Energy renovation of the 9 buildings of the Regional Hospital for neurology and Hospitality in Lubiegu (Q95470)

From EU Knowledge Graph
Revision as of 21:55, 15 October 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The subject of the project is the energy modernisation of 9 buildings of the Provincial Hospital for Nervous and Psychically Sick in Lubiąż, including: a)warming of external bulkheads and providing the currently required heat resistance;b)exchange of windows into more tight;c) introducing controlled ventilation using vents;d)assembly of thermostatic perlators and valves and meters as components of the energy management system. In addition, it is...)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Energy renovation of the 9 buildings of the Regional Hospital for neurology and Hospitality in Lubiegu
Project in Poland financed by DG Regio

    Statements

    0 references
    2,438,875.84 zloty
    0 references
    585,330.20 Euro
    13 January 2020
    0 references
    2,869,265.7 zloty
    0 references
    688,623.77 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    25 April 2016
    0 references
    31 December 2017
    0 references
    WOJEWÓDZKI SZPITAL DLA NERWOWO I PSYCHICZNIE CHORYCH W LUBIĄŻU
    0 references
    0 references
    Przedmiotem projektu jest modernizacja energetyczna 9 budynków Wojewódzkiego Szpitala dla Nerwowo i Psychicznie Chorych w Lubiążu obejmująca: a)docieplenie przegród zewnętrznych i zapewnienie obecnie wymaganego oporu cieplnego;b)wymianę okien na bardziej szczelne;c) wprowadzenie wentylacji kontrolowanej z zastosowaniem nawiewników;d)montaż perlatorów i zaworów termostatycznych oraz liczników jako elementów systemu zarządzania energią. Ponadto przewiduje się zorganizowanie w ramach umowy z wykonawcą robót budowlanych szkoleń z obsługi urządzeń/systemów zarządzania energią dla osób stale korzystających z budynków (aby możliwe było osiągnięcie i utrzymanie zakładanych oszczędności energii).Przeprowadzenie działań ujętych w projekcie w sposób wyczerpujący zapewni osiągnięcie celów projektu. Inwestycja ma charakter kompleksowy, tj. zawiera wszystkie obowiązkowe komponenty: termomodernizacyjny z uzyskaną minimalną wymaganą oszczędnością energii w każdym budynku, zarządzania energią (montaż termostatów, perlatorów oraz liczników w każdym budynku) i komponent edukacyjny (szkoleniowy) – odniesienie się do kryterium kompleksowości modernizacji energetycznej budynku. Łącznie realizacja projektu pozwoli na zmniejszenie zapotrzebowania na ciepło o 10 910 GJ/rok, co daje średnią oszczędność energii dla wszystkich budynków na poziomie 28,74%, a także pozwoli na zredukowanie niskiej emisji gazów cieplarnianych i pyłów do atmosfery o ponad 5 ton na rok pyłów zawieszonych (PM 10g/GJ: 5 018 600) oraz redukcję CO2 o 1036 ton/rok. W każdym budynku oszczędność zapotrzebowania ciepła wyniesie powyżej 25%.Beneficjentem, Inwestorem i Operatorem projektu jest Wnioskodawca. Projektem będzie zarządzał powołany przez Dyrektora Szpitala Zespół Projektowy. Realizacja projektu przebiegać będzie zgodnie z polityką konkurencji i zamówień publicznych. (Polish)
    0 references
    The subject of the project is the energy modernisation of 9 buildings of the Provincial Hospital for Nervous and Psychically Sick in Lubiąż, including: a)warming of external bulkheads and providing the currently required heat resistance;b)exchange of windows into more tight;c) introducing controlled ventilation using vents;d)assembly of thermostatic perlators and valves and meters as components of the energy management system. In addition, it is envisaged to organise, within the framework of a contract with the contractor, training in the operation of energy management equipment/systems for permanent users of buildings (in order to achieve and maintain the expected energy savings).The implementation of activities included in the project in a comprehensive manner will ensure that the project objectives are achieved. The investment is comprehensive, i.e. it contains all the mandatory components: thermal retrofitting with the achieved minimum required energy savings in each building, energy management (assembly of thermostats, perlators and meters in each building) and the educational component (training) – refers to the criterion of the complexity of energy modernisation of the building. In total, the project will reduce the demand for heat by 10 910 GJ/year, resulting in an average energy saving for all buildings of 28.74 %, and will reduce the low emissions of greenhouse gases and dust into the atmosphere by more than 5 tonnes per year of particulate matter (PM 10 g/GJ: 5 018 600) and a CO2 reduction of 1036 tonnes/year. In each building, the saving of heat demand will be above 25 %.Beneficiary, Investor and Operator of the project is the Applicant. The project will be managed by a Project Team appointed by the Hospital Director. The project will be implemented in accordance with competition policy and public procurement. (English)
    15 October 2020
    0 references

    Identifiers

    RPDS.03.03.01-02-0002/16
    0 references