Thermal modernisation of educational and administrative buildings of the Brzeski District_2 (Q112226)

From EU Knowledge Graph
Revision as of 11:22, 20 October 2020 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in 1 language: translated_label)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Thermal modernisation of educational and administrative buildings of the Brzeski District_2
Project in Poland financed by DG Regio

    Statements

    0 references
    1,938,174.37 zloty
    0 references
    465,161.85 Euro
    13 January 2020
    0 references
    3,230,290.62 zloty
    0 references
    775,269.75 Euro
    13 January 2020
    0 references
    60.0 percent
    0 references
    11 January 2016
    0 references
    31 December 2018
    0 references
    POWIAT BRZESKI
    0 references
    0 references
    Projekt jest w pełni zgodny z przeprowadzonymi audytami energetycznymi dla obu budynków. Budynek administracyjny Starostwa Powiatowego przy Piastowskiej 2B: 1. Wymiana instalacji z rur stalowych oraz wymiana grzejników żeliwnych na płytowe, zastosowanie termostatów, zaworów podpionowych i liczników ciepła; 2. Istniejąca instalacja centralna z kotłowni gazowej + sprężarkowa pompa ciepła, 3. Instalacja klimatyzacji w systemie VRF; 4. Docieplenie ścian zewnętrznych; 5. Docieplenie ściany zewnętrznej przy gruncie; 6. Docieplenie stropu zewnętrznego i stropu nad nieogrzewanym poddaszem; 7. Wymiana starych okien zewnętrznych oraz starych drzwi zewnętrznych 8. Wymiana oświetlenia na LED 9. Instalacja fotowoltaiczna. Budynek MOS: 1. Wymiana pozostałej części instalacji z rur stalowych na rurociągi miedziane oraz wymianę grzejników żeliwnych na nowe płytowe a także wbudowanie istniejących grzejników płytowych po wykonaniu nowej instalacji wraz z zaworami termostatycznymi, montaż licznika ciepła. 2. Istniejąca instalacja centralna z kotłowni gazowej + jako priorytet sprężarkowa pompa ciepła powietrze woda o mocy 20 kW; 3. Wykonanie instalacji klimatyzacji w systemie VRF; 4. Docieplenie ścian zewnętrznych; 5. Docieplenie ściany zewnętrznej przy gruncie; 6. Docieplenie dachów płaskich wełną mineralną oraz strop zewnętrzny styropianem 7. Wymiana starych drzwi zewnętrznych. 8. Wymiana oświetlenia na LED 9. Instalacja fotowoltaiczna - w systemie on-grid wykorzystywaną na potrzeby własne. Projekt cechują następujące wskaźniki: 1. % wartość poprawy efektywności energetycznej: 78,33%; 2. W projekcie zostały zastosowane liczniki ciepła; 3. Audyt energetyczny budynku wskazuje na konieczność wprowadzenia urządzeń utrzymujących zadaną temp. poprzez aktywne działanie (termostaty) i/lub regulatory różnicy ciśnień (zawory podpionowe). W projekcie zostały zastosowane ww. urządzenia. 4. % wartość redukcji emisji CO2: 78,33%; 5. % wartość obniżenia emisji pyłów (PM 10 i PM 2,5): 78,31%. (Polish)
    0 references
    The project is fully compatible with the conducted energy audits for both buildings. Administrative building of the District Starostwo at Piastowska 2B: 1. Replacement of installation from steel pipes and replacement of cast iron radiators for plates, use of thermostats, upholstery valves and heat meters; 2. Existing central installation from the gas boiler room + compressor heat pump, 3. Installation of air conditioning in the VRF system; 4. Warming of the outer walls; 5. Warming of the outer wall at the ground; 6. Warming of the outer ceiling and the ceiling above the unheated attic; 7. Replacement of old external windows and old external doors 8. Switching lighting to LED 9. Photovoltaic installation. The MOS building: 1. Replacement of the remaining parts of the installation from steel pipes to copper pipes and replacement of cast iron radiators for new plates as well as the incorporation of existing plate radiators after a new installation with thermostatic valves, installation of heat meters. 2. Existing central installation from the gas boiler room + as a priority compressor heat pump air water with a power of 20 kW; 3. Installation of air conditioning systems in the VRF system; 4. Warming of the outer walls; 5. Warming of the outer wall at the ground; 6. Warming of flat roofs with mineral wool and external ceiling styrofoam 7. Replacing the old external door. 8. Switching lighting to LED 9. Photovoltaic installation – in an on-grid system used for own needs. The project shall be characterised by the following indicators: 1. % Energy Efficiency Improvement Value: 78,33 %; 2. Heat meters are used in the project; 3. The energy audit of the building indicates the necessity of introducing devices that maintain the specified tempo through active operation (thermostates) and/or regulators of pressure difference (sub-vertical valves). The above-mentioned devices were used in the project. 4. % CO2 reduction: 78,33 %; 5. % particulate emission reduction (PM 10 and PM 2,5): IT’S 78.31 %. (English)
    20 October 2020
    0 references

    Identifiers

    RPMP.04.03.02-12-0198/16
    0 references