Development of an innovative system of management of lighting infrastructure on the network managed by PLK S.A.& (Q83916)

From EU Knowledge Graph
Revision as of 14:25, 14 October 2020 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in 1 language: translated_label)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Development of an innovative system of management of lighting infrastructure on the network managed by PLK S.A.&
Project in Poland financed by DG Regio

    Statements

    0 references
    2,878,174.85 zloty
    0 references
    690,761.96 Euro
    13 January 2020
    0 references
    8,294,082.5 zloty
    0 references
    1,990,579.80 Euro
    13 January 2020
    0 references
    34.7 percent
    0 references
    1 July 2018
    0 references
    31 March 2022
    0 references
    INSTYTUT KOLEJNICTWA
    0 references
    Celem projektu jest opracowanie systemu zarządzania, sterowania i monitorowania oświetlenia terenów kolejowych w skali obszaru działa Spółki PKP PLK S.A. Ideą projektu jest wykorzystanie nowoczesnych opraw LED wyposażonych w cyfrowe złącza sterowania. Opracowana zostanie metoda dynamicznego sterowania intensywnością świecenia opraw, uwzględniająca rzeczywisty ruch pociągów na stacji oraz obecność ludzi na peronach. Projekt zakłada zbudowanie systemu informatycznego, rozsyłającego do obiektów terenowych informacje o planie ściemniania oświetlenia na najbliższy okres (rzędu 1-2 godzin). Sterowniki oświetleniowe na obiektach użyją informacji do sterowania oprawami. Przy braku takiej informacji, sterowniki powinny załączać nominalną intensywność świecenia. Drugim czynnikiem włączającym pełne oświetlenie będą sygnały o obecności ludzi. Projekt zakłada osiągnięcie celu poprzez realizację zadań w następujących krokach: 1. Wykonanie inwentaryzacji, zakończonej audytem energetycznym dla 110 tys. opraw - instalacji nie objętych programami modernizacji 2. Opracowanie otwartych standardów budowy systemu sterowania oświetleniem. Standardy będą definiować elementy systemu i ich funkcjonalność, opisywać metody i protokoły wymiany informacji, złącza (interfejsy) urządzeń. Przewiduje się użycie zarówno komunikacji przez okablowanie jak i komunikacji bezprzewodowej, bezpośrednio do trudnodostępnych opraw. W systemie będą używane nowoczesne oprawy wielu producentów, wyposażone w odpowiednie interfejsy. 3. Na bazie standardów zostaną opracowane modele urządzeń - elementów docelowego systemu. Firmy AREX i SILED opracują reprezentatywny zestaw urządzeń, zgodnych ze standardami. 4. Opracowane zostaną projekty wdrożeniowe instalacji oświetleniowych z użyciem modelowych urządzeń, implemen (Polish)
    0 references
    The aim of the project is to develop a system of management, control and monitoring of illumination of railway areas on the scale of the area operates PKP PLK S.A. The idea of the project is to use modern LED luminaires equipped with digital control connectors. A method of dynamic control of the lighting intensity of the luminaires will be developed, taking into account the actual movement of trains at the station and the presence of people on the platforms. The project involves building an IT system, sending information about the dimming plan to the field objects for the next period (of 1-2 hours). Lighting controllers on objects will use information to control the luminaires. In the absence of such information, the controllers should include the nominal intensity of the illumination. The second factor including full lighting will be signals about the presence of people. The project aims to achieve the objective by carrying out the tasks in the following steps: 1. Execution of inventory, completed with an energy audit for 110 thousand luminaires – installations not covered by modernisation programmes 2. Development of open standards for the construction of a lighting control system. Standards will define system elements and their functionality, describe methods and protocols for exchanging information, connectors (interfaces) of devices. It is envisaged to use both communication by wiring and wireless communication directly to hard-to-access luminaires. The system will use modern luminaires of many manufacturers, equipped with appropriate interfaces. 3. On the basis of standards, models of devices – components of the target system will be developed. AREX and SILED will develop a representative set of devices according to standards. 4. Projects will be developed to implement lighting installations using model equipment, implemen (English)
    14 October 2020
    0 references

    Identifiers

    POIR.04.01.01-00-0020/17
    0 references