No label defined (Q85402)

From EU Knowledge Graph
Revision as of 15:58, 14 October 2020 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in 1 language: remove_english_label)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
No label defined
Project in Poland financed by DG Regio

    Statements

    0 references
    0 references
    3,521,463.41 zloty
    0 references
    845,151.22 Euro
    13 January 2020
    0 references
    4,142,898.13 zloty
    0 references
    994,295.55 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 January 2014
    0 references
    31 March 2019
    0 references
    PRZEDSIĘBIORSTWO USŁUG KOMUNALNYCH SP. Z O.O.
    0 references
    0 references
    0 references

    51°58'53.8"N, 22°47'12.1"E
    0 references
    Projekt swoim zakresem, pod względem technicznym, obejmuje: 1. Budowę sieci wodociągowej, 2. Budowę sieci kanalizacji sanitarnej, 3. Budowę 8 przepompowni ścieków, 4. Wykonanie instalacji fotowoltaicznej o mocy 20 kW na budynku SUW oraz instalacji fotowoltaicznej o mocy 12 kW na budynku Oczyszczalni Ścieków, 5. Zakup wyposażenia niezbędnego do zapewnienia prawidłowego funkcjonowania s. wodociągowej i kan. sanitarnej realizowanej w ramach projektu (zapobieganie awariom, wyciekom, stratom wody, infiltracji ścieków i in.), jak: a) korelatora do lokalizacji wycieków w sieci wodociągowej, b) specjalistycznego pojazdu do czyszczenia kanałów sanitarnych, c) samochodu specjalistycznego do eksploatacji sieci kanalizacji sanitarnej, d) kamery inspekcyjnej do sieci kanalizacji sanitarnej przeznaczonej do kontroli stanu rur. (Polish)
    0 references
    The project’s technical scope includes: 1. Construction of a water supply network, 2. Construction of sanitary sewage system, 3. Construction of 8 sewage pumping stations, 4. 20 kW photovoltaic installation on the SUW building and 12 kW photovoltaic installation on sewage treatment plant, 5. Purchase of equipment necessary to ensure the proper functioning of the water supply and sanitary canal carried out within the framework of the project (prevention of accidents, leakage, water loss, infiltration of sewage, etc.), as follows: a) a correlator for the location of leakages in the water supply network, (b) a specialised sanitary vehicle, (c) a specialised car for the operation of a sanitary sewer system, d) an inspection camera for a sanitary sewerage system designed to control the state of the pipes. (English)
    14 October 2020
    0 references

    Identifiers

    POIS.02.03.00-00-0151/16
    0 references