważnym.Na obszarze Gminy Kraków funkcjonuje Specjalna Strefa Ekonomiczna. Jej obszar jest w pełni wykorzystany przez inwestorów, tak więc projekt spełnia kryterium wyczerpania limitu pow. inwestycyjnej.Dodatkowe informacje w cz.Q (Polish)
    0 references
    The subject of the project is the construction of road and network infrastructure for the functioning of the Economic Activity Zone.The total area of SAG 39.298 ha.The area is divided into three independent sub-areas: Igołomska North Subarea, Igołomsk Sub-area South, Igołomsk Subarea West.The following material scope will be implemented within the project:1. Ordering the existing greenery necessary for woodcutting, grubbing-up, debris2. Decommissioning of conflicting facilities and infrastructure:3. Bringing the technical infrastructure to the boundaries of the designated SAG 4. Construction of road infrastructure and internal communication of SAG roads, sidewalks with lighting, including: internal roads SAG o pow. 27912.4 m² of roadways, drainage of rainy roads long. 5,8 km; water supply networks long. 6.89 km, sewerage networks long. 4.7 km, 4 sewage pumping stations, road lighting length. 5.59 km, technological channel for telecommunication lines5. Land development small architecture, lawns and plantingThe same zone will be fully equipped SAG.For a significant part of the area planned to include SAG, the current Local Spatial Plan applies. In addition, a new MPZP is being prepared. To the extent not covered by the current MPZP, the project complies with the provisions of the equivalent document, i.e. A study of the conditions and directions of spatial development of the City of Kraków. The project therefore satisfies the criterion: compliance with the spatial planning plan or other equivalent document.The Special Economic Zone operates in the Municipality of Kraków. Its area is fully utilised by investors, so the project fulfils the criterion of exhaustion of the limit of investment area.Additional information in part Q (English)
    20 October 2020
    0 references

    Identifiers

    RPMP.03.01.01-12-0476/17
    0 references