Modernisation of the Kaźmierz – Jerzmanowa gas pipeline and the construction of a gas distribution network in areas not yet listed in Jerzmanowa (Q86124)

From EU Knowledge Graph
Revision as of 15:33, 14 October 2020 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in 1 language: translated_label)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Modernisation of the Kaźmierz – Jerzmanowa gas pipeline and the construction of a gas distribution network in areas not yet listed in Jerzmanowa
Project in Poland financed by DG Regio

    Statements

    0 references
    2,413,548.91 zloty
    0 references
    579,251.74 Euro
    13 January 2020
    0 references
    3,000,000.0 zloty
    0 references
    720,000.0 Euro
    13 January 2020
    0 references
    80.45 percent
    0 references
    1 March 2018
    0 references
    28 February 2020
    0 references
    EWE ENERGIA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
    0 references
    0 references

    51°35'41.3"N, 16°2'38.0"E
    0 references

    51°30'14.0"N, 16°4'16.7"E
    0 references
    Celem projektu jest budowa inteligentnej sieci gazowej średniego ciśnienia na terenach niezgazyfikowanych w gminie Jerzmanowa i Polkowice oraz zwiększenie wolumenu dystrybucji gazu ziemnego (ok. 5 800 MWh rocznie). Sieć gazowa ś/c będzie sprzyjała rozwojowi odnawialnych źródeł energii poprzez możliwość przyłączenia do niej biogazu. Inwestycja podzielona na 6 odcinków budowy nowej sieci gazowej oraz 1 odcinek modernizacji istniejącej sieci: Odcinek 1: Modła - Łagoszów Mały: Odcinek 2: Jerzmanowa - Maniów - Łagoszów Mały; Odcinek 3: Modła - Kurowice; Odcinek 4 : Gaiki, Potoczek, Bądzów; Odcinek 5 : Łagoszów - Mały; Odcinek 6 : Kaźmierzów, ul. Główna; Odcinek 7 (Modernizacja): Kaźmierzów - Jerzmanowa (Polish)
    0 references
    The aim of the project is to build an intelligent gas network of medium pressure in areas not related to Jerzmanowa and Polkowice and increase the volume of natural gas distribution (approx. 5800 MWh per year). The gas network will foster the development of renewable energy sources through the possibility of connecting biogas to it. The investment is divided into 6 sections of the construction of a new gas network and 1 phase of modernisation of the existing network: Episode 1: Prayer – Lagoszów Little: Episode 2: Jerzmanowa – Maniów – Lagoszów Little; Episode 3: Prayer – Kurowice; Episode 4: Gaiki, the creek, the Be; Episode 5: Lagoszów – Little; Episode 6: Kaźmierzów, ul. The main; Section 7 (Modernisation): Kaźmierzów – Jerzmanova (English)
    14 October 2020
    0 references

    Identifiers

    POIS.07.01.00-00-0010/17
    0 references