Thermo-modernisation of the building of a Health Centre in Graboowcu (Q105242)

From EU Knowledge Graph
Revision as of 08:55, 20 October 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The main objective of the project is to improve the quality of the environment (air purity) in the Grabowiec commune thanks to the deep thermal modernisation of public buildings. This goal will be achieved by installing RES installations in the health centre building in Grabowiec and by warming the outer partitions of the building. This will reduce the building’s heat demand, increase the use of renewable energy sources in the municipality, redu...)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Thermo-modernisation of the building of a Health Centre in Graboowcu
Project in Poland financed by DG Regio

    Statements

    0 references
    501,112.67 zloty
    0 references
    120,267.04 Euro
    13 January 2020
    0 references
    589,544.32 zloty
    0 references
    141,490.64 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    29 April 2016
    0 references
    30 December 2019
    0 references
    GMINA GRABOWIEC
    0 references
    Celem głównym projektu jest poprawa jakości środowiska naturalnego (czystości powietrza) na terenie gminy Grabowiec dzięki głębokiej termomodernizacji budynków użyteczności publicznej. Cel ten zostanie osiągnięty poprzez montaż instalacji OZE w budynku ośrodka zdrowia w Grabowcu oraz ocieplenie przegród zewnętrznych budynku. Dzięki temu nastąpi zmniejszenie zapotrzebowania na ciepło budynku, podniesienie poziomu wykorzystania odnawialnych źródeł energii w gminie, redukcja wydzielanych do atmosfery gazów cieplarnianych i innych substancji szkodliwych: (pyłów, dwutlenku siarki (SO2), dwutlenku azotu (NO2), tlenku węgla (CO) i dwutlenku węgla (CO2), podniesienie potencjału gminy w zakresie turystyki oraz rozwoju przedsiębiorczości związane z poprawą jakości środowiska naturalnego. Kluczowym rezultatem projektu będzie poprawiona jakość powietrza na terenie gm. Rezultat ten zostanie osiągnięty poprzez zadania realizowane w ramach projektu, związane z montażem instalacji OZE wykorzystujących odnawialne źródła en. oraz podjęte działania modernizacyjne przegród zewnętrznych budynku. Grupą docelową planowanego do realizacji projektu są Gmina Grabowiec oraz mieszkańcy gm. korzystający z efektów projektu. Pomimo iż w POP dla strefy lubelskiej nie wskazano działań naprawczych ani krótkoterminowych dla gm. Grabowiec (nie odnotowano przekroczenia poz. substancji podleg. ocenie jakości powietrza) to inwest. wpisuje się w zakres działań obniżających emisję pyłu PM10 z indywid. systemów grzewczych. Moc zainstalowanych instalacji OZE wynosi: instalacja solarna 6 kW. Efekt energetyczny (% oszcz energii końcowej) 73,26% Zakres inwestycji: Modernizacja inst c.o. Zamurowanie drzwi w piwnicy Wymiana bramy garażowej Ocieplenie stropodachu Ocieplenie ścian zewnętrznych Ocieplenie ścian piwnic nad gruntem Wymiana okien piwnicznych Modernizacja inst c.w.u. z instalacją solarną na dachu Ocieplenie ścian piwnic przy gruncie Ocieplenie podłogi w piwnicy Wymiana oświetlenia (Polish)
    0 references
    The main objective of the project is to improve the quality of the environment (air purity) in the Grabowiec commune thanks to the deep thermal modernisation of public buildings. This goal will be achieved by installing RES installations in the health centre building in Grabowiec and by warming the outer partitions of the building. This will reduce the building’s heat demand, increase the use of renewable energy sources in the municipality, reduce greenhouse gases and other harmful substances in the atmosphere: (dust, sulphur dioxide (SO2), nitrogen dioxide (NO2), carbon monoxide (CO) and carbon dioxide (CO2), enhancing the town’s tourism potential and entrepreneurship related to improving the quality of the environment. The key result of the project will be improved air quality in the building. This result will be achieved through tasks carried out within the framework of the project, related to installation of RES installations using renewable en. and the undertaken modernisation of the building’s outer partitions. The target group of the planned project is Grabowiec Municipality and residents benefiting from the project’s effects. Despite the fact that no corrective or short-term actions for Grabowiec (no exceedances of substance subject to the assessment of air quality) were indicated in the POP for the Lublin SEZ, the investment is part of the scope of measures to reduce PM10 emissions from individual heating systems. The power of the installed RES installations shall be: solar installation 6 kW. Energy effect (% final energy savings) 73.26 % Investment scope: Modernisation of central heating doors in the basement Replacement of garage gate Warm warming external walls Warming of the cellar walls over the ground Replacement of basement windows Modernisation of solar installation on the roof The warming of the cellar walls on the ground The warming of the floor in the basement Replacement of lighting (English)
    20 October 2020
    0 references