Project in Poland financed by DG Regio
Language Label Description Also known as
English
No label defined
Project in Poland financed by DG Regio

    Statements

    0 references
    3,063,671.1 zloty
    0 references
    735,281.06 Euro
    13 January 2020
    0 references
    4,084,894.81 zloty
    0 references
    980,374.75 Euro
    13 January 2020
    0 references
    75.0 percent
    0 references
    1 August 2018
    0 references
    31 December 2020
    0 references
    SPÓŁDZIELNIA MIESZKANIOWA "POLNE" W LUBINIE
    0 references
    0 references
    0 references
    W ramach projektu będą wykonywane prace termomodernizacyjne w niżej wymienionych budynkach: Budynek położony przy ul. Topolowej 52 posiada 12 kondygnacji. W obiekcie znajduje się 55 lokali mieszkalnych, w których mieszka 110 osób. Budynek położony przy ul. Topolowej 24-42 posiada 5 kondygnacji. W obiekcie znajduje się 100 lokali mieszkalnych, w których mieszka 231 osób. Budynek położony przy ul. Leszczynowej 2-10 posiada 12 kondygnacji. W obiekcie znajduje się 159 lokali mieszkalnych, w których mieszka 327 osób. Przedmiotowy zakres projektu obejmuje: Prace termomodernizacyjne (koszt kwalifikowalny), Promocja projektu (koszt niekwalifikowalny). „W związku z tym przeprowadzony audyt wskazał, iż należy przeprowadzić prace polegające na: 1) Topolowa 52 - dociepleniu ścian zewnętrznych budynków; - dociepleniu ścian zewnętrznych klatki schodowej; - dociepleniu stropodachów; - dociepleniu przegród zewnętrznych w piwnicach - modernizacja co - modernizacja cwu Łączny koszt zgodnie z audytem : 661 040,00 zł 2) Topolowa 24-42 - dociepleniu ścian szczytowych; - dociepleniu ścian osłonowych - dociepleniu ścian zewnętrznych klatki schodowej; - dociepleniu ścian zewnętrznych ( wnęki balkonowe ) - dociepleniu przegród zewnętrznych w piwnicach - dociepleniu stropodachu - wymiana okien piwnicznych - modernizacja co - modernizacja cwu Łączny koszt zgodnie z audytem : 1378506,00 zł 3) Leszczy 2-10 - dociepleniu ścian szczytowych; - dociepleniu ścian osłonowych - dociepleniu ścian zewnętrznych klatki schodowej; - dociepleniu przegród w piwnicy - dociepleniu stropodachu - wymiana okien piwnicznych - wymiana okien klatek schodowych - modernizacja co - modernizacja cwu Łączny koszt zgodnie z audytem : 1971078,00 zł Łączny koszt robót : 4010624,00 zł. (Polish)
    0 references
    As part of the project, thermal modernisation works will be carried out in the following buildings: The building is located on the street. Topolowa 52 has 12 floors. There are 55 residential units in which 110 people live. The building is located on the street. Topolowa 24-42 has 5 floors. There are 100 residential units in which 231 people live. The building is located on the street. The 2-10 hazel has 12 floors. There are 159 residential units in which 327 people live. The scope of the project includes: Thermal modernisation works (eligible cost), Project promotion (ineligible cost). “In this respect, the audit carried out indicated that work should be carried out to: 1) Topova 52 – insulation of the exterior walls of buildings; — insulation of the outer walls of the stairway; — warming of stropodache; — insulation of external partitions in cellars – modernisation what – modernisation of customs Total cost according to audit: 661 040,00 zł 2) Topolowa 24-42 – warming of the peak walls; — insulation of the curtain walls – insulation of the outer walls of the stairway; — insulation of external walls (balconal recess) – insulation of outer partitions in cellars – heat insulation of ceilings – replacement of cellar windows – modernisation of what – modernisation of cwu Total cost according to audit: 1378506,00 PLN 3) Bream 2-10 – warming of the peak walls; — insulation of the curtain walls – insulation of the outer walls of the stairway; — warming of partitions in the basement – insulation of ceilings – replacement of cellar windows – replacement of staircase windows – modernisation what – modernisation of the climax Total cost according to the audit: PLN 1971078,00 Total cost of works: 4010624,00 zlotys. (English)
    14 October 2020
    0 references

    Identifiers

    POIS.01.03.02-00-0034/17
    0 references