No label defined (Q85482)

From EU Knowledge Graph
Revision as of 16:44, 14 October 2020 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in 1 language: remove_english_label)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
No label defined
Project in Poland financed by DG Regio

    Statements

    0 references
    1,299,623.8 zloty
    0 references
    311,909.71 Euro
    13 January 2020
    0 references
    1,528,969.18 zloty
    0 references
    366,952.6 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    14 April 2015
    0 references
    31 July 2017
    0 references
    GMINA BARCIN
    0 references
    0 references
    0 references

    52°51'47.5"N, 17°56'49.9"E
    0 references
    Przedsięwzięcie "Budowa sieci kanalizacji sanitarnej w mieście Barcin przy ul. Akacjowej oraz w miejscowościach Wolice i Barcin Wieś" zlokalizowane jest na obszarze Gminy Barcin, położonej w województwie kujawsko-pomorskim.Obszar Gminy Barcin, zgodnie z Uchwałą Sejmiku Województwa Kujawsko-Pomorskiego: IX/166/15 z dnia 22.06.2015 r. wchodzi w skład aglomeracji Barcin. Na podstawie istniejących niedoborów określono, iż w zakres inwestycji wchodzić będą następujące zadania: a) Budowa sieci kanalizacji sanitarnej w Barcinie przy ul. Akacjowej o łącznej długości 672 m. b) Budowa kanalizacji sanitarnej w Wolicach o łącznej długości 2324 m. c) Budowa sieci kanalizacji sanitarnej w Barcinie Wsi o łącznej długości 987 m. Łącznie w ramach projektu zostanie wybudowana sieć kanalizacji sanitarnej o długości 3,98 km, do której podłączonych zostanie 201 mieszkańców. Ścieki z nowo wybudowanej sieci kanalizacyjnej będą odprowadzane do oczyszczalni ścieków w Sadłogoszczy, która spełnia wymagania dotyczące dyrektywy 91/271/EWG z dnia 21.05.1991 r. w sprawie oczyszczania ścieków komunalnych. Wszystkie odcinki sieci kanalizacyjnej planowane do wybudowania w ramach projektu znajdują się w granicach Aglomeracji Barcin. Oprócz prac budowlanych zakres projektu obejmuje: - opracowanie studium wykonalności, - opracowanie dokumentacji projektowej, - opłaty za przyłączenie do sieci elektroenergetycznej, opłaty za umieszczenie w pasie drogowym urządzeń infrastruktury technicznej nie związanej z potrzebami zarządzania drogami lub potrzebami ruchu drogowego, - nadzór autorski, - działania informacyjno-promocyjne, - rezerwę na nieprzewidziane wydatki. Całkowita wartość inwestycji wyniesie 3 705 352,80 zł, w tym koszty kwalifikowane: 3 012 519,35 zł. Wszystkie koszty poza podatkiem VAT zostały zaliczone do kosztów kwalifikowanych. (Polish)
    0 references
    Project "Construction of sanitary sewage system in the town of Barcin on ul. Akacjowa and in the villages of Wolice and Barcin Wieś" is located in the municipality of Barcin, located in Kujawsko-Pomorskie voivodship.Barcin Municipality Area, in accordance with the Resolution of the Sejm of the Kujawsko-Pomorskie Voivodship: IX/166/15 of 22.06.2015 is part of the agglomeration of Barcin. On the basis of the existing shortfalls, it has been established that the following tasks will be included in the investment: a) Construction of a sanitary sewerage network in Barcin on ul. Acacia with a total length of 672 m. b) Construction of sanitary sewage system in Wolice with a total length of 2324 m. c) Construction of sanitary sewage system in Barcin Village with a total length of 987 m. In total, a sanitary sewer system with a length of 3.98 km will be built, to which 201 inhabitants will be connected. Sewage from the newly built sewage network will be discharged to a sewage treatment plant in Sadłogosz, which complies with the requirements of Directive 91/271/EEC of 21.05.1991 on urban waste water treatment. All sections of the sewage network planned to be built within the project are within the boundaries of the Barcin Agglomeration. In addition to the construction work, the scope of the project includes: — development of feasibility study, – preparation of project documentation, – charges for connection to the power grid, fees for placing technical infrastructure equipment not related to road management or traffic needs in the road lane, – copyright supervision, – information and promotion activities, – reserve for unforeseen expenditure. The total value of the investment will amount to PLN 3 705 352.80, including eligible costs: 3 012 519,35 PLN. All costs except VAT are included in the eligible costs. (English)
    14 October 2020
    0 references

    Identifiers

    POIS.02.03.00-00-0253/16
    0 references