No label defined (Q108927)

From EU Knowledge Graph
Revision as of 17:49, 17 October 2020 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in 1 language: remove_english_label)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
No label defined
Project in Poland financed by DG Regio

    Statements

    0 references
    279,764.97 zloty
    0 references
    67,143.59 Euro
    13 January 2020
    0 references
    497,531.67 zloty
    0 references
    119,407.6 Euro
    13 January 2020
    0 references
    56.23 percent
    0 references
    3 August 2017
    0 references
    31 December 2018
    0 references
    ANDRZEJ CHRÓST CHEMIKAL PARTNERS
    0 references
    0 references

    51°21'23.4"N, 21°35'4.2"E
    0 references
    Projektowana inwestycja w firmie Chemikal Partners w miejscowości Zielonka Stara 2a, działka 152/2 w gminie Zwoleń polegać będzie na: Budowie instalacji paneli fotowoltaicznych o mocy 39 960Wp.składająca się ze 148 szt. paneli posadowionych na dachu budynku produkcyjnego i budynku biurowego firmy Chemikal Partners oraz dwóch inwerterów o mocy 20,75 kWp każdy. Powierzchnia przeznaczona do przekształcenia w wyniku realizacji przedsięwzięcia wynosi ok 272 m2. Instalacja podłączona będzie do rozdzielni w budynku produkcyjnym. Energia ta będzie wykorzystywana na własne potrzeby. Układ wyposażony zostanie w automatykę sterującą pracą falowników. Szafka z zabezpieczeniami i ogranicznikami przepięć do instalacji ogniw fotowoltaicznych połączona będzie z istniejącą rozdzielnicą w budynku produkcyjnym. Na terenie projektuje się następującą instalację wewnętrzną zalicznikową: Instalacja solarna, Instalacja pomiędzy szafką zabezpieczeniową a inwerterami, Instalacja główna. Instalacja gruntowych pomp ciepłą o łącznej mocy 76,00 kWp składająca się z dwóch mikroinstalacji: instalacja pompy ciepła o mocy 38 kw i instalacja pompy ciepła o mocy 38 kw. w miejscowości Zielonka 2a działka nr 152/2 dla firmy Chemikal Partners Andrzej Chróst. Dotychczas budynek biurowy i budynek produkcyjny ogrzewane były za pomocą kotła na paliwo stałe. Projektuje się demontaż istniejącego kotła, zamknięcie obiegu grzewczego przez przeponowe naczynie wzbiorcze oraz montaż pompy ciepła firmy Vaillant która połączona będzie z drugą pompą ciepła i działała będzie w systemie kaskadowym. Dla zapewnienia pozyskiwania energii z gruntu zaprojektowano 20 otworów (sondy pionowe) o głębokości 95m każdy zlokalizowane na działce o numerze ewidencyjnym 152/2. Energia cieplna pozyskiwana będzie z gruntu przez pionowe wymienniki, U-rurki zabudowane w otworach wiertniczych. W celu ograniczenia liczby przewodów transportujących czynnik grzewczy do budynku zaprojektowano 2 studnie zbiorczą. (Polish)
    0 references
    The planned investment in Chemikal Partners in Zielonka Stara 2a, plot 152/2 in the municipality of Zwoleń will consist of: Construction of the installation of photovoltaic panels with a capacity of 39 960Wp. consisting of 148 panels placed on the roof of a production building and office building of Chemikal Partners and two 20.75 kWp inverters each. The area for conversion as a result of the project is about 272 m². The installation will be connected to the switchboard in the production building. This energy will be used for its own needs. The system will be equipped with automation that controls the operation of inverters. The cabinet with security features and surge limiters for the installation of photovoltaic cells will be connected to the existing switchboard in the production building. The following internal advance system shall be designed on the premises: Solar installation, Installation between safety cabinet and inverters, Main installation. Installation of ground heat pumps with a total power of 76,00 kWp consisting of two micro-installations: installation of 38 kW heat pump and installation of 38 kW heat pump in Zielonka 2a plot No 152/2 for Chemikal Partners Andrzej Chróst. Until now, the office building and the production building were heated with a solid fuel boiler. It is designed to dismantle an existing boiler, close the heating circuit through a diaphragm compressor and install a Vaillant heat pump which will be connected to the second heat pump and operate in a cascade system. To ensure the extraction of energy from the ground, 20 holes (vertical probes) with a depth of 95 m were designed each located on the plot with the registration number 152/2. Heat energy will be obtained from the ground by vertical exchangers, U-tubes built in drilling holes. In order to reduce the number of wires transporting the heating agent to the building, 2 collective wells were designed. (English)
    17 October 2020
    0 references

    Identifiers

    RPMA.04.01.00-14-9303/17
    0 references