Reconstruction of the North and South II grid in Tychy (Q85010)

From EU Knowledge Graph
Revision as of 14:51, 14 October 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): the project consists of the conversion of channel heating networks with degraded thermal insulation and corrosion by heating pipes into a sewerless district heating network from modern pre-insulated pipes., translated_summary)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Reconstruction of the North and South II grid in Tychy
Project in Poland financed by DG Regio

    Statements

    0 references
    1,270,000.0 zloty
    0 references
    304,800.0 Euro
    13 January 2020
    0 references
    4,221,170.5 zloty
    0 references
    1,013,080.92 Euro
    13 January 2020
    0 references
    30.09 percent
    0 references
    30 September 2016
    0 references
    28 February 2019
    0 references
    PRZEDSIĘBIORSTWO ENERGETYKI CIEPLNEJ SP. Z O.O.
    0 references
    0 references
    0 references
    projekt polega na przebudowie kanałowych sieci ciepłowniczych ze zdegradowana izolacją termiczną i naruszonymi przez korozję rurami ciepłowniczymi na bezkanałową sieć ciepłowniczą z nowoczesnych rur preizolowanych. (Polish)
    0 references
    the project consists of the conversion of channel heating networks with degraded thermal insulation and corrosion by heating pipes into a sewerless district heating network from modern pre-insulated pipes. (English)
    14 October 2020
    0 references

    Identifiers

    POIS.01.07.02-00-0005/16
    0 references