Improving the energy efficiency of an undertaking (Q105078)

From EU Knowledge Graph
Revision as of 17:50, 17 October 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The object of the project is a comprehensive thermal modernisation of the building, which, after the thermal modernisation and after carrying out other construction works, will be dedicated to the needs of warehouse and services and trade related to the activity of the Applicant. The main objective of the project is to increase the company’s energy efficiency through a thorough thermal modernisation of the building, which will carry out the foll...)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Improving the energy efficiency of an undertaking
Project in Poland financed by DG Regio

    Statements

    0 references
    640,807.81 zloty
    0 references
    153,793.87 Euro
    13 January 2020
    0 references
    1,165,105.12 zloty
    0 references
    279,625.23 Euro
    13 January 2020
    0 references
    55.0 percent
    0 references
    27 October 2017
    0 references
    30 June 2019
    0 references
    SYLWIA SAMULAK
    0 references
    0 references
    PRZEDMIOTEM PROJEKTU jest kompleksowa termomodernizacja budynku, który po termomodernizacji oraz po przeprowadzeniu pozostałych prac budowlanych będzie przeznaczony na potrzeby magazynowo- usługowo - handlowe związane z prowadzoną działalnością Wnioskodawcy. Głównym celem projektu jest zwiększenie efektywności energetycznej przedsiębiorstwa poprzez gruntowną termomodernizację budynku, w ramach której zostaną przeprowadzone następujące działania: - Modernizacja instalacji c.o. - Zmiana pokrycia dachu z blach stalowych na płyty warstwowe z rdzeniem z pianki poliuretanowej. - Wymiana poszycia ścian zewnętrznych z blachy na płyty warstwowe z rdzeniem z pianki poliuretanowej. - Wymiana poszycia ścian zewnętrznych z blachy na płyty warstwowe z rdzeniem z wełny mineralnej. - Wymiana powierzchni przeszklonych na nowe wraz ze zmniejszeniem powierzchni. - Budowa instalacji wentylacji mechanicznej z systemem odzysku ciepła. - Modernizacja instalacji oświetlenia wbudowanego. - Wymiana bram zewnętrznych na nowe wraz ze zmniejszeniem powierzchni. - Ocieplenie podłogi na gruncie warstwą styropianu wraz z wykonaniem wylewki betonowej. W EFEKCIE REALIZACJI PROJEKTU OSIĄGNIĘTE ZOSTANĄ NASTĘPUJĄCE WSKAŹNIKI: NA POZIOMIE PRODUKTU: - Liczba przedsiębiorstw otrzymujących wsparcie (CI1) -1 szt.; - Liczba przedsiębiorstw, które w wyniku wsparcia poprawiły efektywność energetyczną -1 szt.; - Liczba zmodernizowanych energetycznie budynków - 1 szt.; - Powierzchnia użytkowa budynków poddanych termomodernizacji - 1090,26 m2. NA POZIOMIE REZULTATU: - Ilość zaoszczędzonej energii cieplnej - 5 224,25GJ/rok; - Ilość zaoszczędzonej energii elektrycznej - 5,92 Mwh/rok; - Szacowany roczny spadek emisji gazów cieplarnianych (CI34) 365,62/rok; - Zmniejszenie zużycia energii końcowej w wyniku realizacji projektów - 5 245,57 GJ/rok (Polish)
    0 references
    The object of the project is a comprehensive thermal modernisation of the building, which, after the thermal modernisation and after carrying out other construction works, will be dedicated to the needs of warehouse and services and trade related to the activity of the Applicant. The main objective of the project is to increase the company’s energy efficiency through a thorough thermal modernisation of the building, which will carry out the following activities: — Modernisation of central heating system – Change of roof covering from steel sheets to sandwich panels with a core of polyurethane foam. — Replacement of outer wall plating from sheet metal to sandwich panels with a core made of polyurethane foam. — Replacement of outer wall plating from sheet metal to sandwich panels with mineral wool core. — Replacement of glazed surfaces into new surfaces with a decrease in surface area. — Construction of a mechanical ventilation system with heat recovery system. — Modernisation of built-in lighting system. — Replacement of external gates with new ones with a reduction of the surface. — Floor warming on the ground with a polystyrene layer together with concrete excavation. AS A RESULT OF THE PROJECT, THE FOLLOWING INDICATORS WILL BE ACHIEVED: AT PRODUCT LEVEL: — Number of enterprises receiving support (CI1) -1 units; — Number of companies that have improved energy efficiency as a result of support -1 pcs; — Number of energy-upgraded buildings – 1 pieces; — The usable area of buildings undergoing thermal modernisation – 1090.26 m². AT THE RESULT LEVEL: — The amount of thermal energy saved – 5 224,25GJ/year; — The amount of electricity saved – 5,92 MWh/year; — Estimated annual reduction in greenhouse gas emissions (CI34) of 365.62/year; — Reducing final energy consumption as a result of projects – 5 245.57 GJ/year (English)
    17 October 2020
    0 references

    Identifiers

    RPLU.05.01.00-06-0032/17
    0 references