Reduce the low emissions in the municipality of Muszyna by exchange of sources of heat in individual households for heat sources using solid fuels (Q112477)

From EU Knowledge Graph
Revision as of 02:35, 25 September 2020 by DG Regio (talk | contribs) (‎Removed claim: budget (P474): 205,005.0624 euro)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Reduce the low emissions in the municipality of Muszyna by exchange of sources of heat in individual households for heat sources using solid fuels
Project in Poland financed by DG Regio

    Statements

    0 references
    839,997.18 zloty
    0 references
    201,599.32 Euro
    13 January 2020
    0 references
    854,187.76 zloty
    0 references
    98.34 percent
    0 references
    1 February 2017
    0 references
    31 December 2019
    0 references
    MIASTO I GMINA UZDROWISKOWA MUSZYNA
    0 references
    0 references
    Przedmiotem projektu jest realizacja działań zw. z wymianą starych kotłów na kotły na ekogroszek spełniające określone parametry wraz z dofinansowaniem prac związanych z koniecznością przygotowania określonych instalacji. W ramach projektu dofinansowane będą działania związane z demontażem starego źródła ciepła, tj. jego likwidacją oraz jednocześnie związane z zakupem i montażem nowego źródła ciepła. Przewiduje się również dofinansowanie drobnych prac związanych z wymianą i zakupem armatury, osprzętu m.in.: grzejniki, wkłady kominowe. Podkreślić należy, że szczegółowy zakres niezbędnych do przeprowadzenia prac będzie wynikał z przeprowadzonej oceny energetycznej każdego budynku objętego projektem. W ramach wsparcia udzielonego w projekcie, możliwe będzie również wykonanie wewnętrznej instalacji centralnego ogrzewania i ciepłej wody użytkowej. W ramach katalogu wydatków kwalifikowanych mieści się również dok. projektowa. Zakłada się, że wymianie podlegać będzie 102 kotłów oraz instalacji. Zakres projektu zostanie zrealizowany poprzez wykonanie następujących działań:1. Opracowanie analizy finansowej i ekonomicznej.2. Wymiana kotłów pieców, urządzeń grzewczych na paliwa stałe na źródła ciepła wykorzystujące paliwa stałe z dostosowaniem instalacji do potrzeb nowego urządzenia3. Podniesienie świadomości ekologicznej społeczeństwa4. Zarządzanie i promocja projektu koszty ryczałtoweParametry źródeł ciepła, tj. urządzeń grzewczych na paliwa stałe, zostaną określone na podstawie przeprowadzonej oceny energetycznej budynku. Wszystkie wydatki ponoszone w projekcie przedstawiały będą optymalną relacje jakości do ceny. Zastosowane w projekcie rozwiązania spełniać będą obowiązujący od końca 2020 warunek minimalnego poziomu efektywności energetycznej i normy emisji zanieczyszczeń, określone w środkach wykonawczych do dyrektywy 2009125WE z 21.10.2009 ustanawiającej ogólne zasady ustalania wymogów dotyczących ekoprojektu dla produktów związanych z energią. (Polish)
    0 references
    The project relates to the implementation of measures for the replacement of old boilers on ecoplant boilers, which meet certain parameters, with subsidies for the preparation of certain installations. The project will finance actions related to the dismantling of the old heat source, i.e. decommissioning, and at the same time the purchase and installation of a new heat source. It is also envisaged to fund small work related to the replacement and purchase of fittings, fittings, inter alia: radiators, flues. It should be pointed out that the detailed scope for carrying out the work will be the result of the energy assessment of each building covered by the project. As part of the support provided by the project, it will also be possible to carry out the internal installation of central heating and domestic hot water. A project document is also included in the list of eligible expenditure. It is assumed that 102 boilers and installations will be replaced. The scope of the project will be achieved through the implementation of the following actions: 1. Preparation of financial and economic analysis.2. Replacement of boilers, heating equipment on solid fuel sources using solid fuel and adapting the installation to the needs of the new installation (3). To raise the awareness of the organic society (4). The management and promotion of the project costs of the flat-rate costs of heat sources, i.e. heating appliances on solid fuels, will be determined on the basis of the energy assessment of the building. All expenditure incurred in the project will provide optimal value for money. The design of the solution will comply with the minimum energy efficiency and pollutant emission standards in force at the end of 2020, as laid down in the implementing measures of Directive 2009125EC of 21.10.2009 establishing a framework for the setting of ecodesign requirements for energy-related products. (English)
    0 references

    Identifiers

    RPMP.04.04.03-12-0253/17
    0 references