Improving the quality of medical services through the adaptation of the SP Hospital Building SP ZOZ MSWiA in Opole, for the diagnosis and treatment of musculoskeletal diseases and gynaecology (Q86637)

From EU Knowledge Graph
Revision as of 17:04, 14 October 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The planned investment includes: — reconstruction and overbuilding of the fifth floor of the Hospital building for the operational block, – purchase of equipment, medical equipment and equipment of the operating unit, – reconstruction of branches: general surgery, trauma-orthopaedic surgery and gynecology – purchase of medical devices and equipment for branches as part of the replacement of outdated hardware infrastructure., translated_summary)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Improving the quality of medical services through the adaptation of the SP Hospital Building SP ZOZ MSWiA in Opole, for the diagnosis and treatment of musculoskeletal diseases and gynaecology
Project in Poland financed by DG Regio

    Statements

    0 references
    0 references
    16,766,911.81 zloty
    0 references
    4,024,058.83 Euro
    13 January 2020
    0 references
    19,725,778.61 zloty
    0 references
    4,734,186.87 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 January 2014
    0 references
    30 April 2019
    0 references
    SAMODZIELNY PUBLICZNY ZAKŁAD OPIEKI ZDROWOTNEJ MINISTERSTWA SPRAW WEWNĘTRZNYCH I ADMINISTRACJI W OPOLU
    0 references
    0 references

    50°40'43.7"N, 17°55'47.6"E
    0 references
    Zaplanowana do realizacji inwestycja obejmuje swoim zakresem: - przebudowę i nadbudowę V piętra budynku Szpitala z przeznaczeniem na blok operacyjny, - zakup aparatury, sprzętu medycznego i wyposażenia bloku operacyjnego, - przebudowę oddziałów: chirurgii ogólnej, chirurgii urazowo-ortopedycznej i ginekologii, - zakup wyrobów medycznych oraz wyposażenia na oddziały w ramach wymiany przestarzałej infrastruktury sprzętowej. (Polish)
    0 references
    The planned investment includes: — reconstruction and overbuilding of the fifth floor of the Hospital building for the operational block, – purchase of equipment, medical equipment and equipment of the operating unit, – reconstruction of branches: general surgery, trauma-orthopaedic surgery and gynecology – purchase of medical devices and equipment for branches as part of the replacement of outdated hardware infrastructure. (English)
    14 October 2020
    0 references

    Identifiers

    POIS.09.02.00-00-0071/17
    0 references