Flood protection and improving the water catchment water catchment area of Kościerzyna city (Q122515)

From EU Knowledge Graph
Revision as of 03:25, 25 September 2020 by DG Regio (talk | contribs) (‎Removed claim: budget (P474): 5,899,033.6056 euro)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Flood protection and improving the water catchment water catchment area of Kościerzyna city
Project in Poland financed by DG Regio

    Statements

    0 references
    17,205,514.68 zloty
    0 references
    4,129,323.52 Euro
    13 January 2020
    0 references
    24,579,306.69 zloty
    0 references
    70.0 percent
    0 references
    1 February 2017
    0 references
    30 September 2020
    0 references
    GMINA MIEJSKA KOŚCIERZYNA
    0 references
    0 references
    Przedmiotem projektu są działania usytuowane w spływie wód rzeki Wierzycy. Są to zadania zmierzające do odpowiedniego zagospodarowania wód opadowych i roztopowych stanowiących zagrożenie powodziowe dla obszaru miasta Kościerzyna. W ramach projektu zostaną zrealizowane 4etapy: I-Osiedle Zachód:budowa systemu kan. deszczowej o dł.5,95km z budową 2 zbiorników retencyjnych o poj.2201 m3, II-Osiedle Tysiąclecie II:budowa systemu kan. deszczowej o dł.3,45km z budową 2 zbiorników retencyjnych o poj.3945 m3, III-Osiedle Za Torami:budowa systemu kan. deszczowej o dł.5,57km z budową 3 zbiorników retencyjnych o poj.6680 m3, IV-regulacja zlewni rzeki Bibrowej:budowa systemu kan.deszczowej o dł.0,40km z budową 1 zbiornika retencyjnych o poj.4940 m3 oraz wykonanie łuku rzeki Bibrowej z odbudową koryta i systemu podczyszczania wód opadow. Pojemność obiektów małej retencji-17766m3 Długość sieci kan. deszczowej-15,37 km Liczba ludności odnoszącej korzyści ze środków ochrony przeciwpowodziowej-21 480os. (Polish)
    0 references
    The project involves activities in the water catchment area of the river basin. These are tasks for the appropriate management of rainwater and mites, which constitute a flood risk for the area of the town of Kościerzyna. The project will implement 4 steps: I-Osiedle West: construction of the storm-rain system with 5.95 km of the construction of 2 retention basins for the purposes of 2 201 m³ for the construction of 3,45 retention basins for the purpose of 3 945 km with the construction of 2 water retention basins for the construction of 5,57 retention basins for the provision of 6 680 m³ for the construction of 3 water retention basins, with the construction of 0,40 water retention basins for the construction of 4940 water retention basins, with the construction of water retention basins for the construction of 1 water retention basins, with the construction of retention basins for a term of m³, and the arc of the river Bibrut from the reconstruction of the river basin and the water pre-treatment system. Cubic capacity and -17 766 m³ length of the canton network and the population affected by the flood protection measures -21 480os. (English)
    0 references

    Identifiers

    RPPM.11.01.00-22-0015/16
    0 references