Construction and modernisation of the power grid with voltage SN and nN enabling connection of electricity generation units from RES in the municipality of Zgorzelec and Osiecznica (Q95404)

From EU Knowledge Graph
Revision as of 21:53, 15 October 2020 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in 1 language: translated_label)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction and modernisation of the power grid with voltage SN and nN enabling connection of electricity generation units from RES in the municipality of Zgorzelec and Osiecznica
Project in Poland financed by DG Regio

    Statements

    0 references
    2,777,887.2 zloty
    0 references
    666,692.93 Euro
    13 January 2020
    0 references
    3,336,000.0 zloty
    0 references
    800,640.0 Euro
    13 January 2020
    0 references
    83.27 percent
    0 references
    9 June 2016
    0 references
    8 July 2019
    0 references
    TAURON DYSTRYBUCJA SPÓŁKA AKCYJNA
    0 references
    0 references
    Przedmiot projektu W ramach projektu „Budowa i modernizacja sieci elektroenergetycznej o napięciu SN i nN umożliwiająca przyłączanie jednostek wytwarzania energii elektrycznej z OZE na terenie gminy Zgorzelec i Osiecznica” planowane jest do realizacji zawarcie służebności przesyłu z prywatnymi właścicielami, wykonanie dokumentacji projektowej oraz robót budowlanych obejmujących 3 zadania: Zadanie 1 - Modernizacja sieci SN na terenie gminy Zgorzelec - L-500 Modernizacja linii napowietrznej 20kV L-500 oraz budowa nowych powiązań sieciowych pomiędzy GPZ R-301 Zgorzelec (do którego przyłączone są farmy wiatrowe „Zgorzelec” i „Jędrzychowice”), a siecią SN powiązaną z GPZ Pieńsk. W ramach Zadania 1 powstanie: 1,2 km nowowybudowanej sieci elektroenergetycznej SN dla OZE, 3,1 km zmodernizowanej sieci elektroenergetycznej SN dla OZE. Zadanie 2 - Modernizacja sieci nN w miejscowości Żarska Wieś Modernizacja obwodów nN zasilanych ze stacji PT-70608, PT-70609, PT-70606 na terenie miejscowości Żarska Wieś. Obecnie na sieci nN zabudowane są przewody nieizolowane, podatne na oddziaływanie czynników zewnętrznych (drzewa, warunki pogodowe). Ze względu na planowaną wymianę przewodów na izolowane, konieczna będzie wymiana słupów na nowe, dostosowane do zmienionych naprężeń mechanicznych. Dokonany zostanie również wykup działki pod projektowaną stację kontenerową. W ramach Zadania 2 powstanie: • 0,1 km nowowybudowanej sieci elektroenergetycznej SN dla OZE, • 1,2 km nowowybudowanej sieci elektroenergetycznej nN dla OZE, • 8,7 km zmodernizowanej sieci elektroenergetycznej nN dla OZE. Zadanie 3 - Budowa i modernizacja sieci SN i nN w miejscowości Ławszowa - L-538 Zakres prac obejmuje: budowę linii kablowej SN 20kV typu 3x XRUHAKXS 1x120 pomiędzy słupem nr 89/L-538 a PT-53901, budowę linii kablowej SN 20kV typu 3x XRUHAKXS 1x120 pomiędzy PT-53901 a R-318, budowę kontenerowej stacji transformatorowej 20/0,4kV PT-53901, wykonanie powiązań 20kV i 0,4kV do projektowanej s (Polish)
    0 references
    Subject of the project Under the project “Construction and modernisation of the electricity grid with voltage of SN and nN, enabling connection of electricity generation units from RES in the municipality of Zgorzelec and Osiecznica” it is planned to complete the serviceability of the transmission with private owners, execution of design documentation and construction works covering 3 tasks: Task 1 – Modernisation of SN network in Zgorzelec commune – L-500 Modernisation of overhead line 20 kV L-500 and construction of new network links between GPZ R-301 Zgorzelec (to which the wind farms “Zgorzelec” and “Jędrzychowice”) and SN network connected with GPZ Pieńsk are connected. As part of Task 1, the following will be created: 1.2 km of newly built SN electricity grid for RES, 3.1 km of modernised SN power grid for RES. Task 2 – Modernisation of nN network in Żarska Village Modernisation of nN circuits powered by PT-70608, PT-70609, PT-70606 stations in Żarska Wieś. Currently, non-insulated cables are built on nN networks, susceptible to external factors (trees, weather conditions). Due to the planned replacement of the cables for insulated wires, it will be necessary to replace the poles with new, adapted to the altered mechanical stresses. There will also be a purchase of the plot for the designed container station. As part of Task 2, the following will be created: • 0.1 km of newly built SN electricity grid for RES, • 1.2 km of newly built nN electricity grid for RES, • 8.7 km of upgraded power grid nN for RES. Task 3 – Construction and modernisation of SN and NN networks in Ławszowa – L-538 The scope of work includes: construction of cable line SN 20 kV type 3x XRUHAKXS 1x120 between column 89/L-538 and PT-53901, construction of cable line SN 20 kV type 3x XRUHAKXS 1x120 between PT-53901 and R-318, construction of container transformer station 20/0,4 kV PT-53901, construction of connections 20 kV and 0.4 kV to the design s (English)
    15 October 2020
    0 references

    Identifiers

    RPDS.03.01.00-02-0118/16
    0 references