Land management including rehabilitation of recreational activities in Gęski village with a focus on environmental education and protection of biodiversity (Q132516)

From EU Knowledge Graph
Revision as of 03:54, 25 September 2020 by DG Regio (talk | contribs) (‎Removed claim: budget (P474): 185,645.0424 euro)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Land management including rehabilitation of recreational activities in Gęski village with a focus on environmental education and protection of biodiversity
Project in Poland financed by DG Regio

    Statements

    0 references
    657,492.86 zloty
    0 references
    157,798.29 Euro
    13 January 2020
    0 references
    773,521.01 zloty
    0 references
    85.0 percent
    0 references
    31 July 2018
    0 references
    30 December 2020
    0 references
    GMINA BARCIANY
    0 references

    54°13'7.7"N, 21°21'13.0"E
    0 references
    Teren realizacji Projektu położony jest we wsi Gęsiki , Gmina Barciany. Obszar opracowania – 1,39 ha, obejmuje działki nr 64, 131,141 obręb nr 15 Gęsiki. Działki są własnością Gm. Barciany. Zakres rzeczowy Projektu: 1. Bioróżnorodność - zagospodarowanie terenu: Gospodarka drzewostanem , Roślinność projektowana: sadzenie i pielęgnacja krzewów 65 szt. sadzenie drzew 47 szt. , obsadzenie terenu roślinami, w tym kwietniki 146 m2,.Łąka kwietna - 420 m2, utworzenie 2 szt. piaszczyste łachy (230 m2 + 290 m2) 2. Budowa ekologicznej ścieżki edukacyjnej: Ścieżka o nawierzchni z płyt beton. – 253,40 m2(181 mb x 1,40 szer.), wyposażenie oraz elem. edukacyjne: tablice inform. duże - szt. 3, tablice inform. małe -9szt., Altana - zielona klasa - szt. 1, pomost pływający z trapem-1szt. , ławki bez oparcia oraz ławki wraz placem -17szt. leżaki -5szt. kosze na śmieci -5szt.,luneta do obserwacji ptaków -1szt., rzeźby ze stali -7szt.(prezentujące gatunki zwierząt) ,tabliczki z nazwami gat. roślin – 60szt. Pozostałe elementy małej architektury: ul dla murarek, budka dla ptaków i nietoperzy -2szt.,pływająca platforma dla ptaków, stojaki na rowery -2szt., łodzie-siedziska przy pomoście -3szt. ,głazowisko z kamienia naturalnego - Wykonanie monitoring bezpieczeństwa (TIK). 3. Rekultywacja stawu rekreacyjnego : - Pogłębienie zbiornika wodnego wraz z wyprofilowaniem dna ( odwodnienie, oczyszczenie , roboty ziemne, karczowanie, skarpowanie i plantowanie nasypów) Szczegółowy zakres robót jest opisany w zał. nr 1 Studium wykonalności. Etapy realizacji Projektu: - etap przygotowawczy - opracowano dokument. techniczną i konkursową, - etap wyboru wykonawcy inwestycji - zgodnie z PZP realizacja inwestycji - wykonanie i odbiór robót, - końcowe rozliczenie rzeczowe i finansowe. Projekt wpisuje się w założenia SzOOP RPO WWM poprzez Cel szczegółowy:Lepsze mechanizmy ochrony bioróżnorodności w regionie - zachowując, zabezpieczając i zwiększając bioróżnorodność terenu objętego Projektem. (Polish)
    0 references
    The project area is located in the village of Gęsika, the municipality of Barciana. The area of development — 1.39 ha, includes parcels No 64, 131,141, No 15, Gęsiki. The plots are owned by Gm. Material scope of the Project: 1. Biodiversity — land management: Forest stand economy, design plants: planting and cultivation of 65 plants with 47 planting of trees Planting, including the April 146 m², of the plant, i.e. 420 m² for April, 2 m² of sand (230 m² + 290 m²). Building a green educational pathway: The pavement path of the concrete plate. — 253.40 m² (181 mb x 1,40), educational equipment and fittings: large boards — units 3, notice boards, small -9st., Altana — green class — 1, bridge, floating at 1ht. Benches with no backrest and lay with a bench of -17 counts — 5 garbage bins -5k bins, lugs for the observation of birds -1 t., carvings of steel and 7st. (presenting the animal species), a plate with the names of the plant (60s). Other small architectural features: UL for murek, bug for birds and bats, -2ht., a floating platform for birds, bicycle racks -2ht., a seat-desk at the monument -3st. The environment of natural stone — implementation of security (ICT). 3. Recreation of the recreation centre: — A depth of the water reservoir along with the bottom profiling (dehydration, purification, ground work, grubbing, handling and planning of embankments) Detailed description of the works is described in Annex 1 of the feasibility study. Project implementation stages: The preparatory phase — the preparation of a technical and a competition document — the stage of selecting the contractor for the investment — in accordance with the PHP, the implementation of the investment — execution and acceptance of the works, — final real and financial settlement. The project is part of the establishment of the ROP WWM through the specific objective: better mechanisms to protect biodiversity in the region while preserving, safeguarding and enhancing the biodiversity of the area covered by the project. (English)
    0 references

    Identifiers

    RPWM.05.03.00-28-0010/19
    0 references