Comprehensive and deep thermal modernisation of the Bofa Building in m. Suchowola (Q105274)

From EU Knowledge Graph
Revision as of 08:56, 20 October 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Target P.: Improving the quality of Wednesday nature in the municipality of Wohyń affecting the quality of life of the local community and increasing the competitiveness of the area. C. detail. are: 1.Optimising activities Increasing efficiency of the energetic sector publ., 2. Mitigating climate change through the emission of pollutants into the atmosphere, 3. Increase the use of energy generated from RES. Target group: users of the ZSZ buildin...)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Comprehensive and deep thermal modernisation of the Bofa Building in m. Suchowola
Project in Poland financed by DG Regio

    Statements

    0 references
    799,265.05 zloty
    0 references
    191,823.61 Euro
    13 January 2020
    0 references
    940,311.84 zloty
    0 references
    225,674.84 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    8 January 2019
    0 references
    30 November 2021
    0 references
    GMINA WOHYŃ
    0 references
    0 references
    Głów. celem P.: Poprawa jakości środ. natur. na terenie Gminy Wohyń wpływająca na wzrost jakości życia społ. lokalnej oraz zwiększenie konkurencyjności obszaru. C. szczegół. są: 1.Zoptymalizowanie działań zwięk. efektywność energ. sektora publ., 2. Łagodzenie zmian klimatu poprzez ogran. emisji zanieczyszczeń do atmosfery, 3. Zwiększenie wykorzystania energii poch. z OZE. Grupa docel.: użytkownicy budynku ZSZ w Suchowoli (uczniowie i nauczyciele), pozostali mieszkańcy i podm. funkcjon. na terenie Gminy Wohyń. Pow. użytk. budynku ZSZ w Suchowoli 1441,96m2. Rezultatami proj. będą: Ilość zaoszczedz. energii cieplnej -1441,28GJ/rok; Ilość zaoszczędzonej energii elektr.-23,22MWh/rok, Zmniejszenie rocznego zużycia energii pierwotnej w bud. publ.(CI32) -699894,44kWh/rok; Szacowany roczny spadek emisji gazów ciepl.(CI34) - 227,83 t.r. CO2/rok; Prod. energii cieplnej z nowo wybud./nowych mocy wytwór. instalacji wykorzyst. OZE -212,71MWht/rok; Prod. energii elekt.z nowo wybud./nowych mocy wytwórczych instalacji wykorzyst. OZE-2,27MWhe/rok;Dodat. zdolność wyt. energii z OZE(CI30)-0,10232MW. Produkty: Liczba wybud. jednostek wytwarzania energii elektr. z OZE-1szt., Liczba wybud. jedn. wytwarzania energii cieplnej z OZE-1szt.; Liczba zmodern.energet.budynków-1szt.;Liczba budynk. dostosow.do potrzeb osób z niepełnospr.-1szt. Zakres obejm. wykonanie prac termomod.: *dociepl. stropu wewn., *ocieplenie ścian zew., *wymianę stolarki okienno-drzwiowej, *montaż kotła na biomasę o mocy 100kW, *montaż instalacji fotowolt.o mocy 2,32 kW, *wymiana instalacji co.; *moderniz. kotłowni, *montaż grzejn. stal.płytowych z zaworami i głowicami termostat.; *wykonanie robót towarzysz., *wym. oświetlenia na LED. Wydatki niekwalfik. - zakup schodolazu i dostos. łazienek dla potrzeb osób z niepełnospr. Zg. z audytem energ. efektywność energet. budynku wzrośnie o 61,44%; wybrano wariant inwest. dla OZE-kocioł na biomasę 100kW(s.30) i inst. fotowoltaiczna 2,32kW (s.38) Proj. zgodny z POP dla strefy lub. (Polish)
    0 references
    Target P.: Improving the quality of Wednesday nature in the municipality of Wohyń affecting the quality of life of the local community and increasing the competitiveness of the area. C. detail. are: 1.Optimising activities Increasing efficiency of the energetic sector publ., 2. Mitigating climate change through the emission of pollutants into the atmosphere, 3. Increase the use of energy generated from RES. Target group: users of the ZSZ building in Suchowoli (pupils and teachers), other residents and subm. functional. in the municipality of Wohyń. ZSZ building in Suchowoli 1441.96 m². The project results will be: The amount of heat savings -1441,28GJ/year; Amount of energy saved electric-23,22 MWh/year, Reduction of annual primary energy consumption in the publ.(CI32) -699894,44 kWh/year; Estimated annual decrease in heat gas emissions.(CI34) – 227,83 tonnes of CO2/year; Prod. thermal energy from newly built/new generation capacity. RES – 212,71MWht/year; Prod. power-elect from newly built/new generation capacity of the installation use. RES-2,27MWhe/year;Additional renewable energy capacity(CI30)-0.10232 MW. Products: Number of constructions of electricity generation units from RES-1 pcs, Number of constructions of one heat generation from RES-1pcs; Number of modern.energet.buildings-1pieces;Number of buildings. customizable to the needs of people with less than 1 pieces. Scope of the work of thermomodes.: *dociepl. interior floor, *wall warming, *exchange of window and door carpentry, *assembly of a biomass boiler with a power of 100 kW, *assembly of photovolt. with a power of 2,32 kW, *replacement of the co.; *modernise. boiler room, *heating installation. plate steel with valves and thermostat heads; *execution of works accompanying., *em. LED lighting. Expenses ineligible. — purchase of stairs and bathrooms for the needs of people with disabilities. The energy efficiency of the building will increase by 61.44 %; an investment variant for RES-boiler for biomass 100 kW(p. 30) and photovoltaic inst. 2,32 kW (p. 38) The project is compatible with the POP for the zone or. (English)
    20 October 2020
    0 references

    Identifiers

    RPLU.05.02.00-06-0023/19
    0 references