Development of a new range of 400 kV power poles and their respective foundations, including foundations for use on land with particularly unfavourable geotechnical parameters. (Q78328)
Jump to navigation
Jump to search
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Development of a new range of 400 kV power poles and their respective foundations, including foundations for use on land with particularly unfavourable geotechnical parameters. |
Project in Poland financed by DG Regio |
Statements
6,735,362.5 zloty
0 references
9,594,245.0 zloty
0 references
70.2 percent
0 references
1 April 2018
0 references
31 August 2020
0 references
ENPROM SPÓŁKA Z OGRANICZONA ODPOWIEDZIALNOŚCIĄ
0 references
Numer_referencyjny_programu_pomocowego: SA.41471(2015/X) Przeznaczenie_pomocy_publicznej: art. 25 rozporządzenia KE nr 651/2014 z dnia 17 czerwca 2014 r. uznające niektóre rodzaje pomocy za zgodne z rynkiem wewnętrznym w stosowaniu art. 107 i 108 Traktatu (Dz. Urz. UE L 187/1 z 26.06.2014). Przedmiotem projektu jest zarówno opracowanie innowacyjnych słupów energetycznych tj. konstrukcji wsporczych elektroenergetycznych linii napowietrznych prądu przemiennego o napięciu 400kV, jak i innowacyjnych fundamentów dla tych słupów. W chwili obecnej przygotowywane są inwestycje w obszarze energetyki, związane z rozbudową i remontami sieci przesyłowych. Potrzeby te wynikają zarówno z wzrostu konsumpcji energii, jak i ze zmian klimatu. Przeciwdziałaniu tym zjawiskom ma służyć nowy system normowy przewidujący wyższe wymagania dla stateczności i wytrzymałości elementów sieci. Pojawia się zatem konieczność stworzenia nowych konstrukcji słupów i fundamentów, których parametry techniczne uwzględnią już wszystkie wymagane obecnie aspekty projektowania. W chwili obecnej projektów takich słupów linii 400kV i fundamentów w kraju nie ma i wymagana jest pilna potrzeba wytworzenia tego typu wyrobów. Ponadto, w odpowiedzi na zapotrzebowanie rynku w ramach projektu zajmiemy się zaprojektowaniem fundamentów do zastosowania na szczególnie niekorzystnych gruntach. (Polish)
0 references
Reference number of the aid programme: SA.41471(2015/X) Purpose of public aid: Article 25 of EC Regulation No 651/2014 of 17 June 2014 declaring certain types of aid compatible with the internal market in the application of Articles 107 and 108 of the Treaty (OJ L. I'm sorry. EU L 187/1 of 26.06.2014). The subject of the project is both the development of innovative power poles, i.e. power support structures for overhead AC lines with a voltage of 400 kV, as well as innovative foundations for these columns. Investments in the field of energy are currently being prepared for the expansion and renovation of transmission networks. These needs stem from both the increase in energy consumption and climate change. A new standard system that provides for higher requirements for stability and strength of network elements is intended to counter these phenomena. It is therefore necessary to create new pillars and foundations, whose technical parameters will take into account all the design aspects currently required. At the moment, the designs of such 400 kV posts and foundations in the country do not exist and there is an urgent need to manufacture such products. In addition, in response to market demand within the project, we will design the foundations for use on particularly unfavourable land. (English)
14 October 2020
0 references
Identifiers
POIR.01.01.01-00-0789/17
0 references