Increase the availability to the Historical Archand Archaeological Museum in Ostrowiec Świętokrzyski by improving the infrastructure of the Archaeological Museum and of the Universe Krzemionki and the Wielkie Palace (Q86185)
Jump to navigation
Jump to search
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Increase the availability to the Historical Archand Archaeological Museum in Ostrowiec Świętokrzyski by improving the infrastructure of the Archaeological Museum and of the Universe Krzemionki and the Wielkie Palace |
Project in Poland financed by DG Regio |
Statements
7,654,733.25 zloty
0 references
9,005,568.53 zloty
0 references
85.0 percent
0 references
1 January 2017
0 references
30 June 2020
0 references
MUZEUM HISTORYCZNO-ARCHEOLOGICZNE W OSTROWCU ŚWIĘTOKRZYSKIM
0 references
Zakres przedsięwzięcia obejmie wykonanie robót budowlanych, elektrycznych oraz wykonanie wystaw. Roboty budowlane obejmą między innymi: W Pałacu Wielopolskich: - remont dachu i schodów przy wejściach do budynku, prace renowacyjne ścian zewnętrznych i wewnętrzne, prace instalacyjno-montażowe instalacji centralnego ogrzewania i wodno-kanalizacyjnej, instalacji elektrycznych i alarmowej, montaż nowych elementów świetlnych, alarmowych i osprzętu - roboty budowlane przy fundamentach (osuszanie fundamentów i murów, wykonanie izolacji przeciwwilgociowej, ocieplenie fundamentów). - remont z uzupełnieniem części podłóg drewnianych. - wykonanie wentylacji mechanicznej. W Parku przy Pałacu Wielopolskich: - zagospodarowanie parku (mała architektura), konserwacja istniejącego drzewostanu, usunięcie nasadzonych drzew niewpisujących się w styl charakterystyczny dla parku wraz z nasadzeniem nowych drzew, wykonanie placu przed tarasem muzeum. - wykonanie ekspozycji "in situ" dymarek odkrytych w parku pałacowym. Szacowana wartość robót związanych z Pałacem Wielkopolskich i parkiem przy Pałacu wynosi 2 973 808,34 zł netto. W Rezerwacie Krzemionki: - roboty budowlane i budowlano-montażowe (Przebudowa "Domku Archeologa", Rozbiórka budynków: administracyjnego, magazynu zbiorów, magazynowego, domku campingowego; digitalizacja podziemnej trasy turystycznej metodą skaningu, z możliwością jej wykorzystania podczas przygotowań do prac zabezpieczających, konserwacyjnych, sporządzania dokumentacji konserwatorskiej i górniczej; - roboty w zakresie poprawy bezpieczeństwa obiektów poprzez wykonanie zabezpieczeń alarmów, monitoringu, światłowodu i klimatyzacji w obiektach Muzeum i Rezerwatu; - przebudowa dwóch budynków nad szybami kopalnianymi (Zenon, Stefan) - wymiana konstrukcji, pokrycia dachowego, malowanie, izolacja przeciwwilgociowa; Przebudowa klatki schodowej wraz ze śluzą w szybie Zenon oraz śluzy i pokrywy klatki schodowej w szybie Stefan; inne zadania. (Polish)
0 references
The scope of the project will include the execution of construction works, electrical works and the execution of exhibitions. Construction works shall include, inter alia: In the Wielopolski Palace: — renovation of the roof and staircases at the entrances of the building, renovation works of external and internal walls, installation and installation of central heating and water and sewage systems, electrical and alarm systems, installation of new light elements, alarm and fittings – construction works at the foundations (drying of foundations and walls, construction of damp insulation, insulation of foundations). — refurbishment with the addition of parts of wooden floors. — mechanical ventilation. In the Park near the Wielopolski Palace: — development of the park (small architecture), maintenance of existing stands, removal of planted trees that do not fit into the style characteristic of the park along with planting new trees, making a square in front of the museum terrace. — exposition “in situ” of smokers discovered in the palace park. The estimated value of works related to the Wielkopolska Palace and the park at the Palace is PLN 2 973 808.34 net. In the Silicon Reserve: — construction and assembly works (Reconstruction of “House of Archaeologists”, demolition of buildings: administrative, harvest, warehouse, camping house; digitisation of the underground tourist route by scanning method, with its possibility to be used in preparation for security, maintenance, conservation and mining documentation; — works in the field of improving the safety of facilities through security of alarms, monitoring, fibre optic and air conditioning in the premises of the Museum and the Reserve; — reconstruction of two buildings above mine shafts (Zenon, Stefan) – replacement of structures, roofing, painting, damp insulation; Reconstruction of the stairway with the lock in the Zenon shaft and the lock and cover of the staircase in the Stefan shaft; other assignments. (English)
14 October 2020
0 references
Identifiers
POIS.08.01.00-00-0060/17
0 references