Creation of an reuse base and diversification of the activities of Emmaüs Défi for a significant impact in the fight against large-scale exclusion.The ERDF support will take place in phase 1 of the work. (Q139588)

From EU Knowledge Graph
Revision as of 12:01, 2 October 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The purpose of this operation is to co-finance Phase 1 of the renovation and rehabilitation of areas not used by Emmaus Défi in its premises located in the heart of the Riquet-stalingrad district. Emmaus currently uses the entire ground floor of Riquet, almost all of the -1 level and a few parking spaces for trucks at the -2 level. Surfaces are unused: About 500 m² on level -1 and about 5000 m² on levels -2 and -3., translated_summary)
Jump to navigation Jump to search
Project in France financed by DG Regio
Language Label Description Also known as
English
Creation of an reuse base and diversification of the activities of Emmaüs Défi for a significant impact in the fight against large-scale exclusion.The ERDF support will take place in phase 1 of the work.
Project in France financed by DG Regio

    Statements

    0 references
    0 references
    900,000.0 Euro
    0 references
    2,877,907.0 Euro
    0 references
    31.27 percent
    0 references
    1 June 2017
    0 references
    31 October 2018
    0 references
    EMMAUS DEFI - FONDATEUR ABBE PIERRE
    0 references
    0 references

    48°52'57.76"N, 2°23'37.61"E
    0 references
    75019
    0 references
    Cette opération a pour objet le cofinancement de la phase 1 des travaux d’aménagement et de réhabilitation des surfaces non utilisés par Emmaüs Défi dans ses locaux situé au cœur du quartier riquet-stalingrad. Emmaus utilise actuellement l’ensemble du rez-de-chaussée de Riquet, la quasi-totalité du niveau -1 et quelques places de parking pour les camions au niveau -2. Des surfaces sont inutilisées : environ 500 m² au niveau -1 et environ 5000 m² aux niveaux -2 et -3. (French)
    0 references
    The purpose of this operation is to co-finance Phase 1 of the renovation and rehabilitation of areas not used by Emmaus Défi in its premises located in the heart of the Riquet-stalingrad district. Emmaus currently uses the entire ground floor of Riquet, almost all of the -1 level and a few parking spaces for trucks at the -2 level. Surfaces are unused: About 500 m² on level -1 and about 5000 m² on levels -2 and -3. (English)