No label defined (Q108938)

From EU Knowledge Graph
Revision as of 17:54, 17 October 2020 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in 1 language: remove_english_label)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
No label defined
Project in Poland financed by DG Regio

    Statements

    0 references
    5,476,705.92 zloty
    0 references
    1,314,409.42 Euro
    13 January 2020
    0 references
    6,845,882.41 zloty
    0 references
    1,643,011.78 Euro
    13 January 2020
    0 references
    80.0 percent
    0 references
    23 December 2015
    0 references
    15 December 2018
    0 references
    GMINA SIEDLCE
    0 references
    0 references

    52°10'37.9"N, 22°9'49.7"E
    0 references
    Projekt obejmuje zadania inwestycyjne polegające na wykonaniu prac termomodernizacyjnych w siedmiu budynkach użyteczności publicznej w: ZO-W w Białkach, ZO w Golicach, ZO w Nowych Iganiach, ZO w Pruszynie, ZO w Stoku Lackim, ZO-W w Strzale, ZO w Żelkowie - Kolonii znajdujących się na terenie Gminy Siedlce, w powiecie siedleckim, woj. mazowieckim. Obecny stan techniczny budynków objętych projektem jest zły, występują duże straty ciepła i gmina ponosi wysokie koszty ogrzewania oraz wysokie koszty opłat ze energię elektryczną. W każdym z Zespołów Oświatowych przewidziano następujące prace: docieplenie obiektu- przegród zewnętrznych, w tym ścian zewnętrznych, dachów lub stropodachów, wymianę okien, wymianę drzwi zewnętrznych, instalację OZE w postaci paneli fotowoltaicznych w 5 Zespołach oraz wymianę opraw i źródeł światła na energooszczędne LED. Ponadto w ZO Golicach, Pruszynie, Strzale przewidziano docieplenie podłogi na gruncie. W wyniku realizacji projektu 7 budynków o łącznej kubaturze 49 645,73 m3, zostanie poddane pracom głębokiej termomodernizacji. W wyniku podjętych prac zaoszczędzone zostanie 2571263 kWh/rok energii. Projekt będzie realizowany w formule zaprojektuj i wybuduj. Wybór wykonawcy zostanie dokonany zgodnie z ustawą PZP. Po podpisaniu umowy przystąpi on do przygotowania dokumentacji projektowej, uzyska wymagane prawem pozwolenia, a następnie przystąpi do wykonania prac budowlanych. Zgodnie z ustawą PZP nastąpi wybór inspektora nadzoru, który będzie na bieżąco nadzorował prowadzone prace i odpowiadał za prawidłową realizację projektu. Ze strony gminy zostanie wyznaczony pracownik merytoryczny, który będzie nadzorował prawidłowy przebieg prac wykonawcy i inspektora. Grupą docelową projektu zgodnie z SZOOP RPO WM 2014-2020 będą mieszkańcy województwa mazowieckiego, w tym z terenu gminy Siedlce oraz siedem Zespołów Oświatowych znajdujących się na terenie gminy Siedlce zainteresowanych poprawą efektywności energetycznej infrastruktury publicznej. (Polish)
    0 references
    The project includes investment tasks consisting of carrying out thermal modernisation works in seven public utility buildings in: Zo-W in proteins, ZO in Golice, ZO in Nowe Iganiach, ZO in Pruszyna, ZO in Stoku Lacki, ZO in Strzale, ZO in Żelków – Cologne located in the municipality of Siedlce, in Siedlecki district, Mazowieckie voivodeship. The current technical condition of the buildings covered by the project is bad, there are significant heat losses and the municipality bears high heating costs and high costs of electricity charges. Each of the Educational Teams provides for the following work: warming of the object- external partitions, including external walls, roofs or stropodaches, window replacement, replacement of external doors, RES installation in the form of photovoltaic panels in 5 assemblies, and replacement of luminaires and light sources for energy-efficient LEDs. In addition, the ZO Golice, Pruszyna, Strzale provided for warming of the floor on the ground. As a result of the project, 7 buildings with a total volume of 49645.73 m³ will undergo deep thermomodernisation. As a result of the work undertaken, 2571263 kWh/year of energy will be saved. The project will be implemented in a formula design and build. The selection of the contractor will be made in accordance with the Public Procurement Law. After signing the contract, he will proceed to the preparation of the project documentation, obtain the permits required by law, and then proceed to carry out the construction work. In accordance with the PZP Act, the Supervisory Inspector will be selected, who will oversee ongoing work and be responsible for the correct implementation of the project. The municipality will appoint a substantive worker to supervise the proper conduct of the contractor’s work and the inspector. The target group of the project according to SZOOP RPO WM 2014-2020 will be residents of the Mazovian Voivodeship, including the area of the municipality of Siedlce and seven educational teams located in the municipality of Siedlce interested in improving the energy efficiency of public infrastructure. (English)
    17 October 2020
    0 references

    Identifiers

    RPMA.04.02.00-14-4536/16
    0 references