Reduction of emissions of air pollutants through replacement of heating equipment in the City and Municipality of Drobin_2 (Q109129)

From EU Knowledge Graph
Revision as of 09:20, 20 October 2020 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in 1 language: translated_label)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Reduction of emissions of air pollutants through replacement of heating equipment in the City and Municipality of Drobin_2
Project in Poland financed by DG Regio

    Statements

    0 references
    0 references
    1,075,259.92 zloty
    0 references
    258,062.38 Euro
    13 January 2020
    0 references
    1,344,074.91 zloty
    0 references
    322,577.98 Euro
    13 January 2020
    0 references
    80.0 percent
    0 references
    15 June 2018
    0 references
    31 December 2020
    0 references
    MIASTO I GMINA DROBIN
    0 references
    0 references

    52°44'16.1"N, 19°59'21.5"E
    0 references
    Założeniem i głównym celem projektu jest likwidacja emisji powierzchniowej (tzw. niskiej emisji), pochodzącej z indywidualnych palenisk domowych i osiedlowej kotłowni (zasilającej system ogrzewania 7 budynków) o 344,46 ton równoważnika CO2/rocznie i 3,1 ton PM10/rocznie oraz zwiększenie efektywności energetycznej 3 budynków wielorodzinnych dla poprawy stanu środowiska w Mieście i Gminie Drobin. Cel projektu zostanie osiągnięty przez wymianę 18 piecy (12 gazowych, 5 na biomasę-pellet, 1 na zgazowanie drewna) oraz termomodernizację 3 budynków. Zmianie sposobu ogrzewania ulegnie 9530,74 m2. Realizacja inwestycji jest zgodna z Planem Gospodarki Niskoemisyjnej dla Gminy Drobin, gdyż realizuje jego cel: redukcja emisji CO2 o 6,15% do 2020 roku (o 2 965,87 Mg CO2). Miasto i Gmina Drobin zaliczona jest do obszarów przekroczeń stężenia pyłu zawieszonego PM10 o okresie uśredniania 24 – godziny w 2015 roku w strefie mazowieckiej. Obszar ten określony jest w Programie Ochrony Powietrza dla strefy mazowieckiej, w której zostały przekroczone poziomy dopuszczalne pyłów PM10 i PM2,5. Projekt uwzględnia odnawialne źródła energii (biomasa) dla produkcji energii cieplnej -6 urządzeń/kotłów, które zapewnią zdolność wytwarzania energii cieplnej w wysokości 0,56 MW. Projekt skierowany do mieszkańców Gminy, realizowany jest na obszarze, na którym uchwalony i wdrażany jest program wsparcia dla najuboższych osób, które w wyniku realizacji projektu będą ponosić zwiększone koszty grzewcze lokalu związane z trwałą zmianą sytemu ogrzewania. W ramach projektu ponoszone będą także koszty inspektora nadzoru oraz promocji projektu. Projekt realizowany będzie w formule "zaprojektuj i wybuduj". Efektywność kosztowa: 27,53 euro/m2. Koszt przygotowania audytów ex-post zostanie poniesiony w IV kw. 2020. Na potrzeby realizacji inwestycji opracowano dokumentację techniczną – PFU, świadectwa charakterystyki energetycznej i audyty energetyczne oraz szacunek kosztów a także studium wykonalności. (Polish)
    0 references
    The project’s main objective and aim is to eliminate surface emissions (so-called low emissions) from individual domestic and residential boilerhouses (consuming heating system 7 buildings) by 344.46 tonnes CO2/year and 3.1 tonnes PM10 per year and increase the energy efficiency of 3 multi-family buildings to improve the environment in the City and the Drobin Commune. The project’s objective will be achieved by replacing 18 kilns (12 gas, 5 for biomass-pellet, 1 for wood gasification) and by thermal modernisation of 3 buildings. The heating method will change 9530.74 m². The realisation of the investment is in line with the Low-Emission Economy Plan for the Municipality of Drobin, as it fulfils its objective: reduction of CO2 emissions by 6.15 % by 2020 (by 2 965.87 Mg CO2). The city and the Municipality of Drobin are counted as areas of excess concentration of PM10 particulate matter with an average of 24 hours in 2015 in the Mazowieckie zone. This area is defined in the Air Protection Programme for the Mazowieckie zone, in which the limit values for PM10 and PM2.5 are exceeded. The project includes renewable energy sources (biomass) for the production of heat -6 equipment/boils, which will provide a thermal capacity of 0.56 MW. The project addressed to the residents of the municipality is implemented in an area where a support programme for the poorest people is adopted and implemented, which as a result of the project will bear the increased heating costs of the premises related to the permanent change of the heating system. The project will also bear the costs of the supervisor and the promotion of the project. The project will be implemented in the “design and build” formula. Cost-effectiveness: EUR 27,53/m². The cost of preparing ex-post audits will be incurred in the fourth quarter. 2020. Technical documentation – PFU, energy performance certificates and energy audits as well as cost estimates as well as feasibility studies were prepared for the implementation of the investment. (English)
    20 October 2020
    0 references

    Identifiers

    RPMA.04.03.01-14-B354/18
    0 references