Implementation of thermal modernisation works and the use of renewable energy sources in F.U.H. Rolbud buildings_2 (Q112140)

From EU Knowledge Graph
Revision as of 10:55, 20 October 2020 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in 1 language: translated_label)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Implementation of thermal modernisation works and the use of renewable energy sources in F.U.H. Rolbud buildings_2
Project in Poland financed by DG Regio

    Statements

    0 references
    362,845.65 zloty
    0 references
    87,082.96 Euro
    13 January 2020
    0 references
    530,318.57 zloty
    0 references
    127,276.46 Euro
    13 January 2020
    0 references
    68.42 percent
    0 references
    17 July 2019
    0 references
    17 July 2021
    0 references
    FIRMA USŁUGOWO-HANDLOWA "ROLBUD" SPÓŁKA JAWNA ZOFIA I WŁADYSŁAW SYCHOWSCY
    0 references
    0 references
    Projekt jest częścią zintegrowanego regionalnego przedsięwzięcia dotyczącego ograniczenia niskiej emisji oraz wykorzystania odnawialnych źródeł energii. Przedmiotem projektu jest termomodernizacja dwóch budynków należących do Wnioskodawcy mająca na celu obniżenia zużycia ciepła i zanieczyszczenia powietrza. Na podstawie wykonanego audytu energetycznego budynków biurowomagazynowego, handlowego wymagane jest przeprowadzenie termomodernizacji w celu wyżej wspomnianego zmniejszenia zapotrzebowania na energię. Na podstawie dokonanej oceny wynikającej z przeprowadzonego audytu energetycznego optymalnym wariantemprzedsięwzięcia termomodernizacyjnego w powyżej opisanych budynkach jest Wariant I polegający na:Budynek sali sprzedeżowej: 1. Ocieplenie podłogi na gruncie w piwnicy2. Ocieplenie podłogi na gruncie na parterze3. Ocieplenie ścian zewnętrznych parteru4. Ocieplenie stropodachu5. Wymiana okien 6. Wymiana drzwi zewnętrznych 7. Wymiana istniejącego źródła ciepła na kocioł o wyższej sprawności zasilany gazem ziemnym Budynek magazynowy:1. Ocieplenie podłogi na gruncie 2. Ocieplenie ścian zewnętrznych 3. Ocieplenie dachu4. Wymiana okien 5. Wymiana drzwi zewnętrznych 6. Wymiana bram przemysłowych 7. Wymiana istniejącego źródła ciepła na gruntową pompę ciepła 8. Montaż instalacji fotowoltaicznej szczegółowy opis w punkcie F. Zakres rzeczowy projektuWnioskodawca posiada pełną gotowość do realizacji operacji tj. posiada dokumenty formalnoprawne nie wnoszącezastrzeżeń do realizacji programu zgodnie z niniejszymi zadaniami. Wnioskodawca posiada prawa własnościowe dobudynku w której zostanie zrealizowana operacja. Na podstawie wykonanego audytu stwierdzono iż poddanietermomodernizacji dwóch budynków jest konieczne i zasadne w celu zwiększenia efektywności energetycznej dopoziomu : . Natomiast emisja CO2 nowej instalacji w odniesieniu do stanu z istniejącej instalacji spadnie o (Polish)
    0 references
    The project is part of an integrated regional project to reduce low emissions and the use of renewable energy sources. The object of the project is the modernisation of two buildings belonging to the Applicant with the aim of reducing the consumption of heat and air pollution. On the basis of an energy audit of the office warehouse buildings, a thermomodernisation is required in order to reduce the energy demand mentioned above. On the basis of the assessment resulting from the energy audit carried out, the optimal option of thermomodernisation in the buildings described above is Option I, which consists of: 1. Warming the floor on the ground in the basement2. Floor warming on ground floor3. Warming of the outer walls of the ground floor4. Warming of the ceiling5. Window replacement 6. Replacement of external doors 7. Replacement of existing heat source for higher efficiency boiler powered by natural gas Warehouse building:1. Floor warming on ground 2. Warming of the outer walls 3. Roof warming4. Window replacement 5. Replacement of external doors 6. Replacement of industrial gates 7. Replacement of existing heat source for ground heat pump 8. Installation of a photovoltaic installation detailed description in point F. Physical scope of the projectThe applicant has full readiness to carry out the operation, i.e. has formal legal documents that do not object to the implementation of the programme in accordance with these tasks. The applicant holds ownership of the building in which the operation will be carried out. On the basis of the audit, it was found that the thermal modernisation of two buildings was necessary and justified in order to increase energy efficiency to the level of: .. On the other hand, the CO2 emissions of the new installation in relation to the status of an existing installation will fall by (English)
    20 October 2020
    0 references

    Identifiers

    RPMP.04.02.00-12-0326/18
    0 references