Development, reconstruction and renovation of the existing buildings of the Primary School with the construction of a gym at school in Ostaszewo. (Q98332)

From EU Knowledge Graph
Revision as of 01:38, 25 September 2020 by DG Regio (talk | contribs) (‎Removed claim: budget (P474): 295,818.4056 euro)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Development, reconstruction and renovation of the existing buildings of the Primary School with the construction of a gym at school in Ostaszewo.
Project in Poland financed by DG Regio

    Statements

    0 references
    1,019,118.75 zloty
    0 references
    244,588.5 Euro
    13 January 2020
    0 references
    1,232,576.69 zloty
    0 references
    82.68 percent
    0 references
    30 May 2018
    0 references
    31 December 2019
    0 references
    GMINA ŁYSOMICE
    0 references
    Wnioskowana inwestycja dotyczy termomodernizacji dwóch budynków Szkoły Podstawowej w Ostaszewie, jest częścią większej inwestycji pod nazwą ,, Rozbudowa, przebudowa i termomodernizacja istniejących budynków Szkoły Podstawowej wraz z budową sali gimnastycznej przy szkole w miejscowości Ostaszewo’’. Planowane do dofinansowania zadania obejmują prace termomodernizacyjne dotyczą dwóch budynków szkoły Podstawowej w Ostaszewie oznaczonych w projekcie budowlanym jako budynki B i C. Prace termomodernizacyjne planowane do wykonania w budynku B :1. Wykonanie wewnętrznej instalacji c.w.u. z cyrkulacją i zasobnikiem zasilanym z kotłowni gazowej,2. Docieplenie ścian zewnętrznych nieocieplonych (z naprawą elewacji),3. Wymiana (pozostałych do wymiany) okien zewnętrznych na okna PCV,4. Docieplenie podłogi na gruncie (z wykonaniem nowej posadzki),5. Docieplenie stropodachu niewentylowanego (wraz z usunięciem istniejącego docieplenia i robotami towarzyszącymi),6. Wymiana (pozostałych do wymiany) drzwi zewnętrznych na drzwi,7. Docieplenie ścian zewnętrznych ocieplonych (wraz z demontażem istniejącego docieplenia),8. Rezygnacja z lokalnej kotłowni węglowej, wykonanie nowej kotłowni gazowej wraz z wymianą wewnętrznej instalacji c.o. i montażem urządzeń regulacyjnychPrace termomodernizacyjne przewidziane do wykonania w budynku C:1.Docieplenie ścian zewnętrznych od wewnątrz mineralnymi płytami izolacyjnymi,2.Wymiana (pozostałych do wymiany) okien zewnętrznych na okna PCV,3.Wykonanie wewnętrznej instalacji c.w.u. z cyrkulacją i zasobnikiem zasilanym z kotłowni gazowej,4.Docieplenie stropu pod nieogrzewanym poddaszem (z usunięciem istniejącej polepy i niezbędnymi robotami towarzyszącymi),5.Docieplenie podłogi na gruncie (z wykonaniem nowej posadzki),6.Wymiana (pozostałych do wymiany) drzwi zewnętrznych na drzwi,7.Rezygnacja z lokalnej kotłowni węglowej, wykonanie nowej kotłowni gazowej wraz z wymianą wewnętrznej instalacji c.o. i montażem urządzeń regulacyjnych. (Polish)
    0 references
    The investment requested concerns the thermal modernisation of the two buildings of the Primary School in Ostazewie, is part of a larger investment called, Expansion, rebuilding and thermo-modernisation of the existing buildings of the Primary School with the construction of a gym at a school in Ostanzewo’. The tasks planned for the grant of funding consist of the thermal modernisation works of two buildings of the Primary School in Ostaszewie, marked in the construction project as buildings B and C. Thermal modernisation works to be carried out in the B Building: 1. Internal installation for gas storage hot water installations and storage medium, 2. Insulation of non-insulated external walls (with repair of façade), 3. Replacement of external windows on PVC windows, 4. Floor insulation of the floor on the ground (with the execution of the new floor), 5. Insulation of the non-ventilated valve (with the existing insulation and accompanying works), 6. Replacement of external doors for doors, 7. Insulation of insulation walls (including the dismantling of existing thermal insulation), 8. The abandonment of the local coal boiler, the installation of a new gas-fired boiler, including the replacement of the domestic heating system. and the installation of regulatory equipment for the purpose of regulating the thermal modernisation works to be carried out in the C: 1.insulation of external walls from inside the mineral plates, 2.Replacement of the outer windows on the PVC window, 3.Performance of the floor on the ground (with the necessary accompanying works), 5.insulation of the floor on the ground (with the use of new flooring), 6.Replacement of the exterior door to the door, 7.Replacement of the local carbon boiler, operation of a new gas boiler, including the replacement of the domestic plant and the installation of regulatory equipment. (English)
    0 references

    Identifiers

    RPKP.03.05.01-04-0006/18
    0 references