“Construction of a separate collection point for municipal waste in Zatory”_2 (Q109271)

From EU Knowledge Graph
Revision as of 09:52, 20 October 2020 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in 1 language: translated_label)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
“Construction of a separate collection point for municipal waste in Zatory”_2
Project in Poland financed by DG Regio

    Statements

    0 references
    384,153.6 zloty
    0 references
    92,196.86 Euro
    13 January 2020
    0 references
    480,192.0 zloty
    0 references
    115,246.08 Euro
    13 January 2020
    0 references
    80.0 percent
    0 references
    3 July 2017
    0 references
    30 June 2020
    0 references
    GMINA ZATORY
    0 references
    0 references

    52°36'22.3"N, 21°11'2.0"E
    0 references
    Projekt dotyczy budowy Punktu Selektywnej Zbiórki Odpadów Komunalnych (PSZOK) w miejscowości Zatory. Przedsięwzięcie obejmuje projekt, roboty budowlane, nadzór, zakup wyposażenia PSZOK, a także działania promocyjne związane z projektem. W PSZOK zbieranych będzie 16 frakcji odp. (zgodnych z Katalogiem odpadów - zał. do Regulaminu konkursu): papier, tworzywa sztuczne, szkło, opakowania wielomateriałowe, zmieszane odp. opakowaniowe, przeterminowane leki, chemikalia oraz zanieczyszczone opakowania, zużyte baterie i akumulatory, zużyty sprzęt elektr. i elektron., meble i inne odp. wielkogabarytowe, odp. budowlane i rozbiórkowe, zużyte opony, odp. zielone, odzież i tekstylia inne niż biodegradowalne, popioły, inne odp. nie wymienione wyżej. W PSZOK będzie funkcjonował punkt napraw oraz punkt przyjmowania rzeczy używanych niestanowiących odpadów, celem ponownego użycia. Planowana jest też promocyjna akcja edukacyjna dotycząca selektywnej zbiórki odpadów. Projekt obejmuje 100% mieszkańców gm. Zatory. Zostanie utworzone jedno miejsce pracy. PSZOK otwarty będzie min. 8 godz., 5 dni w tygodniu, w tym sobota, min. do godz. 19:00. W ramach projektu przewiduje się: wykonanie prac związanych z zagospodarowaniem terenu (utwardzenie, organizacja spływu wody, nasadzenia zieleni, wiata pod kontenery otwarte), zakup i ustawienie pojemników i kontenerów na odp., oświetlenie terenu, ogrodzenie, oznakowanie poziome placu, tablice informacyjne i edukacyjne. Dzięki realizacji projektu poprawie ulegnie system gospodarki odpadami w gminie. Planowana inwestycja została wpisana do Planu inwestycyjnego dla województwa mazowieckiego w ramach Planu gospodarki odpadami dla województwa mazowieckiego 2022 i będzie w zachodnim regionie gospodarki odpadami komunalnymi, w którym obecnie nie uwzględniono komponentu dotyczącego termicznego przekształcenia odpadów oraz odzyskiwania energii. (Polish)
    0 references
    The project concerns the construction of the Municipal Waste Collection Point (PSZOK) in Zatory. The project includes a project, construction works, supervision, purchase of PSZOK equipment, as well as promotional activities related to the project. In PSZOK 16 fractions will be collected. (according to the Waste Catalogue – Annex to the Rules of Procedure of the contest): paper, plastics, glass, multimaterial packaging, mixed packaging, expired drugs, chemicals and contaminated packaging, used batteries and accumulators, used electrical and electron equipment, furniture and other large-size repetitions, construction and demolition, used tyres, green, clothing and textiles other than biodegradable, non-biodegradable The PSZOK will have a repair point and a reception point for non-waste items for reuse. A promotional educational action is also planned for selective collection of waste. The project covers 100 % of the population. A single workplace will be created. PSZOK will be open at least 8 hours, 5 days a week, including Saturday, min. until hours. 19:00 A.M. The project envisages: execution of works related to land management (heavy, organisation of water flow, planting of greenery, shelters for open containers), purchase and installation of containers and containers for protection, land lighting, fence, horizontal marking of the square, information and educational boards. The project will improve the waste management system in the commune. The planned investment was included in the Investment Plan for Mazowieckie voivodship as part of the Waste Management Plan for Mazowieckie voivodship 2022 and will be in the western region of municipal waste management, which currently does not take into account the component concerning thermal waste conversion and energy recovery. (English)
    20 October 2020
    0 references

    Identifiers

    RPMA.05.02.00-14-8804/17
    0 references