No label defined (Q84737)

From EU Knowledge Graph
Revision as of 15:19, 14 October 2020 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in 1 language: remove_english_label)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
No label defined
Project in Poland financed by DG Regio

    Statements

    0 references
    1,911,305.64 zloty
    0 references
    458,713.35 Euro
    13 January 2020
    0 references
    2,548,407.52 zloty
    0 references
    611,617.8 Euro
    13 January 2020
    0 references
    75.0 percent
    0 references
    1 July 2019
    0 references
    31 December 2021
    0 references
    SPÓŁDZIELNIA MIESZKANIOWA OPOLE
    0 references
    0 references
    0 references
    Projekt nakierowany jest na poprawę efektywności energetycznej budynku mieszkalnego, należącego do zasobu Spółdzielni Mieszkaniowej w Opolu. Obecnie w obiekcie stwierdza się zawyżone zużycie energii na potrzeby ogrzewania wskutek zastosowania systemu dociepleń odbiegających od obecnych standardów. Ponadto, około 1/3 okien i drzwi balkonowych w budynku nie została wymieniona na plastikowe, użytkowane są również stalowe rury centralnego ogrzewania oraz żeliwne i stalowe grzejniki z częściowo niesprawnymi zaworami termostatycznymi (wymagające wymiany). Projekt przyczyni się do zagwarantowania właściwych i komfortowych warunków życia w modernizowanym obiekcie. Osiągnięcie celu możliwe będzie dzięki wdrożeniu działań w zakresie głębokiej, kompleksowej modernizacji energetycznej budynku wielorodzinnego Dom Złotej Jesieni, zlokalizowanego przy ulicy Majora „Hubala” 4 w Opolu. Budynek znajduje się na obszarze miasta Opola – wchodzącego w skład obszaru Aglomeracji Opolskiej, wskazanego w Strategii ZIT Aglomeracji Opolskiej (dokument przyjęty Uchwałą nr W/10/2016 Walnego Zgromadzenia Członków Stowarzyszenia Aglomeracja Opolska z dn. 18 listopada 2016 r.). Do wniosku załączono mapę z lokalizacją projektu. Zakres prac obejmuje elementy spójne z działaniami ujętymi w SzOOP dla poddziałania 1.3.2, tj: - Ocieplenie ścian zewnętrznych metodą bezstykową z wykorzystaniem styropianu o grubości 14 cm na powierzchni 4500,41 m2 po uprzednim demontażu, transporcie i utylizacji istniejącego ocieplenia i płyt azbestowo-cementowych wraz z niezbędnymi robotami towarzyszącymi, w tym wzmocnieniem poszczególnych warstw ścian zewnętrznych kotwami wklejanymi. - Ocieplenie stropodachu wentylowanego 15 cm warstwą granulatu wełny mineralnej - 2206,71 m2 - Ocieplenie stropu nad piwnicami niskimi od spodu 10 cm metodą wyłożenia twardej wełny mineralnej lub metodą natryskową materiałem termoizolacyjnym - 996 m2. - wymiana okien na okna plastikowe o współczynniku przenikania ciepła U = 1,1 W/m2K - 201 sz (Polish)
    0 references
    The project is aimed at improving the energy efficiency of a residential building belonging to the Housing Cooperative in Opole. Currently, the facility has seen an over-consumption of energy consumption for heating due to the use of a warming system that deviates from current standards. In addition, about 1/3 of the windows and balcony doors in the building have not been converted into plastic, steel central heating pipes and iron and steel radiators with partially malfunctioning thermostatic valves (requiring replacement) are also used. The project will contribute to guaranteeing proper and comfortable living conditions in a modernised facility. The goal will be achieved by implementing activities in the field of deep, comprehensive energy modernisation of the multi-family building of the Golden Autumn House, located at Majora “Hubala” 4 in Opole. The building is located in the city of Opole – part of the area of the Opole Agglomeration, indicated in the ZIT Strategy of the Opole Agglomeration (document adopted by Resolution no. W/10/2016 of the General Assembly of the Association of Opolska Agglomeration. 18 November 2016). The application is accompanied by a map with the location of the project. The scope of work shall include elements consistent with the activities included in the Shoop for sub-measure 1.3.2, i.e.: — Contactless insulation of external walls using 14 cm thick styrofoam on a surface of 4500.41 m² after prior dismantling, transport and disposal of existing warming and asbestos-cement panels together with necessary accompanying works, including reinforcement of individual layers of external walls with pasted anchors. — Warming of ventilated stropod 15 cm with a layer of mineral wool granules – 2206.71 m² – Warming of the ceiling over the cellars low from the bottom of 10 cm by means of hard mineral wool lining or spraying method with insulation material – 996 m². — replacement of windows for plastic windows with heat transfer coefficient U = 1,1 W/m2K – 201 h (English)
    14 October 2020
    0 references

    Identifiers

    POIS.01.03.02-00-0024/17
    0 references