No label defined (Q100307)

From EU Knowledge Graph
Revision as of 00:40, 16 October 2020 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in 1 language: remove_english_label)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
No label defined
Project in Poland financed by DG Regio

    Statements

    0 references
    1,063,896.15 zloty
    0 references
    255,335.08 Euro
    13 January 2020
    0 references
    1,251,642.6 zloty
    0 references
    300,394.22 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    14 March 2016
    0 references
    31 July 2018
    0 references
    GMINA SKĄPE
    0 references
    0 references

    52°9'10.8"N, 15°27'30.6"E
    0 references
    Przedmiotem projektu jest inwestycja w infrastrukturę Publicznego Gimnazjum im. A Fiedlera w Radoszynie oraz Publicznej Szkoły Podstawowej im. Janusza Korczaka w Międzylesiu, polegająca na termomodernizacji budynków i poprawie ich efektywności energetycznej. Wnioskodawcą i Beneficjentem projektu jest Gmina Skąpe. Realizacja projektu w szczególności dotyczyć będzie następujących elementów dostaw i robót budowlanych: 1) Gimnazjum w Radoszynie: • termomodernizację stropodachu; • ocieplenie ścian zewnętrznych; • wymianę okien zewnętrznych; • montaż paneli fotowoltaicznych na dachu rozpatrywanego budynku; • modernizację systemu centralnego ogrzewania (c.o.) i ciepłej wody użytkowej (c.w.u.) poprzez: a) montaż kotła gazowego kondensacyjnego z automatyką; b) montaż pompy ciepła typu powietrze/woda; c) montaż pojemnościowego podgrzewacza wody; d) montaż wymiennika ciepła; e) dostosowanie instalacji kanalizacyjnej; f) przebudowa i dostosowanie instalacji wentylacji; g) przebudowa instalacji grzewczej (rury i zawory); h) montaż automatyki pogodowej; 2) Szkoła podstawowa w Międzylesiu: • termomodernizację stropodachu; • ocieplenie ścian zewnętrznych; • wymianę okien zewnętrznych; • montaż paneli fotowoltaicznych na dachu rozpatrywanego budynku; • modernizację systemu centralnego ogrzewania (c.o.) i ciepłej wody użytkowej (c.w.u.) poprzez: a) montaż kotła gazowego kondensacyjnego z automatyką; b) montaż pompy ciepła typu powietrze/woda; c) montaż pojemnościowego podgrzewacza wody; d) montaż wymiennika ciepła; e) dostosowanie instalacji kanalizacyjnej; f) przebudowa instalacji grzewczej (rury i zawory); g) montaż automatyki pogodowej. Dodatkowo w ramach projektu poniesione zostaną koszty przygotowawcze (związane z opracowaniem Studium Wykonalności, inwentaryzacją przyrodniczą oraz przygotowaniem dokumentacji projektowej i audytów energetycznych). W kosztach zarządzania projektem poniesione będą koszty nadzoru inwestorskiego oraz autorskiego. Projek (Polish)
    0 references
    The subject of the project is an investment in the infrastructure of the Fiedler Public High School in Radoszyn and the Janusz Korczak Public Primary School in Międzyles, which consists of thermomodernising buildings and improving their energy efficiency. The applicant and beneficiary of the project is the Municipality of Snake. The implementation of the project will in particular concern the following elements of supply and works: 1) Radoszyn High School: • thermomodernisation of stropod; • warming of the outer walls; • replacement of external windows; • installation of photovoltaic panels on the roof of the building under consideration; • modernisation of central heating system (c.o.) and hot water (c.w.u.) by: installation of a condensing gas boiler with automation; installation of an air/water heat pump; the installation of a capacitive water heater; installation of a heat exchanger; the adaptation of the sewage system; F) Reconstruction and adaptation of ventilation systems; reconstruction of the heating system (tubes and valves); the installation of weather automation; 2) Elementary school in Międzylesie: • thermomodernisation of stropod; • warming of the outer walls; • replacement of external windows; • installation of photovoltaic panels on the roof of the building under consideration; • modernisation of central heating system (c.o.) and hot water (c.w.u.) by: installation of a condensing gas boiler with automation; installation of an air/water heat pump; the installation of a capacitive water heater; installation of a heat exchanger; the adaptation of the sewage system; refurbishment of the heating system (tubes and valves); g) mounting of weather automation. In addition, the project will pay preparatory costs (related to the preparation of the Feasibility Study, natural inventory and preparation of project documentation and energy audits). The costs of investor and copyright supervision will be borne in the project management costs. Project (English)
    16 October 2020
    0 references

    Identifiers

    RPLB.03.02.01-08-0023/16
    0 references