CONSTRUCTION OF THE SANITARY SEWERAGE IN THE BLACK SEA — STAGE IV (Q105606)

From EU Knowledge Graph
Revision as of 16:43, 17 October 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): P. by increasing the number of people connected to an extensive network of sanitary canals will increase the availability and efficiency of the sewage collection system and improve the quality of service within the sewage department in Gm., improve and protect the state of the media. The built network will be able to benefit from a larger number of house guests, and the level of services provided will be increased and extended (eBOK, purchase of...)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
CONSTRUCTION OF THE SANITARY SEWERAGE IN THE BLACK SEA — STAGE IV
Project in Poland financed by DG Regio

    Statements

    0 references
    3,694,898.5 zloty
    0 references
    886,775.64 Euro
    13 January 2020
    0 references
    5,795,919.23 zloty
    0 references
    1,391,020.62 Euro
    13 January 2020
    0 references
    63.75 percent
    0 references
    16 April 2018
    0 references
    30 September 2019
    0 references
    GMINA SZCZEBRZESZYN
    0 references
    P. poprzez zwiększenie ilości osób podłączonych do rozbudowanej sieci kan. sanitarnej spowoduje zwiększenie dostępności i wydajności systemu odbioru ścieków oraz poprawę jakości obsługi w ramach gosp. ściekowej na terenie Gm., poprawę i ochronę stanu środ. natur. czystości wód i gleby, ochrony zdrowia ludzkiego na terenie gm. i dostosowanie gosp. ściekowej do wymagań środowiskowych Polski i UE. Z wybudowanej sieci będzie mogła skorzystać większa liczba gospod. dom., zaś poziom świadczonych usług zostanie zwiększony i rozszerzony (eBOK, zakup wodomierzy z funkcją radiowego odczytu, zakup urządzeń do pomiaru ilości i jakości ścieków oczyszcz.). Odsetek ludności korzystającej z oczysz. ścieków zwiększy się z 27,2% do ok. 37,2%. Wzrost il. podłączeń do sieci kana. sanitarnej na terenie gm. zapewni lepszy dostęp do tych usług, a tym samym doprowadzi do wyrównania różnic w dostępie do infrastruktury techn.. Budowa sieci kana. sanit. systemu mieszanego grawitacyjno - ciśnieniowego w m. Sz. zostanie wykonana techn. wykopów wąsko przestrzennych z wyjątkiem odcinków wykonywanych przewiertem i obejmie następujące ul.: Błonie, Boczna i Sadowa na odcinku 3736,5m. Klinowa, Gorajska, Frampolska, Sas Jaworskiej, Górna, Słoneczna na odcinku 1617,0m. Lubelska na odcinku 1070m. Zamojska, Nadrzeczna na odcinku 3266,0m . Wsk. produktu: Dług. wybudowanej kana. sanit.-9,68 km. Wsk. rezultatu: Przewidywana liczba os. korzystających z ulepszonego oczyszczania ścieków-1100 osób. Liczba dodatkowych os. korzystających z ulepszonego oczyszczania ścieków (CI19)-1050 os. Interesariusze głów.: pracownicy UMSz, pracownicy ZGK w Sz.; ZWL., Dep. Wdrażania EFRR UM Woj. Lub., wykonawcy inwes., Insp. nadzoru bud., Podmioty doradcze. Interes. drugorzędni: mieszkańcy bezpośr. korzystający z rozwiązań ramach proj., pozostali mieszkańcy GSz; osoby nie objęte systemem gosp. ściekowej Gm.; podm. gosp. funkcj. w Gm.. Interes. kontekstowi: Gm. konkurujące o środki w ramach przedm. konkursu, lokalne media. (Polish)
    0 references
    P. by increasing the number of people connected to an extensive network of sanitary canals will increase the availability and efficiency of the sewage collection system and improve the quality of service within the sewage department in Gm., improve and protect the state of the media. The built network will be able to benefit from a larger number of house guests, and the level of services provided will be increased and extended (eBOK, purchase of water meters with radio reading function, purchase of equipment for measuring the quantity and quality of sewage cleanse.). The percentage of the population using effluents will increase from 27.2 % to approx. IT’S 37.2 %. The increase in the number of connections to the sanitary canal network in Gm. will ensure better access to these services and thus to compensate for differences in access to techn infrastructure. The construction of the cana. sanitary network of the mixed gravitational-pressure system in m. Sz. will be performed by techn. excavations narrowly spatial, with the exception of sections made by drilling and will cover the following streets: Membrane, Side and Sadowa on a distance of 3736.5 m. Wedge, Gorajska, Frampolska, Sas Jaworska, Górna, Słoneczna on the section 1617.0 m. Lubelska on a stretch of 1070 m. Zamojska, Nadrzeczna on a stretch of 3266.0 m. Product Specification: Long-built cana. sanit.-9.68 km. For the result: Estimated number of people benefiting from improved wastewater treatment-1100 persons. Number of additional persons benefiting from improved waste water treatment (CI19)-1050 persons Stakeholders of the heads: UMSz employees, employees of ZGK in Sz.; ZWL., Dep. Implementation of ERDF UM Woj. Or., contractors inwes., Insp. supervision of the building., advisory entities. Second-rate interests: local residents benefiting from project solutions, other residents of GSz; persons not covered by the sewage management system Gm.; subm. gosp. function. in Gm. An Interest in Context: Gm. competing for pre-competition funds, local media. (English)
    17 October 2020
    0 references

    Identifiers

    RPLU.06.04.00-06-0019/17
    0 references