Modernisation of street lighting in Bukowiec commune for energy-saving, environmentally friendly equipment (Q98291)

From EU Knowledge Graph
Revision as of 23:27, 15 October 2020 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in 1 language: translated_label)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Modernisation of street lighting in Bukowiec commune for energy-saving, environmentally friendly equipment
Project in Poland financed by DG Regio

    Statements

    0 references
    453,671.09 zloty
    0 references
    108,881.06 Euro
    13 January 2020
    0 references
    620,956.88 zloty
    0 references
    149,029.65 Euro
    13 January 2020
    0 references
    73.06 percent
    0 references
    1 October 2016
    0 references
    31 October 2019
    0 references
    GMINA BUKOWIEC
    0 references
    Przedmiotem projektu jest modernizacja oświetlenia ulicznego przy ul. Dworcowej oraz Ceynowy poprzez budowę nowych punktów świetlnych. Celem projektu jest poprawienie efektywności energetycznej systemu oświetleniowego poprzez zastosowanie bardziej energooszczędnych opraw oświetleniowych oraz zastosowanie systemu sterowania z możliwością zredukowania mocy opraw w okresie cyklu, w którym nie jest wymagany maksymalny strumień świetlny. Celem modernizacji jest również dostosowanie parametrów oświetlenia ulicznego do obowiązujących przepisów prawnych.Całkowite nakłady inwestycyjne projektu pn. ,,Modernizacja oświetlenia ulicznego na terenie Gminy Bukowiec na urządzenia energooszczędne, proekologiczne” wynoszą 647 836,88 zł. Zakres rzeczowy przedmiotowej inwestycji został określony na podstawie opracowanego audytu energetycznego w zakresie oświetlenia ulicznego.Na całkowite koszty inwestycji składają się następujące wydatki:• Przygotowanie dokumentacji technicznej wraz z audytem;• Przygotowanie studium wykonalności;• Nadzór inwestorski;• Roboty budowlane i instalacyjne;• Promocja projektu.Nie wszystkie koszty w ramach projektu są kwalifikowane. Do kosztów kwalifikowanych zaliczany roboty budowlane i instalacyjne oraz nadzór inwestorski. Pozostałe wydatki są kosztami niekwalifikowanymi w projekcie. Realizację inwestycji zaplanowano na lata 2016-2019. Projekt nie jest objęty pomocą publiczną. (Polish)
    0 references
    The subject of the project is the modernisation of street lighting at ul. Railway station and Ceynne through the construction of new light points. The aim of the project is to improve the energy efficiency of the lighting system by using more energy-efficient luminaires and using a control system capable of reducing the power of the luminaires during a cycle period in which the maximum luminous flux is not required. The aim of the modernisation is also to adapt the parameters of street lighting to the applicable legal regulations. Modernisation of street lighting in Bukowiec commune for energy-saving, environmentally friendly devices" amounts to PLN 647 836.88. The material scope of the investment was determined on the basis of the developed energy audit in the field of street lighting.The total investment costs consist of the following expenses:• Preparing technical documentation together with audit;• Preparing a feasibility study;• Investor supervision;• Construction and installation works;• Promotion of the project.Not all costs within the project are eligible. The eligible costs include construction and installation works and investor supervision. Other expenses are non-eligible costs in the project. The investment is planned for the years 2016-2019. The project is not covered by public aid. (English)
    15 October 2020
    0 references

    Identifiers

    RPKP.03.04.00-04-0012/18
    0 references