COMPREHENSIVE TERMOMDERISATION OF PUBLIC UTILITY BUILDINGS IN RADZYŃ COUNTY_2 (Q105316)

From EU Knowledge Graph
Revision as of 08:57, 20 October 2020 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in 1 language: translated_label)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
COMPREHENSIVE TERMOMDERISATION OF PUBLIC UTILITY BUILDINGS IN RADZYŃ COUNTY_2
Project in Poland financed by DG Regio

    Statements

    0 references
    2,522,438.58 zloty
    0 references
    605,385.26 Euro
    13 January 2020
    0 references
    2,967,574.82 zloty
    0 references
    712,217.96 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    9 March 2016
    0 references
    15 December 2021
    0 references
    POWIAT RADZYŃSKI
    0 references
    Celem głównym projektu jest zwiększenie efektywności energetycznej budynków użyteczności publicznej na terenie p. radzyńskiego oraz ochrona i poprawa stanu środowiska naturalnego poprzez głęboką i kompleksową termomodernizację, wraz z wykorzystaniem odnawialnych źródeł energii opartą o system monitorowania i zarządzania energią. Cel ten zostanie zrealizowany poprzez realizację celów bezpośrednich projektu wynikających z analizy problemów i potrzeb beneficjentów tj.: 1. Efektywne wykorzystanie energii cieplnej 2. Obniżenie kosztów ogrzewania 3. Wykorzystanie energii pochodzącej z OZE 4. Poprawa warunków użytkowania obiektów użyteczności publicznej 5. Poprawa efekt. wykorzystania energii. Zadania: prace przyg., zarządzanie p., promocja p., wykonanie prac t.-moder. przy pl. Potockiego 1, ul. Gwardii 4, ul. Traugutta 6, ul. Sitkowskiego 1B poprzez: wymianę okien i drzwi, docieplenie ścian zewnętrznych, dachów i stropów, modernizacja instalacji ciepłej wody użytkowej, instalacji grzewczej c.o., wykonanie inst. klimatyzacji, moder. wentylacji, inst. elektrycznych/oświetlenia, montaż instalacji fotowoltaiki i kolektorów słonecznych, wykonanie systemów sterowania i zarządzania obiektami. Rezultaty: zgodnie z tabelą "sekcja: WSKAŹNIK KLUCZOWY". GR. DOC.: Powiat radzyński,mieszkańcy p. radzyńskiego. OPIS TECH.- EKONOM- wysokia jakość realizacji. Wysokie i kryteria jakościowe, dotyczące zastosowanych materiałów i wykonania robót. Termomodernizacja budynków i zastosowanie nowych technologii obniży koszty utrzymania. Projektowana inwestycja nie powoduje zagrożenia bezpieczeństwa ludzi i mienia, pogorszenia stanu środowiska i stanu zachowania zabytków, pogorszenia warunków zdrowotno-sanitarnych oraz uciążliwości dla terenów sąsiednich. Niniejsza analiza nie wykazała również przeszkód w realizacji inwestycji ze strony przepisów prawa ochrony środowiska. (Polish)
    0 references
    The main objective of the project is to increase the energy efficiency of public buildings in Radzyński and to protect and improve the environment through deep and comprehensive thermomodernisation, together with the use of renewable energy sources based on an energy monitoring and management system. This objective will be achieved through the achievement of the direct objectives of the project resulting from the analysis of the problems and needs of beneficiaries, i.e.: 1. Efficient use of thermal energy 2. Reduction of heating costs 3. The use of energy from RES 4. Improving the conditions of use of public utility facilities 5. Improving the effect. The use of energy. Tasks: work on the work, management p., promotion p., execution of works t.-moder. at pl. Potockiego 1, ul. Guard 4, str. Traugutta 6, str. Sitkowski 1B by: replacement of windows and doors, insulation of external walls, roofs and ceilings, modernisation of hot water installation, heating installation of central heating system, manufacture of air conditioning, moder. ventilation, electrical/lighting equipment, installation of photovoltaics and solar collectors systems, execution of control and management systems of objects. Results: according to the table 'Section: KEY INDICATOR’. MR DOC: Radzyński county, residents of Mr. Radzyński. Description TECH.- ECONOM – high quality of implementation. High and quality criteria, concerning the materials used and the execution of works. Thermal modernisation of buildings and the use of new technologies will reduce maintenance costs. The planned investment does not jeopardise the safety of people and property, deterioration of the state of the environment and conservation of monuments, deterioration of health and sanitary conditions and nuisance to neighbouring areas. This analysis also shows no obstacles to the implementation of investments by environmental law. (English)
    20 October 2020
    0 references

    Identifiers

    RPLU.05.02.00-06-0043/17
    0 references