No label defined (Q105309)

From EU Knowledge Graph
Revision as of 08:57, 20 October 2020 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in 1 language: remove_english_label)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
No label defined
Project in Poland financed by DG Regio

    Statements

    0 references
    1,008,224.04 zloty
    0 references
    241,973.77 Euro
    13 January 2020
    0 references
    1,186,145.96 zloty
    0 references
    284,675.03 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    2 January 2019
    0 references
    31 October 2022
    0 references
    GMINA KRASNOBRÓD
    0 references
    Zakres projektu obejmuje termomod. 2 bud. użyteczności publicznej (Budynek PES przy ul. Rynek 12 w Krasnobrodzie oraz Budynek ZS w Krasnobrodzie Segment A i B przy ul. Lelewela 37 w Krasnobrodzie.) w gminie Krasnobród. ZAKRES PROJEKTU: - ZS: Wymiana instalacji c.o. w segm. A i B, Wdrożenie systemu zarz. Energią., Docieplenie stropu poddasza, Dociepl. ścian, Docieplenie ścian piwnic, Dociepl. ścian w gruncie piwnic, Wymiana drzwi stalowych, Wymiana drzwi drewnianych, Roboty dodatkowe związane z termo budynku: Odtw. Instal. odgromowej (niekw.), Wykończenie opaski (koszt kwalifi. ze względu na podpiwniczenie obiektu), Instalacja fotowolt., odtworz. Inst. odgrom. Koszty kwalif - 857 927,00 zł netto - PES: Wymiana instalacji c.o. (grzejniki), Grzejnik w pomieszczeniu wod., Wyk. Instal. c.w., Wdroż. syst. zarządz. Energią, Dociepl. stropu poddasza, Dociepl. ścian, Dociepl. stropu piwnic, Wym. okien, Wym. drzwi, Wym. okien w piwnicach, Roboty dodatkowe związane z term. Bud., w tym: Rob. ziem. związane z dociepl. Fund., Izol. Przeciwwilg. oraz dociepl. ścian fundamentów i piwnic, Roboty murowe (dost kominów), Instal. oświetleniowa. Koszty niekwalif. nie obj. audytem energt. wraz dostawą schodołazu, w tym m.in..: Montaż kotła gaz., Instalacja gazowa, roboty murowe (dostos. kominów). Koszty kwalif - 241 878,96 zł netto CELE PROJEKTU to: - zwiększenie efektyw. energet. 2 budynków uż. publicznej w gm. Kr.; - popr. jakości środ. Przyrodn. poprzez wdroż. rozwiązań wpływ. na zmniejsz. emisji gazów ciepl. i łagodzenie skutków zmian klimatu; - zmniejsz. kosztów ekspl. budynków poddanych termomod.; - poprawa warunków nauki i pracy. Wskaźniki - Produktu: Liczba zmoder. Energet. budynków- 2; Pow. użytkowa bud. poddanych termomod. - 3 482,92 m2; Rezultatu: Ilość zaoszcz. En. ciepl. - 895,30 GJ/rok; Zmniejsz. rocznego zużycia en. pierwot. w bud. publ. (CI32) - 321 900,00 kWh/rok; Szac. roczny spadek emisji gazów c. (CI34) -76 t/rok. GRUPY DOCELOWE: mieszk. gm. Kr. (Polish)
    0 references
    The scope of the project includes thermomodes. 2 public utility building (PES building at ul. Marketplace 12 in Krasnobrod and ZS Building in Krasnobrod Segment A and B at ul. Lelewela 37 in Krasnobrod.) in the municipality of Krasnobród. SCOPE OF THE PROJECT: — ZS: Replacement of central heating installations in segm. A and B, Implementation of the system. Energy., Warming of the floor floor, Dociepl. walls, Warming of cellar walls, Dociepl. walls in the ground of cellars, Replacement of steel doors, Replacement of wooden doors, Additional works related to the thermo building: No, no, no. Instal. lightning discharge (ink.), Finishing the band (cost of qualifi. due to the cellaring of the object), Photovolt installation, recreate. Inst. the lightning strike. Eligible costs – PLN 857 927.00 net – PES: Replacement of central heating installations (heaters), Heat in the water room, Instal. c.w., Implementation. Energetic, Dociepl. stropu poddasza, Dociepl. murals, Dociepl. ceiling cellars, Wym. windows, Wym. door, Wym. windows in cellars, additional robots related to the term. Bud., of which: Rob. Lands related to warming. The Fund., Izol. Ociwwilg. and insulation. walls of foundations and cellars, Wallworks (dost chimneys), Instal. lighting. Non-equivalent costs do not include the energy audit together with the delivery of the staircase, including, among others: Installation of a gas boiler., Gas installation, masonry work (stopping chimneys). Eligible costs – PLN 241 878.96 net project objectives are: — increase the efficiency of energet. 2 public buildings in Gm. Kr.; — quality of Wednesday. Nature. through the implementation of solutions to impact. on reducing greenhouse gas emissions and mitigating the effects of climate change; — reduce the cost of exploding buildings subjected to thermometers; — improving the conditions of education and work. Indicators – Product: The number of zmoders. Energet. buildings- 2; Used buildings. subjected to thermomodes. — 3482,92 m²; Result: The amount of furrow. It’s warm. — 895,30 GJ/year; Reduce the annual consumption of en. priwot. in the publ. (CI32) – 321900,00 kWh/year; Estimated annual reduction in gas emissions c. (CI34) -76 t/year. TARGET GROUPS: inhabitant. gm. Kr. (English)
    20 October 2020
    0 references

    Identifiers

    RPLU.05.02.00-06-0040/19
    0 references