Creation of a research and development laboratory at Kotłoinwest Sp. z o.o. (Q97874)

From EU Knowledge Graph
Revision as of 22:09, 15 October 2020 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in 1 language: translated_label)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Creation of a research and development laboratory at Kotłoinwest Sp. z o.o.
Project in Poland financed by DG Regio

    Statements

    0 references
    2,341,350.0 zloty
    0 references
    561,924.0 Euro
    13 January 2020
    0 references
    5,203,000.0 zloty
    0 references
    1,248,720.0 Euro
    13 January 2020
    0 references
    45.0 percent
    0 references
    1 March 2018
    0 references
    31 December 2019
    0 references
    KOTŁOINWEST SP. Z O.O.
    0 references
    0 references
    Projekt polega na budowie laboratorium i wyposażeniu go w infrastrukturę badawczo-rozwojową tj.urządzenia/sprzętu/wart. niemat. i prawn. do prac badawcz. i doświadcz. oraz aparaturę naukowo-badawczą w celu prowadzenia prac B+R nad opracowaniem innowacyjnej metody spawania konstrukcji stalowych drutem proszkowym 136 o zakresie 5-40mm. Powyższe umożliwi wprowadzenie do oferty firmy udoskonalonych usług w postaci: udoskonalonej usługi spawania urządzeń dźwigowych oraz udoskonalonej usługi spawania rurociągów technologicznych, które będzie charakteryzować dużo większa jakość, wytrzymałość, trwałość oraz żywotność wykonanych spoin.Dodatkowo zapewni to dokonanie zasadniczej zmiany z sposobie świadczonych dotychczas usług spawania, tj. w chwili obecnej mają miejsce dwa odrębne procesy spawania stali czarnej i stali kwaśnej. Po zakończeniu badań firma zamierza połączyć oba procesy spawania.Realizacja zamierzenia będzie możliwa poprzez budowę laboratorium oraz zakup wyposażenia/sprzętów laboratoryjnych w postaci: zestawu (laboratorium) radiografii cyfrowej, miernika natężenia światła, walizki inspekcyjnej, wzorca do badań NT, Norm do badań VT, PT, UT, MT, RT , ET, spektrometru, urządzenia do badań prądami wirującymi oraz suwnicy.Całość ww. zakresu jest niezbędna aby stworzyć zaplecze badawczo-rozwojowe firmy Wnioskodawcy, niezbędne do prowadzenia prac B+R w nastepujących obszarach badawczych:1. Badania dotyczące prac doświadczalnych oraz analiz ich wyników dla spawania blach doczołowo i pachwinowo w różnorakich pozycjach spawania.2. Badania dotyczące prac doświadczalnych oraz analiz ich wyników dla spawania rur doczołowo i pachwinowo w różnorakich pozycjach spawania, gdzie dodatkowo uwzględnione zostanie spawanie pachwinowe rur do płyt roboczych. (Polish)
    0 references
    The project consists of building a laboratory and equipping it with R & D infrastructure, i.e. equipment/equipment/wart. nomat. and legal. for research and experience, as well as research equipment for R & D to develop an innovative method of welding steel structures with powder wire 136 with a range of 5-40 mm. The above will enable the company to introduce improved services in the form of: improved welding services of lifting equipment and improved welding services of technological pipelines, which will be characterised by much higher quality, durability, durability and service life of made joints.In addition, this will ensure a fundamental change from the way welding services provided so far, i.e. at present there are two separate processes of welding of black steel and acid steel. After completion of the research, the company intends to combine both welding processes.The aim will be possible through the construction of a laboratory and purchase of laboratory equipment/equipment in the form of: a set (laboratory) of digital radiography, a light intensity meter, an inspection case, an NT test standard, a standard for testing VT, PT, UT, MT, RT, ET, spectrometer, spinning current test equipment and overhead crane. Research on experimental work and analysis of their results for butt and inguinal welding in various welding positions.2. Research on experimental work and the analysis of their results for butt and inguinal welding in various welding positions, where additional consideration will be given to inguinal welding of working plates. (English)
    15 October 2020
    0 references

    Identifiers

    RPKP.01.02.01-04-0050/17
    0 references