No label defined (Q95496)

From EU Knowledge Graph
Revision as of 21:56, 15 October 2020 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in 1 language: remove_english_label)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
No label defined
Project in Poland financed by DG Regio

    Statements

    0 references
    3,638,036.91 zloty
    0 references
    873,128.86 Euro
    13 January 2020
    0 references
    4,280,043.45 zloty
    0 references
    1,027,210.43 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    18 April 2016
    0 references
    31 July 2019
    0 references
    POWIAT OLEŚNICKI
    0 references
    Okres realizacji proj: I kw. 2016 r.- III kw. 2018 r. Inwestycja dotyczy termomodernizacji 3 bud. Zespołu Szkół Ponadgimnazjalnych w Sycowie przy ul. Daszyńskiego 42,w pow. oleśnickim. Inwestycja jest wpisana do PGN dla Gminy Syców na lata 2015-2020,przyjętego do realizacji uchwałą Rady Miejskiej w Sycowie nr XX/142/2016 z dn. 24.03.2016. Termomodernizacja obejmuje docieplenie budynków, wymianę stolarki, wymianę syst. grzewczych na kotły spalające biomasę wyposażone w automatykę pogodową, instal. systemów CWU podłączonych do kotłów spalających biomasę i pomp ciepła typu split. Inwestycja zakłada instal. oświetlenia wbudowanego w tym wymianę na oświetlenie LED dla 3 bud. Zostanie wybudowana 1 jedn. wytwarzania energii elektrycznej z OZE-instalacja Pv dla 3 bud.szkoły;wybudowanie 3 szt. jedn. wytwarzania EC z OZE(3 kotły spalające biomasę z pompami ciepła zasilające CO i systemy CWU). Instalacja Pv-o mocy szczytowej 50 kWp pracującą niezależnie od sieci energetycznej (w systemie „off- grid").Planowane są prace towarzyszące:wykonanie kosztorysów, projek. wykon., nadzoru inwest. Użytkownicy infrast. będą edukowani w kierunku efektywnego zarządzania energią w obiekcie szkolnym. W każdym bud. zostanie wdrożony system zarządzania energią-Zawory T-R Reg.Pog. Cele proj.: osiągnięcie min.25% oszczęd. energii, poprawa efektyw. energet. źr. ciepła o min.30%,zmniejszenia emisji CO2 o min.30% w 3 bud.ZSP w Sycowie, po roku eksploatacji inwest. Inwest. obejmuje 5 928,61 m2 pow. użytkowej 3 bud.ZSP w Sycowie. Inwest. ma przyczynić się do zmniejszenia zużycia EP w tych bud. o 2 327 594,06 kWh/rok(śr.efekt. dla całej inwest: 90,71%). Szacowany roczny spadek emisji gazów cieplarnianych po roku eksploatacji infastrk. 3 bud.:683,90 t równoważnika CO2/rok(śr.efekt. dla całej inwestycji: 89,10%).W okresie 12 m-cy od zakończenia okresu realizacji proj. określonego w umowie o dofinansowaniu proj. zakłada się uzyskanie zaoszczędzonej EC: 3 417,550 GJ/rok dla całej inwest. (Polish)
    0 references
    Project implementation period: And a quarter. 2016 – III sq. 2018 The investment concerns thermomodernisation of 3 constructions. The team of secondary schools in Syców at ul. Daszyński 42, in the Oleśnica district. The investment is entered in the PGN for the commune of Syców for the years 2015-2020, adopted for implementation by resolution of the Municipal Council in Syców XX/142/2016 of the date. 24.03.2016. Thermal modernisation includes warming of buildings, replacement of carpentry, replacement of heating systems with biomass burning boilers equipped with weather automation, CWU systems connected to boilers burning biomass and heat pumps split type. The investment assumes an installation of built-in lighting including replacement for LED lighting for 3 buildings. 1 single generation of electricity from RES-installation Pv for 3 school buildings;construction of 3 units of one EC production with RES(3 boilers burning biomass with heat pumps supplying CO and CWU systems). Installation of Pv-with peak power of 50 kWp operating independently of the power grid (off-grid).Accompanying works are planned: execution of estimates, project execution, investment supervision. Users of infrast. will be educated in the direction of efficient energy management in the school facility. The energy management system-T-R Reg.Pog valves will be implemented in each building. Objectives of the project: achieving at least 25 % energy saving, improving energy efficiency in heat by min.30 %, reducing CO2 emissions by at least 30 % in 3.ZSP in Syców, after one year of operation, investment. The investment covers 5928,61 m² of usable area of 3 buildings.ZSP in Syców. The investment is intended to reduce EP consumption in these buildings by 2327594.06 kWh/year(mean effect. for the whole investment: 90.71 %). Estimated annual decrease in greenhouse gas emissions after the year of operation of infastrk. 3 construction: 683,90 t CO2 equivalent/year(mean effect for the whole investment: 89.10 %).In the period of 12 months from the end of the project implementation period specified in the financing agreement, the project is expected to obtain a saved EC: 3 417.550 GJ/year for the whole investment. (English)
    15 October 2020
    0 references

    Identifiers

    RPDS.03.03.01-02-0021/16
    0 references