Supporting energy efficiency in buildings of the Pomeranian Medical University in Szczecin (Q84641)

From EU Knowledge Graph
Revision as of 15:09, 14 October 2020 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in 1 language: translated_label)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Supporting energy efficiency in buildings of the Pomeranian Medical University in Szczecin
Project in Poland financed by DG Regio

    Statements

    0 references
    3,098,777.0 zloty
    0 references
    743,706.48 Euro
    13 January 2020
    0 references
    3,645,620.02 zloty
    0 references
    874,948.8 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    23 March 2016
    0 references
    30 June 2019
    0 references
    POMORSKI UNIWERSYTET MEDYCZNY W SZCZECINIE
    0 references
    0 references
    PRZEDMIOTEM PROJEKTU jest termomodernizacja trzech obiektów użyteczności publicznej, należących do Pomorskiego Uniwersytetu Medycznego w Szczecinie (PUM). Projekt będzie realizowany w na terenie miasta Szczecina, w trzech lokalizacjach: 1.hala sportowa PUM - przy ul. Xawerego Dunikowskiego nr 6A, działka nr 2/1, obręb ew. 1054, Śródmieście 54, 2.budynek Zakładu Fizyki Medycznej, studium Języków Obcych PUM (dalej Zakład) – przy ul. Ku Słońcu 12-13, działka nr 9/5, obręb ew. 2155, Pogodno 155, 3.budynek dydaktyczny PUM (dalej: b. dydaktyczny), w kompleksie szpitalnym – przy Al. Powstańców Wielkopolskich 72; działka nr 36, obręb ew. 1057, Śródmieście 57. ZAKRES PRAC: 1.HALA SPORTOWA PUM (budynek przy ul. ul. X.Dunikowskiego 6A; w 0,17% wykorzystywany pod działalność gospodarczą). - roboty dociepleniowe (docieplenie ścian i stropodachu) - stolarka okienna i drzwiowa (wymiana okien i drzwi) - wymiana instalacji c.o. i c.w.u. - modernizacja węzła cieplnego - montaż ogniw fotowoltaicznych o mocy o,02 MW - modernizacja systemu wentylacji (wentylacja mechaniczna N-W z odzyskiem ciepła) - wymiana pomp obiegowych, cyrkulacji - wymiana źródeł światła na energooszczędne - wymiana opraw oświetleniowych. 2.ZAKŁAD PUM (budynek przy ul. ul. Ku Słońcu 12-13, w 11,95 % wykorzystywany pod działalność gospodarczą). - roboty dociepleniowe (docieplenie ścian i stropodachu) - stolarka drzwiowa (wymiana drzwi zewnętrznych) - wymiana instalacji c.o. i c.w.u. - wymiana pomp - wymiana źródeł światła na energooszczędne - wymiana opraw oświetleniowych 3. B.DYDAKTYCZNY PUM (budynek przy Al. Powstańców Wielkopolskich; w 14,64 % wykorzystywany pod działalność gospodarczą).: - roboty dociepleniowe (docieplenie ścian i stropodachu ) - stolarka okienna i drzwiowa (wymiana okien i drzwi) - modernizacja instalacji c.o. i c.w.u. - modernizacja systemu wentylacji (wymiana układu wentylacji sali wykładowej) - wymiana pomp - wymiana źródeł światła na energooszczędne - wymiana opraw oświetleniowych. KOSZTY 1 (Polish)
    0 references
    The subject of the project is the thermal modernisation of three public utility facilities, belonging to the Pomeranian Medical University in Szczecin (PUM). The project will be implemented in the city of Szczecin, in three locations: 1.Sport hall PUM – at ul. Xawerego Dunikowskiego nr 6A, plot no. 2/1, area of 1054, Śródmieście 54, 2nd building of the Department of Medical Physics, Study of Foreign Languages PUM (hereinafter the Department) – at ul. Ku Słoniec 12-13, plot No 9/5, periphery of 2155, Pogodno 155, 3. didactic building PUM (hereinafter: B. didactic), in the hospital complex – at Al. Insurgents of Wielkopolska 72; plot No. 36, circumference, 1057, Śródmieście 57. SCOPE OF WORK: 1.PUM SPORT HALL (building on ul. ul. X.Dunikowski 6A; 0.17 % used for economic activity). — warming works (warming of walls and ceilings) – window and door carpentry (exchange of windows and doors) – replacement of central heating and hot water installations – modernisation of heat node – installation of photovoltaic cells with power of,02 MW – modernisation of the ventilation system (mechanical ventilation with heat recovery) – exchange of circulating pumps, circulation – exchange of light sources for energies 2.KLEAD PUM (building on ul. ul. Ku Słoniec 12-13, 11.95 % used for economic activity). — warming works (warming of walls and ceilings) – door carpentry (exchange of external doors) – replacement of central heating and hot water systems – replacement of pumps – replacement of light sources for energy efficient – replacement of luminaires 3. B.Didactic PUM (building on Al. The Wielkopolska insurgents; 14.64 % used for economic activity). — warming works (warming of walls and ceilings) – window and door carpentry (exchange of windows and doors) – modernisation of central heating and hot water installations – modernisation of the ventilation system (exchange of the ventilation system of the lecture hall) – replacement of pumps – exchange of light sources for energy efficient – replacement of lighting fittings. COSTS 1 (English)
    14 October 2020
    0 references

    Identifiers

    POIS.01.03.01-00-0122/16
    0 references