No label defined (Q80130)

From EU Knowledge Graph
Revision as of 11:17, 14 October 2020 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in 1 language: remove_english_label)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
No label defined
Project in Poland financed by DG Regio

    Statements

    Q2524466 (Deleted Item)
    0 references
    0 references
    3,205,595.44 zloty
    0 references
    769,342.91 Euro
    13 January 2020
    0 references
    11,237,042.92 zloty
    0 references
    2,696,890.30 Euro
    13 January 2020
    0 references
    28.53 percent
    0 references
    1 January 2017
    0 references
    31 December 2019
    0 references
    VALEO AUTOSYSTEMY SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
    0 references
    0 references

    49°47'27.6"N, 20°22'45.8"E
    0 references
    W ramach projektu Valeo Autosystemy sp. z o.o. (dalej: Spółka, Valeo) zamierza przeprowadzić prace B+R dotyczące opracowania trzech innowacyjnych wymienników ciepła z wykorzystaniem naturalnego czynnika chłodzącego, tj. dwutlenku węgla, wraz z technologią ich wytwarzania na skalę przemysłową. Zastosowanie dwutlenku węgla w miejsce obecnie stosowanych syntetycznych czynników chłodzących (R134a i R1234yf) pozwoli na osiągnięcie znacznie lepszych parametrów użytkowych układów klimatyzacji opartych o opracowane w projekcie wymienniki, w szczególności istotnie lepszego współczynnika wymiany ciepła. Rozwiązania te będą miały przełomowe znaczenie szczególnie dla rozwoju pojazdów elektrycznych i hybrydowych. Jeden z opracowanych wymienników będzie dostosowany do chłodzenia baterii w pojazdach elektrycznych. Projekt obejmie badania przemysłowe i prace rozwojowe. Prace podzielone będą na 4 etapy: Etap 1 (01.01.2017 – 31.08.2017) dotyczyć będzie analizy wykonalności innowacyjnych produktów, w ramach której zostaną zbudowane i przetestowane funkcjonalne modele produktów (mock-up’y) celem potwierdzenia wybranej koncepcji budowy wymienników. Etap 2 (01.09.2017 – 30.06.2018), w którym w oparciu o wybraną koncepcję wymienników zdefiniowane zostaną produkty prototypowe. Etap 3 (01.07.2018 – 30.06.2019) obejmie budowę pierwszych prototypów oraz ich testowanie, a także wprowadzenie ewentualnych poprawek. Etap 4 (01.07.2019 – 31.12.2019), w którym zbudowana zostanie i przetestowana kolejna partia prototypów, a także wytworzone zostaną produkty testowe celem potwierdzenia technologicznej gotowości produktu do komercjalizacji. Efektem prac będzie opracowanie pełnej dokumentacji technicznej właściwych produktów umożliwiającej ich komercjalizację, a następnie wdrożenie do pro (Polish)
    0 references
    As part of the project Valeo Autosystemy sp. z o.o. (hereinafter: The company, Valeo) intends to carry out R & D works on the development of three innovative heat exchangers using a natural cooling agent, i.e. carbon dioxide, together with their manufacturing technology on an industrial scale. The use of carbon dioxide instead of the current synthetic cooling agents (R134a and R1234yf) will achieve significantly better performance of air-conditioning systems based on the design of heat exchangers, in particular a significantly better heat exchange rate. These solutions will be of crucial importance especially for the development of electric and hybrid vehicles. One of the developed exchangers will be adapted to cooling batteries in electric vehicles. The project will cover industrial research and development. The work will be divided into 4 stages: Step 1 (01.01.2017; – 31.08.2017) will concern an analysis of the feasibility of innovative products, which will build and test functional product models (mock-up’y) in order to confirm the chosen concept of the construction of exchangers. Step 2 (01.09.2017; – 30.06.2018) which defines prototype products based on the chosen concept of exchangers. Step 3 (01.07.2018; – 30.06.2019) will include the construction and testing of the first prototypes, as well as possible amendments. Step 4 (01.07.2019; – 31.12.2019), in which a further batch of prototypes will be built and tested, as well as the production of test products to confirm the technological readiness of the product for commercialisation. The work will result in the development of full technical documentation of the relevant products enabling their commercialisation and subsequent implementation to pro (English)
    14 October 2020
    0 references

    Identifiers

    POIR.01.02.00-00-0197/16
    0 references