Increase the energy efficiency of public utility facilities, i.e. the building of the City and Municipality and the School and Preschool Complex in Witnica. (Q100326)
Jump to navigation
Jump to search
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Increase the energy efficiency of public utility facilities, i.e. the building of the City and Municipality and the School and Preschool Complex in Witnica. |
Project in Poland financed by DG Regio |
Statements
1,927,747.41 zloty
0 references
2,267,938.14 zloty
0 references
85.0 percent
0 references
1 October 2015
0 references
31 July 2019
0 references
GMINA WITNICA
0 references
Przedmiotem projektu jest termomodernizacja oraz budowa elektrycznej instalacji fotowoltaicznej na budynku Urzędu Miasta i Gminy oraz na budynku Zespołu Szkolno-Przedszkolnego w Witnicy. Przedsięwzięcie zaplanowane zostało w celu: - zmniejszenia kosztów zużycia energii przez Wnioskodawcę – cel bezpośredni; - ograniczenia negatywnego wpływu na środowisko związanego z produkcją i zużyciem energii w sposób tradycyjny, z wykorzystaniem paliw nieodnawialnych – cel pośredni; - wzrost udziału produkcji z OZE na terenie województwa – cel pośredni; - podniesienie efektywności ogrzewania; - poprawa stanu środowiska naturalnego poprzez zmniejszenie emisji gazów cieplarnianych i substancji; - poprzez ocieplenie ścian, wymianę okien i drzwi - usprawnienie wentylacji pomieszczeń, podniesienie komfortu termicznego osób korzystających z budynku. Przeprowadzone prace wpłyną na poprawę mikroklimatu pomieszczeń i w przypadku budynku szkolno-przedszkolnego stworzą lepsze warunki do nauki. W ramach projektu planuje się realizację następujących zadań: Prace przygotowawcze: 1. Sporządzenie dokumentacji technicznej 2. Sporządzenie Studium wykonalności 3. Przygotowanie dokumentacji dot. postępowania dla wyboru wykonawcy inwestycji 4. Ogłoszenie postępowania na realizację inwestycji 5. Rozstrzygnięcie postępowania; podpisanie umowy z wykonawcą inwestycji Termomodernizacja UMiG: 1. Docieplenie ścian zewnętrznych 2. Docieplenie dachu 3. Wymiana stolarki okiennej i drzwiowej 4. Poprawa sprawności cieplnej systemu grzewczego Termomodernizacja Szkoły: 1. Docieplenie ścian zewnętrznych – szkoła 2. Docieplenie ścian zewnętrznych – sala gimnastyczna i łącznik 3. Docieplenie dachu 4. Wymiana stolarki okiennej i drzwiowej 5. Poprawa sprawności cieplnej systemu grzewczego Budowa instalacji fotowoltaicznej w Urzędzie Miasta i Gminy oraz w Zespole Szkolno-Przedszkolnym: 1. Montaż systemu mocowania 2. Montaż i konfiguracja paneli fotowoltaicznych (Polish)
0 references
The subject of the project is the thermal modernisation and construction of an electrical photovoltaic installation on the building of the City and Municipality and on the building of the School and Preschool Complex in Witnica. The project was planned to: — reducing the costs of the applicant’s energy consumption – a direct objective; — limiting the negative environmental impacts of production and consumption of energy traditionally using non-renewable fuels – an indirect objective; — an increase in the share of RES production in the voivodship – an indirect objective; — increasing the efficiency of heating; — improving the environment by reducing emissions of greenhouse gases and substances; — by warming the walls, replacing windows and doors – improving the ventilation of rooms, increasing the thermal comfort of people using the building. The work carried out will improve the microclimate of the premises and in the case of the school-pre-school building will create better conditions for learning. The project plans to carry out the following tasks: Preparatory work: 1. Preparation of technical documentation 2. Preparation of feasibility study 3. Preparation of documentation concerning the procedure for the selection of the contractor of the investment 4. Announcement of the procedure for the implementation of the investment 5. The decision of the procedure; signing of the contract with the contractor Thermomodernisation of UMiG: 1. Warming of the outer walls 2. Roof warming 3. Replacement of window and door carpentry 4. Improving the thermal efficiency of the heating system Thermomodernisation of the school: 1. Warming of the outer walls – school 2. Insulation of the outer walls – gym and connector 3. Roof warming 4. Replacement of window and door carpentry 5. Improvement of thermal efficiency of heating system Construction of photovoltaic installation in the City and Municipal Office and in the School and Preschool Complex: 1. Installation of mounting system 2. Installation and configuration of photovoltaic panels (English)
16 October 2020
0 references
Identifiers
RPLB.03.02.01-08-0042/16
0 references