ECO-INNOVATION FOR GARBS MUNICIPALITY — PHASE II (Q104648)

From EU Knowledge Graph
Revision as of 16:39, 17 October 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The project (P.) will be located on the ter. voivodship Lubel., in the Lubelskie district, in the Garbów (GW) building. Scope P. assumes installation of 444 sets of salts. 443pcs in object. private and 1pcs ob. publ. to warm. CWU with a total power of 1,8054 MW. P. predicts also the project and execution of the internet portal, which will perform the functions of educating, promoc. and offer online services. Total number of bellows. GW use it. (...)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
ECO-INNOVATION FOR GARBS MUNICIPALITY — PHASE II
Project in Poland financed by DG Regio

    Statements

    0 references
    3,601,008.0 zloty
    0 references
    864,241.92 Euro
    13 January 2020
    0 references
    4,236,480.0 zloty
    0 references
    1,016,755.2 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 April 2016
    0 references
    31 July 2019
    0 references
    GMINA GARBÓW
    0 references
    0 references
    Projekt (P.) zlokaliz. będzie na ter. woj. lubel., w pow. lubelskim., w gm. Garbów(GW).Teren P. obejmuje wszystkie miejsc. w GW. Zakres P. zakłada instalację 444 szt. zestaw. kol. słon. 443szt w obiekt. prywat. i 1szt ob. publ. do podgrz. CWU o sum. mocy 1,8054 MW. P. przewid. również zaprojekt. i wykon. portalu internet., który będzie pełnił funkcje eduk., promoc. oraz oferował usługi on-line. Łączna liczba mieszk. GW korzyst. (GRUPA DOCELOWA) z efektów realiz. P. wyniesie ponad 1700 w 444 obiekt. Instalacje, będące przez cały okres trwałości (5lat) własn. partnerów, zost. usytuow. na budyn. stanow. własn. osób prywat., z którymi GW. podpisała um. użycz. oraz PL. GŁÓWNYM CELEM P. jest zwiększ. stosow. OZE na terenie GW. Cele szczegół.: CEL 1: Upowszechn. techno. wytwarz. czystej energii wśród mieszk. poprzez powsz. montaż OZE na terenie gminy [1,8054 MW w 2019r.].; CEL 2: Zmniejsz. obciążeń finans. społeczn. lokalnej wynikaj. z opłat za energ. dzięki utworz. Indy wid. Instal. wykorzysta. OZE [764,64Mwht/rok od 2020r.]; CEL 3: Reduk. zanieczyszcz. powietrza atmosf. poprzez zmniejsz. emisji związków szkodl. dzięki zwiększ. udziału energii ze źródeł odnawialnych [260,76 t. ekwiwal. CO2 / rok od 2020r.]. P. przycz. się do realiz. zarówno celu prioryt. 4 (zakład. wsparcie wytwarz. i wykorz.. ener. pochodz. z OZE), jak i celu główn. RPO WL, tj. podn. konkurencyj. regionu w oparciu o wewn. potencj., sprzyjaj. zwiększ. spójn. społ. i terytor. P., obok korz. społ. i gosp. będzie wpływ. na skuteczniejsze przeciwdzi. zmianom klimatu. P. wpis. się w cele operac. (2.5- Wyposaż. Obsz. Wiej. w infrastr. transp., komun., energet.; 3.6 - Rozw. społ. Informac. [uruch. Serw. www] w stand. WCAG 2.0]; 4.5 - Racjonal. i efektyw. wykorzysta. zasob. przyr. dla potrzeb gosp. i rekreac., przy zachow. i ochron. walorów środ. przyrodn.) wskaz. w SRWL 2014-2020. GW. Usytuow. jest w (OSI): Nowoczes. wieś. P. realizow. będzie poza obsz. Nat.2000. GW. dysponuje niezbędną dok. oraz opiniami adm. (Polish)
    0 references
    The project (P.) will be located on the ter. voivodship Lubel., in the Lubelskie district, in the Garbów (GW) building. Scope P. assumes installation of 444 sets of salts. 443pcs in object. private and 1pcs ob. publ. to warm. CWU with a total power of 1,8054 MW. P. predicts also the project and execution of the internet portal, which will perform the functions of educating, promoc. and offer online services. Total number of bellows. GW use it. (target GRUPA) with the effects of implementations. P. will be more than 1700 in 444. Installations, which are throughout the shelf life (5 years) own partners, zost. location. on the state building own private persons with whom GW. signed um. lender. and PL. The main CELEM P. is increase. RES in the GW area. The objectives of the detail: OBJECTIVE 1: Upowszechn. techno. produce clean energy among inhabitants through the overhead assembly of RES in the commune [1,8054 MW in 2019]; OBJECTIVE 2: Reduce the financial burden. local community results. from energetic fees thanks to creation. The Indy wid. Instal. will use it. RES [764,64Mwht/year from 2020]; OBJECTIVE 3: Reduce. air pollution atmosf. by reducing emissions of harmful compounds by increasing the share of energy from renewable sources [260.76 t. equivalent. CO2/year from 2020]. P. learn to pursue both the priority objective. 4 (found. support for the production and extinguishing.. ener. come from RES) as well as the main target. RPO WL, i.e. the competition of the region based on the internal potent, favour. increase. cohesive social and teritor. P., in addition to the social cortex and the gosp. will have an impact on the more effective fight against climate change. P. entry. to the objectives of OPERAC. (2.5- Equipment. Oh, no, no. Infrastr. transp., commune, energet.; 3.6 – Development. Let me know. [Come on. “WWW] in stand. WCAG 2.0]; 4.5 – Rational and effective use of resources for the needs of gossip and recreation, at maintenance and protection of the values of Wednesday. Nature) indication in SRWL 2014-2020. IT’S A GW. The situation is in (OSI): Nowoczes. Village. P. realizow. will be outside. Nat.2000. GW. has the necessary dock and adm opinions. (English)
    17 October 2020
    0 references

    Identifiers

    RPLU.04.01.00-06-0022/16
    0 references